Home > NRC Library > ADAMS Public Documents
Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report
Accession Number: ML19259A201
Date Released: Friday, September 20, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19101A144 - Transmittal of Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report. (21 page(s), 3/22/2019)
- ML19101A150 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant. (296 page(s), 3/22/2019)
- ML19101A154 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.3.1 through 2.3.11. (12 page(s), 3/22/2019)
- ML19101A158 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Onsite Meteorological Data Summaries November 1971 - March 1973. (101 page(s), 3/22/2019)
- ML19101A159 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Onsite Meteorological Data Summaries April 1979 - March 1980. (41 page(s), 3/22/2019)
- ML19101A160 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Geologic Investigation of the Scotland Road Fault (Clinton - Newbury Fault) Newbury, Massachusetts, and Portsmouth Fault Investigations. (145 page(s), 3/22/2019)
- ML19101A161 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area. (116 page(s), 3/22/2019)
- ML19101A162 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity. (135 page(s), 3/22/2019)
- ML19101A163 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2F, Geotechnical Report, Reactor Boring, July 1974. (82 page(s), 3/22/2019)
- ML19101A164 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2g, Static Dynamic Rock Properties. (102 page(s), 3/22/2019)
- ML19101A165 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J, Sample Descriptions for Borings Made in November-December 1972. (66 page(s), 3/22/2019)
- ML19101A166 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2L, Geologic Investigation of Soils and Bedrock Surface at Unit 2 Containment Site. (238 page(s), 3/22/2019)
- ML19101A168 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems. (755 page(s), 3/22/2019)
- ML19101A169 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems - Figures, Part 1 of 3. (54 page(s), 3/22/2019)
- ML19101A170 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems - Figures, Part 2 of 3. (53 page(s), 3/22/2019)
- ML19101A171 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems - Figures, Part 3 of 3. (51 page(s), 3/22/2019)
- ML19101A172 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems - Appendix 3A. (33 page(s), 3/22/2019)
- ML19101A173 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D, Procedure for Calculating Elasto-Plastically Designed Pipe Whip Restraint Loads by Energy Balance Method. (37 page(s), 3/22/2019)
- ML19101A174 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Containment Liner Anchor Load Tests. (29 page(s), 3/22/2019)
- ML19101A175 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Appendix C, Load Cell Calibration and Original Data. (33 page(s), 3/22/2019)
- ML19101A176 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I, Report on Analysis of High Line Breaks Outside Containment. (77 page(s), 3/22/2019)
- ML19101A177 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 4, Reactor. (231 page(s), 3/22/2019)
- ML19101A178 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems. (222 page(s), 3/22/2019)
- ML19101A179 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (504 page(s), 3/22/2019)
- ML19101A180 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation an Controls. (318 page(s), 3/22/2019)
- ML19101A182 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (675 page(s), 3/22/2019)
- ML19101A183 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (149 page(s), 3/22/2019)
- ML19101A184 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (197 page(s), 3/22/2019)
- ML19101A185 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection. (209 page(s), 3/22/2019)
- ML19101A186 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations. (38 page(s), 3/22/2019)
- ML19101A187 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program. (153 page(s), 3/22/2019)
- ML19101A188 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses. (497 page(s), 3/22/2019)
- ML19101A189 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance. (70 page(s), 3/22/2019)
- ML19101A201 - Seabrook Station Unit 1 Revision 16 to Fire Protection Safe Shutdown Capability, Appendix R. (757 page(s), 3/22/2019)
- ML19101A202 - Seabrook Station Unit 1 Revision 157 to the Technical Requirements Manual. (211 page(s), 3/22/2019)
- ML19259C182 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.1.1 through 2.1.32. REDACTED (38 page(s), 3/22/2019)
- ML19260C685 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-1 through 2.5-49, Part 1. REDACTED (50 page(s), 3/22/2019)
- ML19260C839 - Seabrook Station, Unit No. 1 - Revision 19 to Updated Final Safety Analysis Report Chapter 2.4 Figures-Redacted (33 page(s), 3/22/2019)
- ML19260D139 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics. (616 page(s), 3/22/2019)
- ML19260D071 - Seabrook Station, Unit No. 1 - Revision 19 to Updated Final Safety Analysis Report, APPENDIX A REV 17 redacted (583 page(s), 3/22/2019)
- ML19260D471 - Seabrook Station Unit 1 Revision 19 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted. (276 page(s), 3/22/2019)
- ML19261A349 - Seabrook Station, Unit 1, Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.2.1 through 2.2.15 - Redacted (15 page(s), 3/22/2019)
- ML19261B587 - Seabrook Station, Unit No. 1 - Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-5.0 through 2,5-71, Part 2 - Redacted (23 page(s), 3/22/2019)