United States Nuclear Regulatory Commission - Protecting People and the Environment

AREVA

Life cycle timeline showing current status, consisting of 6 various stages of status (Pre-Licensing, Licensing, Construction, Operating, Operating with Intent to Decommission, Decommissioning) with the current status shown in bright green color, and the other available status are greyed out

Areva NP Inc., Richland, WA  

Location: Richland, WA
Licensee: AREVA Inc.
Operating License: SNM-1227
License Expires: 04/24/2049
Docket Number: 07001257

Facility Type: Fuel Fabrication
Facility Status: Operational

Press Releases
Upcoming Meetings
Past Meetings

Operating with Intent to Decommission

No content exists for this section at this time.

Back to top

Decommissioning

No content exists for this section at this time.

Back to top

Page Last Reviewed/Updated Tuesday, March 14, 2017