Further response to FOIA request for documents re NRC Comanche Peak Task Force.App BB,CC & DD records available in PDR.Records partially & completely withheld (ref FOIA Exemptions 5 & 7).
Accession Number: ML18052B537
Date Released: Tuesday, October 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20199M024 - Further response to FOIA request for documents re NRC Comanche Peak Task Force.App BB,CC & DD records available in PDR.Records partially & completely withheld (ref FOIA Exemptions 5 & 7). (44 page(s), 6/30/1986)
- ML20202A953 - Rev 3 to Procedure WEI-1, "Procedure for Random RT Welder Surveillance." Related info encl. (70 page(s), 7/30/1984)
- ML20202B143 - Rev 1 to Procedure CP-CPM 7.1I, "(Non-ASME) Q Documentation Package Review." Related info encl. (34 page(s), 11/1/1984)
- ML20202A967 - Rev 6 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Sys N-5 Classification." (17 page(s), 4/12/1983)
- ML20202A997 - Rev 6 to CP-QAP-17.1, "Corrective Action." Related info encl. (26 page(s), 3/1/1984)
- ML20202B432 - Submits results of interview w/J Hullman,Brown & Root start- up support engineer,re knowledge of movement of main steam line portion using polar crane. (1 page(s), 5/3/1983)
- ML20202A946 - Rev 5 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Sys N-5 Certification." (17 page(s), 3/18/1983)
- ML20202A693 - Rev 0 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Release for Pressure Testing." (8 page(s), 2/22/1982)
- ML20202B087 - Rev 2 to CP-EI-4.6-7, "Civil Structural Engineering Group Instruction for Processing CMCs." (8 page(s), 5/14/1981)
- ML20202B349 - Partially withheld Inquiry Rept Q4-82-005 re improper weld practice allegations on 820609-10.Informs of possibly unqualified welders & use of substandard incompatible weld rods. (2 page(s), 8/2/1982)
- ML20202B457 - Rev 1 to "Nomograph for Simplified Seismic Analysis,(Piping Size Less Than Four Inches,Operating Temp Less Than 200 F)." (40 page(s), 2/28/1984)
- ML20202B525 - Partially withheld affidavit of DK Grisso re cutting through rebar. (2 page(s), 5/3/1983)
- ML20202B631 - Document Change 1 to Rev 4 to Procedure CCP-38, "Stainless Steel Liner Erection." (20 page(s), 1/5/1984)
- ML20202B395 - Discusses Case RII-84-A-0081 re potential allegation concerning past design practices.Insp on 840403-13 revealed listed items. (11 page(s), 5/9/1984)
- ML20202B464 - Submits results of interview w/JD Williams,former Brown & Root ironworker at Comanche Peak Steam Electric Station,re cutting through rebar. (1 page(s), 11/1/1983)
- ML20202A902 - Rev 3 to CP-QP-18.2, "Implementation of Permanent Plant Records Mgt Sys." Related info encl. (39 page(s), 4/25/1984)
- ML20202B297 - Partially withheld Rept of Inquiry Q4-83-023 re alleged poor mgt practices. (2 page(s), 9/20/1986)
- ML20199M047 - Rev 8 to Procedure ECP-10, "Cable Tray & Hangers Installation." Related info encl. (573 page(s), 8/31/1984)
- ML20202A708 - Rev 2 to Const Procedure 35-1195-DCP-3, "Reproduction." (11 page(s), 7/23/1975)
- ML20202B334 - Rev 5 to Procedure AB-5, "Simplified Method For Design & Analysis of Small Size Piping." (200 page(s), 5/31/1982)
- ML20202D552 - Rev 1 to,"Pipe Support Design Group General Instructions for Pipe Analysis Group." (20 page(s), 5/1/1981)
- ML20202B111 - Rev 4 to CP-QAP-2.3, "QA Manual Rev & Control." (8 page(s), 6/11/1984)
- ML20202B636 - Rev 3 to Procedure WEI-1, "Procedure for Random Radiographic Test Welder Surveillance." Related info encl. (10 page(s), 7/30/1984)
- ML20202A860 - Rev 7 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Sys N-5 Certification (22 page(s), 6/29/1983)
- ML20202A832 - Rev 1 to CP-QAP-19.1, "QA Audits." (29 page(s), 12/9/1982)
- ML20266E794 - "Reference Dwg for Hanger Nos." Sheet 2 of 3. (1 page(s), 5/29/1984)
