Home > NRC Library > ADAMS Public Documents
Seabrook Station - Updated Final Safety Analysis Report, Rev. 23
Accession Number: ML25132A193
Date Released: Tuesday, August 12, 2025
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML25132A063 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 1, Introduction And General Description of Plant (5/12/2025)
- ML25132A089 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Site Characteristics (5/12/2025)
- ML25132A106 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Site Characteristics (5/12/2025)
- ML25132A112 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Figures (5/12/2025)
- ML25132A113 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Figures (5/12/2025)
- ML25132A114 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Figures (5/12/2025)
- ML25132A115 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Figures (5/12/2025)
- ML25132A117 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Figures (5/12/2025)
- ML25132A119 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Figures (5/12/2025)
- ML25132A120 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2A, Onsite Meteorological Data Summaries November 1971 - March 1973 (5/12/2025)
- ML25132A121 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2B, Onsite Meteorological Data Summaries April 1979-March 1980 (5/12/2025)
- ML25132A124 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton- Newbury Fault). Newbury. Massachusetts, and Portsmouth Fault Investigations (5/12/2025)
- ML25132A125 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area (5/12/2025)
- ML25132A126 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity (5/12/2025)
- ML25132A127 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings. July 1974 (5/12/2025)
- ML25132A128 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2G, Static Dynamic Rock Properties (5/12/2025)
- ML25132A130 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2J, Sample Descriptions for Borings Made in November - December 1972 (5/12/2025)
- ML25132A131 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 2, Appendix 2L, Geologic Investigation of Soils and the Bedrock Surface at Unit 2 Containment Site, Seabrook Station (5/12/2025)
- ML25132A134 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Design of Structures, Components, Equipment and Systems (5/12/2025)
- ML25132A135 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Figures (5/12/2025)
- ML25132A137 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Figures (5/12/2025)
- ML25132A136 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Figures (5/12/2025)
- ML25132A139 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Appendix 3A, Pipe Break Analysis Summary (5/12/2025)
- ML25132A140 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Appendix 3D, Procedure for Calculating Elasto-Plastically Designed Pipe Ship Restraint Loads by Energy Balance Methods (5/12/2025)
- ML25132A143 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Appendix 3G, Containment Liner Anchor Load Tests (5/12/2025)
- ML25132A146 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Appendix 3C, Load Cell Calibration and Original Data (5/12/2025)
- ML25132A147 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 3, Appendix 3I, Report of Analysis of High Energy Line Breaks Outside Containment (5/12/2025)
- ML25132A152 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 4, Reactor (5/12/2025)
- ML25132A153 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System and Connected Systems (5/12/2025)
- ML25132A158 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 6, Engineered Safety Features (5/12/2025)
- ML25132A159 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 7, Instrumentation and Controls (5/12/2025)
- ML25132A161 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 8, Electric Power (5/12/2025)
- ML25132A163 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 9, Auxiliary Systems (5/12/2025)
- ML25132A164 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 10, Steam And Power Conversion System. (5/12/2025)
- ML25132A165 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 11, Radioactive Waste Management (5/12/2025)
- ML25132A166 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 12, Radiation Protection (5/12/2025)
- ML25132A168 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 13, Conduct of Operations (5/12/2025)
- ML25132A170 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 14, Initial Test Program (5/12/2025)
- ML25132A178 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 15, Accident Analyses (5/12/2025)
- ML25132A180 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 16, Technical Specifications (5/12/2025)
- ML25132A185 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Chapter 18, Aging Management Programs (5/12/2025)
- ML25132A188 - Seabrook Station - Fire Protection Report, Rev. 21, Evaluation and Comparison to BTP APCSB 9.5-1, Appendix A (5/12/2025)
- ML25132A191 - Seabrook Station - Fire Protection Report, Rev. 20, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R) (5/12/2025)
- ML25132A195 - Seabrook Station - Updated Final Safety Analysis Report, Rev. 23, Technical Requirements, Rev. 123 (5/12/2025)