Home > NRC Library > ADAMS Public Documents
Callaway, Unit 1, Final Safety Analysis Report Revision OL-25 AND technical Specification Bases Revision 16
Accession Number: ML21195A333
Date Released: Tuesday, December 28, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21173A343 - Callaway, Unit 1, Final Safety Analysis Report Revision OL-25 AND technical Specification Bases Revision 16 (4 page(s), 6/22/2021)
- ML21195A322 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, FSAR Change Notice Log (28 page(s), 6/22/2021)
- ML21194A313 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, List of Effective Figures (29 page(s), 6/22/2021)
- ML21194A316 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, List of Effective Sections (5 page(s), 6/22/2021)
- ML21194A317 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, List of Effective Tables (14 page(s), 6/22/2021)
- ML21194A318 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Table of Contents (10 page(s), 6/22/2021)
- ML21193A184 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant. ([EstimatedPageCount] page(s), 6/22/2021)
- ML21193A185 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 2, Site Characteristics (17 page(s), 6/22/2021)
- ML21193A246 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 2 - Figures (10 page(s), 6/22/2021)
- ML21193A186 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems (1087 page(s), 6/22/2021)
- ML21193A297 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 3 - Figures (403 page(s), 6/22/2021)
- ML21193A188 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 4 - Reactor (183 page(s), 6/22/2021)
- ML21194A374 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 4 - Figures (106 page(s), 6/22/2021)
- ML21193A189 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (206 page(s), 6/22/2021)
- ML21194A377 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 5- Figures. (6 page(s), 6/22/2021)
- ML21193A190 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (464 page(s), 6/22/2021)
- ML21194A378 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 6, Figures (225 page(s), 6/22/2021)
- ML21193A187 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (357 page(s), 6/22/2021)
- ML21194A380 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 7, Figures (57 page(s), 6/22/2021)
- ML21193A191 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 8, Electric Power (146 page(s), 6/22/2021)
- ML21194A381 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 8, Figures (10 page(s), 6/22/2021)
- ML21193A197 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems (657 page(s), 6/22/2021)
- ML21194A386 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 9, Figures (188 page(s), 6/22/2021)
- ML21193A193 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (145 page(s), 6/22/2021)
- ML21195A177 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 10, Figures (64 page(s), 6/22/2021)
- ML21193A194 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (149 page(s), 6/22/2021)
- ML21195A182 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 11 - Figures. ([EstimatedPageCount] page(s), 6/22/2021)
- ML21193A196 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 12, Radiation Protection (119 page(s), 6/22/2021)
- ML21195A192 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 12 - Figures. (18 page(s), 6/22/2021)
- ML21193A195 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 13, Conduct of Operations. (2 page(s), 6/22/2021)
- ML21193A192 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 14, Initial Test Program (4 page(s), 6/22/2021)
- ML21193A202 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 15, Accident Analysis (381 page(s), 6/22/2021)
- ML21195A286 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 15, Figures (384 page(s), 6/22/2021)
- ML21193A203 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 16, Technical Requirements. (219 page(s), 6/22/2021)
- ML21195A292 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 16 - Figures (3 page(s), 6/22/2021)
- ML21193A204 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 17, Quality Assurance (2 page(s), 6/22/2021)
- ML21193A206 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements (157 page(s), 6/22/2021)
- ML21195A288 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 18, Figures (15 page(s), 6/22/2021)
- ML21193A208 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement (83 page(s), 6/22/2021)
- ML21193A207 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Index to NRC Questions and Responses ([EstimatedPageCount] page(s), 6/22/2021)