- ML20202B070 - Rev 1 to CP-EI-4.6-7, "Field Structural Engineering Group Instruction for Processing CMCs." (7 page(s), 7/18/1980)
- ML20202B355 - Discusses potential allegation re past design practices at facility per 840327-28 insp at Duke Power Co design ofcs & conversation w/A Taufique concerning alternative analysis method used at facility 4 yrs ago.Related info encl. (2 page(s), 4/2/1984)
- ML20202B174 - Partially withheld errata to Supplemental Assistance to Insp Rept A4-83-001 re alleged defects in pipe hangers. (10 page(s), 1/31/1983)
- ML20199M087 - Rev 1 to DEI-9, "Control of CMCs Generated for Component Support Hanger Packages." (1 page(s), 8/20/1981)
- ML20202A973 - Rev 3 to Procedure QI-QAP-10.2-1, "Liquid Penetrant Exam." Related info encl. (136 page(s), 2/18/1983)
- ML20202C992 - Interim Change Notice 1 to Rev 8 to Const Procedure 35-1195-DCP-3, "Document Control Reproduction Process." (22 page(s), 12/7/1978)
- ML20202B376 - Forwards details of work conducted by inspector during visit to facility per Case RII-84-A-0081 re potential allegations concerning past design practices. (3 page(s), 5/14/1984)
- ML20202C972 - Rev 8 to CP-QP-7.1, "Issuance & Control of Quality Procedures & Instructions." (9 page(s), 2/2/1984)
- ML20202B095 - Rev 0 to CP-CPM 7.1, "Package Flow Control." (6 page(s), 2/7/1984)
- ML20202B569 - Rev 1 to CP-CPM 7.1G, "Piping Supports." (7 page(s), 8/31/1984)
- ML20202B002 - Rev 4 to CP-QAP-5.1, "QA Review of Procurement Documents." (16 page(s), 7/28/1983)
- ML20202B051 - Rev 0 to CP-EI-4.0-3, "Instruction for Control of Design Documents." (3 page(s), 5/28/1980)
- ML20202B380 - Forwards errata to 830520 Assistance to Insp Rept A4-83-005. Encl signed,sworn statements inadvertently omitted. (2 page(s), 6/2/1983)
- ML20202B413 - Partially withheld affidavit of DA Fellinger re cutting through rebar. (2 page(s), 5/9/1983)
- ML20266E785 - "Aux & Elec Cont Bldgs Cable Tray Support Plan,EL 792 Ft 0 Inches & 790 Ft 6 Inches." Sheet 1 of 3. (1 page(s), 5/29/1984)
- ML20202B437 - Partially withheld affidavit of R Yockey re 820714 meeting concerning Brown & Root personnel policies. (4 page(s), 1/24/1984)
- ML20202B518 - Partially withheld affidavit of ME Sanders re cutting through rebar. (2 page(s), 5/3/1983)
- ML20202B046 - Rev 9 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Sys N-5 Classification." (23 page(s), 8/19/1983)
- ML20202A726 - Rev 3 to Const Procedure 35-1195-DCP-3, "Reproduction." (9 page(s), 12/1/1975)
- ML20202A877 - Rev 1 to QI-QAP-11.1-28, "Installation of Insps of ASME Component Supports,Class 1.2 & 3." (9 page(s), 9/11/1980)
- ML20202A765 - Rev 2 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Release for Pressure Testing." (8 page(s), 5/11/1982)
- ML20202B467 - Rev 12 to Instruction CP-EI-4.0-13, "Control of Site Scope Stress Analysis Activities." Related info encl. (175 page(s), 2/7/1985)
- ML20202B622 - Rev 1 to Spec 2323-SS-7, "Refueling Gates." Related info encl. (31 page(s), 1/28/1976)
- ML20202A988 - Rev 2 to Procedure CP-QP-18.5, "Augmented Records Mgt Sys Implementation." Related info encl. (16 page(s), 12/2/1980)
- ML20202D533 - Submits results of 830901 interview w/E Kelly,former Brown & Root millwright at Comanche Peak,re cutting through rebar. (1 page(s), 9/1/1983)
- ML20202B199 - Rev 1 to Instruction 35-1195-CEI-15, "Procedure for Installation of Containment Anchor Bolts,Nuts & Plates." (30 page(s), 8/1/1977)
- ML20202B497 - Rev 0 to "Alternate Criteria for Piping Analysis & Support Design." Related info encl. (300 page(s), 4/14/1978)
- ML20202A685 - Rev 1 to Const Procedure 35-1195-DCP-3, "Reproduction." (9 page(s), 3/21/1975)
- ML20202B204 - Partially withheld Supplemental Assistance to Insp Rept A4-83-005 re allegations of improper const practices by Brown & Root,Inc.Related info encl. (21 page(s), 11/30/1983)