- ML21195A290 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, NRC QR Figures (10 page(s), 6/22/2021)
- ML21195A297 - Callaway Unit 1 - Revision 164 to Operating License Amendment Index (62 page(s), 6/22/2021)
- ML21195A296 - Callaway Unit 1 - Operating License Table of Contents (1 page(s), 6/22/2021)
- ML21195A295 - Callaway Unit 1 - Renewed Operating License (12 page(s), 6/22/2021)
- ML21195A294 - Callaway Unit 1 - Revision 078 to Operating License Appendix B - Environmental Protection Plan (9 page(s), 6/22/2021)
- ML21195A293 - Callaway Unit 1 - Revision 78 to Operating License Appendix C. (3 page(s), 6/22/2021)
- ML21195A312 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, Table of Contents for NRC Orders (2 page(s), 6/22/2021)
- ML21195A307 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-02-026 Order Modifying Licenses ([EstimatedPageCount] page(s), 2/25/2002)
- ML21195A308 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-02-261 Issuance of Order for Compensatory Measures re Access Authorization (8 page(s), 1/7/2003)
- ML21195A304 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at PWRs. ([EstimatedPageCount] page(s), 2/20/2004)
- ML21195A299 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-03-009 Errata to Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at PWRs ([EstimatedPageCount] page(s), 3/14/2003)
- ML21195A311 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-03-038 Issuance of Order for Compensatory Measures re Fitness-For-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel ([EstimatedPageCount] page(s), 4/29/2003)
- ML21195A303 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-03-039 Issuance of Order for Compensatory Measures re Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security... (11 page(s), 4/29/2003)
- ML21195A300 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-03-086 Issuance of Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors (9 page(s), 4/29/2003)
- ML21195A305 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-05-007 issuance of Order for Additional Security Measures on the Transportation of Radioactive Material Quantities of Concern (36 page(s), 7/19/2005)
- ML21195A302 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-05-007 Errata Correction & Clarification of Order for Additional Security Measures on the Transportation of Radioactive Material Quantities of Concern ([EstimatedPageCount] page(s), 8/16/2005)
- ML21195A306 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-06-037 Issuance of Order to Modify Licenses with Regard to Requiring Compliance With Updated Adversary Characteristic (17 page(s), 6/22/2021)
- ML21195A301 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (37 page(s), 3/12/2012)
- ML21195A309 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-12-051 Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (40 page(s), 3/12/2012)
- ML21195A310 - Callaway Unit 1 - Revision OL-25 to Final Safety Analysis Report, EA-13-237 re Implementation of Additional Security Meassures and Fingerprinting for Unescorted Access (23 page(s), 12/30/2013)
- ML21194A295 - Callaway Unit 1 - Site Addendum, List of Effective Figures (9 page(s), 6/22/2021)
- ML21194A300 - Callaway Unit 1 - Site Addendum, List of Effective Sections (3 page(s), 6/22/2021)
- ML21194A301 - Callaway Unit 1 - Site Addendum, List of Effective Tables (5 page(s), 6/22/2021)
- ML21194A306 - Callaway Unit 1 - Site Addendum, General Table of Contents (4 page(s), 6/22/2021)
- ML21194A305 - Callaway Unit 1 - Site Addendum, Chapter 1, Introduction and General Description of Plant (1 page(s), 6/22/2021)
- ML21194A302 - Callaway Unit 1 - Site Addendum, Chapter 2, Site Characteristics (860 page(s), 6/22/2021)
- ML21194A338 - Callaway Unit 1 - Site Addendum, Chapter 2, Figures (383 page(s), 6/22/2021)
- ML21194A309 - Callaway Unit 1 - Site Addendum, Chapter 3, Design of Structures Components Equipment and Systems (61 page(s), 6/22/2021)
- ML21194A342 - Callaway Unit 1, Revision OL-25 to Final Safety Analysis Report, Chapter 3, Figures. ([EstimatedPageCount] page(s), 6/22/2021)
- ML21194A303 - Callaway Unit 1, Site Addendum, Chapter 4, Reactor (1 page(s), 6/22/2021)
- ML21194A294 - Callaway Unit 1 - Site Addendum, Chapter 8, Electric Power (15 page(s), 6/22/2021)
- ML21194A343 - Callaway Unit 1 - Site Addendum, Chapter 8, Figures (14 page(s), 6/22/2021)
- ML21194A308 - Callaway Unit 1, Site Addendum, Chapter 9, Auxiliary Systems (42 page(s), 6/22/2021)
- ML21194A347 - Callaway Unit 1 - Site Addendum, Chapter 9, Figures (12 page(s), 6/22/2021)
- ML21194A297 - Callaway Unit 1 - Site Addendum, Chapter 10, Steam Power Conversion System (6 page(s), 6/22/2021)