- ML20202B129 - Partially withheld Assistance to Insp Rept A4-83-001 re alledged defective pipe hangers. (3 page(s), 1/24/1983)
- ML20199M099 - Rev 4 to 35-1195-DEI-7, "Document Control Computer Operations (Distribution) Group." (3 page(s), 8/31/1981)
- ML20202B281 - Marked-up affidavit of BR Jones,former Brown & Root structural ironmaker at Comanche Peak Steam Electric Station,re cutting on hangers using torches. (3 page(s), 11/22/1983)
- ML20204A759 - Rev 0 to Const Procedure 35-1195-DCP-3, "Reproduction." Related info encl. (11 page(s), 11/15/1984)
- ML20202B486 - Change Notice 1 to Rev 6 of Procedure CP-CPM-6.9G, "Documentation for ASME Welding Fabrication & Installation Activities." (44 page(s), 7/10/1984)
- ML20202B444 - Partially withheld affidavit of JR Starkey re cutting through rebar. (2 page(s), 5/4/1983)
- ML20202B324 - Partially withheld affidavit of DW Mason re cutting through rebar. (2 page(s), 5/3/1983)
- ML20202A896 - Rev 2 to QI-QAP-11.1-28, "Installation of Insps of ASME Component Supports,Class 1,2 & 3." (9 page(s), 9/15/1980)
- ML20202B552 - Rev 1 to QI-QP-11.10-2A, "Insp of Cable Tray Supports in Unit 2." (28 page(s), 8/31/1984)
- ML20202B029 - Rev 7 to QI-QP-11.3-2, "Cable Tray Hanger Insp." Related info encl. (18 page(s), 2/19/1979)
- ML20202B183 - Partially withheld affidavit of unidentified individual re welding & pipe hanger allegations at plant.Related info encl. (238 page(s), 1/9/1983)
- ML20202B062 - Rev 0 to DEI-11, "Matl Control Dept Procedure for Control of O&E Documents." (2 page(s), 10/7/1983)
- ML20202B427 - Partially withheld affidavit of RW Darby re insp of Unit 2 welds. (4 page(s), 2/29/1984)
- ML20266E766 - "Aux & Elect Cont Bldgs,Cable Tray Support Plan El 792 Ft 0 Inches & 790 Ft 6 Inches." ACTUAL DRAWING NUMBER:2323-El-0713-01-S. (1 page(s), 10/2/1979)
- ML20202B222 - Partially withheld memo forwarding highlights of alleged issues discussed in mechanical & piping area & summary of recommended followup actions,per 841031 conference call w/ alleger.Related info encl. (300 page(s), 11/5/1984)
- ML20202A812 - Rev 3 to CP-EP-4.0, "Design Control." (3 page(s), 6/11/1982)
- ML20202B450 - Partially withheld Rept of Inquiry Q4-84-011 on 830824 re alleged intimidation of balance-of-plant inspector. (3 page(s), 3/13/1984)
- ML20202B275 - Submits results of 831108 interview w/B Kerfoot,former Brown & Root ironmaker at Comanche Peak Steam Electric Station,re cutting through rebar,cuts on hangers using torches & relocation of main steam line using polar crane. (1 page(s), 11/8/1983)
- ML20202B373 - Partially withheld Rept of Inquiry Q4-84-016 re alleged improper const practices. (5 page(s), 4/16/1984)
- ML20266E859 - "Transfer Canal Gate Frame Assembly." Sheet 1. (1 page(s), 7/14/1977)
- ML20202B076 - Rev 10 to QI-QP-11.3-24, "Class IE Cable Tray Raceway Insps." Related info encl. (18 page(s), 3/21/1984)
- ML20202A873 - Rev 5 to QI-QAP-11.1-25, "QA Review of ASME III Documentation." (10 page(s), 8/28/1980)
- ML20202B116 - Rev 1 to CP-EI-4.0-4, "Field Structural Engineering Group Design Control Instruction." (10 page(s), 12/14/1981)
- ML20202B538 - Partially withheld affidavit of HD Bogart re installation of pipe hangers. (2 page(s), 5/4/1983)
- ML20202A712 - Rev 1 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Release for Pressure Testing." (9 page(s), 3/10/1982)
- ML20202B159 - Rev 1 to "Comanche Peak Seismic Interaction Criteria." Related info encl. (124 page(s), 11/10/1982)
- ML20202B548 - Partially withheld affidavit of TM Commons re relocation of main steam line. (2 page(s), 5/6/1983)
- ML20266E863 - "Fuel Pool Liner Embeds & Plates,ID N-25 - Fuel Bldg." Sheet 12. (1 page(s), 4/21/1983)