- ML21194A298 - Callaway Unit 1 - Site Addendum, Chapter 11, Radioactive Waste Management (26 page(s), 6/22/2021)
- ML21194A307 - Callaway Unit 1 - Site Addendum, Chapter 12, Radiation Protection (24 page(s), 6/22/2021)
- ML21194A348 - Callaway Unit 1 - Site Addendum, Chapter 12, Figure 12.5-1 Deleted (1 page(s), 6/22/2021)
- ML21194A304 - Callaway Unit 1 - Site Addendum, Chapter 13, Conduct of Operations (66 page(s), 6/22/2021)
- ML21194A349 - Callaway Unit 1 - Site Addendum, Chapter 13, Figures (11 page(s), 6/22/2021)
- ML21194A311 - Callaway Unit 1 - Site Addendum, Chapter 17, Quality Assurance (2 page(s), 6/22/2021)
- ML21194A296 - Callaway Unit 1 - Site Addendum, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements (1 page(s), 6/22/2021)
- ML21194A299 - Callaway Unit 1 - Site Addendum, NRC_QR (66 page(s), 6/22/2021)
- ML21194A289 - Callaway Unit 1 - Technical Specification, List of Effective Pages (6 page(s), 6/22/2021)
- ML21194A288 - Callaway Unit 1 - Technical Specification, Table of Contents (4 page(s), 6/22/2021)
- ML21194A279 - Callaway Unit 1 - Technical Specification, Chapter 1.0, Use and Application (30 page(s), 6/22/2021)
- ML21194A281 - Callaway Unit 1 - Technical Specification, Chapter 2.0, Safety Limits (SLs) (2 page(s), 6/22/2021)
- ML21194A278 - Callaway Unit 1 - Technical Specification, Chapter 3, Limiting Condition for Operation (LCO) and Surveillance Requirement (SR) Applicability (6 page(s), 6/22/2021)
- ML21194A280 - Callaway Unit 1 - Technical Specification, Chapter 3.1, Reactivity Control Systems (26 page(s), 6/22/2021)
- ML21194A283 - Callaway Unit 1 - Technical Specification, Chapter 3.2, Power Distribution Limits (14 page(s), 6/22/2021)
- ML21194A275 - Callaway Unit 1 - Technical Specification, Chapter 3.3, Instrumentation (86 page(s), 6/22/2021)
- ML21194A282 - Callaway Unit 1 - Technical Specification, Chapter 3.4, Reactor Coolant System (50 page(s), 6/22/2021)
- ML21194A277 - Callaway Unit 1 - Technical Specification, Chapter 3.5, Emergency Core Cooling Systems (ECCS) (14 page(s), 6/22/2021)
- ML21194A285 - Callaway Unit 1 - Technical Specification, Chapter 3.6, Containment Systems (25 page(s), 6/22/2021)
- ML21194A284 - Callaway Unit 1 - Technical Specification, Chapter 3.7, Plant Systems (54 page(s), 6/22/2021)
- ML21194A287 - Callaway Unit 1 - Technical Specification, Chapter 3.8, Electrical Power Systems (44 page(s), 6/22/2021)
- ML21194A291 - Callaway Unit 1 - Technical Specification, Chapter 3.9, Refueling Operations (15 page(s), 6/22/2021)
- ML21194A290 - Callaway Unit 1 - Technical Specification, Chapter 4.0, Design Features (4 page(s), 6/22/2021)
- ML21194A286 - Callaway Unit 1 - Technical Specification, Chapter 5.0, Administrative Controls (33 page(s), 6/22/2021)
- ML21195A321 - Callaway Unit 1 - Technical Specification Bases Implemented Change Notice Log (9 page(s), 6/22/2021)
- ML21194A273 - Callaway Unit 1 - Technical Specification Bases, List of Effective Sections (2 page(s), 6/22/2021)
- ML21194A269 - Callaway Unit 1 - Technical Specification Bases, Table of Contents (4 page(s), 6/22/2021)
- ML21194A267 - Callaway Unit 1 - Technical Specification Bases, Chapter 2.0, Safety Limits (SLs) (8 page(s), 6/22/2021)
- ML21194A264 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.0, Safety Limits (SLs) (17 page(s), 6/22/2021)
- ML21194A266 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.1, Reactivity Control Systems (60 page(s), 6/22/2021)
- ML21194A272 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.2, Power Distribution Limits (30 page(s), 6/22/2021)
- ML21194A262 - Callaway Unit 1 - Technical Specification Bases, Chapter 3.3, Instrumentation (215 page(s), 6/22/2021)
- ML21194A270 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.4, Reactor Coolant System (113 page(s), 6/22/2021)
- ML21194A263 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.5, Emergency Core Cooling Systems (ECCS) (40 page(s), 6/22/2021)
- ML21194A265 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.6, Containment Systems (50 page(s), 6/22/2021)
- ML21194A261 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.7, Plant Systems (122 page(s), 6/22/2021)
- ML21194A268 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.8, Electrical Power Systems (98 page(s), 6/22/2021)
- ML21194A271 - Callaway Unit 1 - Technical Specification Bases, Chapter B 3.9, Refueling Operations (38 page(s), 6/22/2021)
- ML21196A286 - Callaway Unit 1 - Site Addendum, Chapter 3, Design of Structures, Components, Equipment and System (61 page(s), 6/22/2021)
- ML21348A749 - Callaway FSAR Revision 25 Chapter 1 Figures Redacted (EPID: L-2021-LRO-0032) (52 page(s), 12/16/2021)