- ML20202A934 - Rev 2 to CP-QP-18.5, "Automated Records Mgt Sys Implementation." (4 page(s), 12/2/1980)
- ML20202B587 - Change Notice 1 to Rev 1 to CP-CPM 7.1, "Package Flow Control." (16 page(s), 7/5/1984)
- ML20202A801 - Rev 6 to Const Procedure 35-1195-DCP-3, "Reproduction." (19 page(s), 10/10/1977)
- ML20202B564 - Rev 4 to Procedure CP-EI-4.0-13, "Control of Stress Analysis for Pipe Support Engineering." Related info encl. (21 page(s), 1/5/1982)
- ML20202A785 - Interim Change Notices 1 & 2 to Rev 5 to Const Procedure 35-1195-DCP-3, "Reproduction." Related info encl. (338 page(s), 3/7/1977)
- ML20202A980 - Change Notice 1 to Rev 12 to CP-CPM 9.10, Fabrication of ASME-Related Component Supports." (38 page(s), 10/5/1984)
- ML20202B368 - Partially withheld Inquiry Rept Q4-82-0011 re alleged Energy Reorganization Act,Section 210 violation concerning Brown & Root,Inc QA inspector termination.Inspector terminated for trying to submit rept re Hilti bolt installation. (2 page(s), 8/2/1982)
- ML20202A776 - Rev 3 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Release for Pressure Testing." (10 page(s), 5/20/1982)
- ML20202B417 - Rev 6 to Spec 2323-MS-46A, "Nuclear Safety Class Pipe Hangers & Supports." (11 page(s), 6/26/1984)
- ML20266E868 - "Transfer Canal Gate Frame Assembly." Sheet 1. (1 page(s), 7/14/1977)
- ML18052B536 - Interim Change Notices 1,2,3 & 4 to Rev 4 to Const Procedure 35-1195-DCP-3, "Reproduction." (2 page(s), 6/30/1976)
- ML20202A837 - Interim Change Notices 1 & 2 to Rev 7 to Const Procedure 35-1195-DCP-3, "Document Control Reproduction Process." (30 page(s), 8/22/1978)
- ML20202B042 - Rev 3 to CP-EI-4.0-4, "Field Structural Engineering Group Design Control Instruction." (5 page(s), 2/27/1984)
- ML20199M072 - Rev 8 to QI-QAP-11.1-25, "QA Review of ASME III Documentation." (11 page(s), 8/6/1981)
- ML20202B408 - Partially withheld affidavit of unidentified author re insp of hanger welds & alleged intimidation. (6 page(s), 9/15/1983)
- ML20202C946 - Change 1 to Rev 5 to Procedure CI-CPM 8.2, "Control of Spare Parts." Related info encl. (200 page(s), 4/29/1983)
- ML20202B023 - Rev 8 to CP-QAP-12.1, "Insp Criteria & Documentation Requirements Prior to Sys N-5 Certification." (23 page(s), 8/3/1983)
- ML20202B480 - Submits results of 831102 interview w/R Hamilton,former Brown & Root,Inc ironworker,re cutting through rebar,cutting hanger w/torch,relocation of main steam line portion & intimidation. (2 page(s), 11/2/1983)
- ML20266E781 - "Ref Dwg for Hanger Nos." Sheet 3 of 3. (1 page(s), 5/29/1984)
- ML20202A854 - Rev 7 to QI-QAP-11.1-20, "Insp of ASME Component Support." (12 page(s), 8/22/1980)
- ML20202B576 - Advises that item of noncompliance noted in Insp Repts 50-445/80-15 & 50-446/80-15 re drawing notes ref procedures downward classified form infraction to deficiency.Action due to util attitude.Related info encl. (1 page(s), 7/21/1980)
- ML20202B105 - Change Notices 1-6 to Rev 5 to ECP-10, "Cable Tray & Hangers Installation." (19 page(s), 9/29/1981)
- ML20202B402 - Partially withheld affidavit of CE Neagle re cutting through rebar. (2 page(s), 5/4/1983)
- ML20202B215 - Insp Repts 50-445/79-26 & 50-446/79-25 on 791011-22.Three allegations of improprieties in civil const phase were found to be factual but had already been corrected in QA program. (10 page(s), 11/8/1979)
- ML20202A927 - Rev 91 to QI-QCP-1.1-0, "Mechanical QC Discipline Manual Table of Contents." (3 page(s), 10/6/1980)
- ML20202B598 - Rev 0 to Instruction QI-QP-11.11-1, "Installation Insps of Class 5 Pipe Supports." Related info encl. (237 page(s), 7/25/1980)
- ML20202B133 - Rev 27 to QI-QP-11.10-2, "Cable Tray Hanger Insp." (15 page(s), 6/19/1984)
- ML20202B420 - Rev 2 to CP-EI-4.0-4, "Field Structural Engineering Group Design Control Instruction." (10 page(s), 6/9/1983)