Further response to FOIA request for documents re SSER 22 (NUREG-0675) concerning operation of plant.App B documents available in PDR.Review for addl documents continuing.
Accession Number: ML16341D666
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210E695 - Responds to request for assistance in formulating response to R Kranzdorf 831104 ltr re emergency plans & preparedness. Info provided includes evacuation time considerations, evacuation transportation routes & emergency broadcast sys. (2 page(s), 12/16/1983)
- ML20210E764 - Forwards summary of former Bostrom-Bergen/Meddco Metals employees allegations (SSER 21,Allegation 99) per 840116 request.Util currently confirming each allegation w/respective alleger. (3 page(s), 1/20/1984)
- ML20210E877 - Requests investigation of allegations of intimidation of Pullman Power Products Corp QC inspectors by Pullman const personnel & mgt.Allegation data forms & supporting documentation encl. (32 page(s), 1/21/1984)
- ML20210E728 - Discusses 831208 telcon w/listed persons re R Kranzdorf 831104 ltr concerning plant emergency planning.Notes prepared by participants in conference call being provided to FEMA for formal response. (4 page(s), 12/9/1983)
- ML20210E706 - Provides info in response to request for assistance in addressing issues raised in R Kranzdorf 831209 ltr re emergency preparedness of offsite jurisdictions.Issues addressed include flooding at "Twin Bridges" & siren sys. (2 page(s), 1/18/1984)
- ML20210E782 - Informs of discrepancies found between findings of NRC contractors 840401 exam of steel corner radius & util findings (ref SSER 22,Allegation 92/93). Response to listed questions requested by 840409.Supporting documentation encl. (348 page(s), 4/6/1984)
- ML20210E821 - Rev 0 to Procedure QCP-507, "BISCO Flexible Boot Insp." (7 page(s), 12/10/1979)
- ML20210E652 - Affidavit of AD Johnson re Joint Intervenors 830510 motion to reopen record on issue of const QA.No items of noncompliance represented major breakdown of const QA/QC programs of licensee & contractors. (69 page(s), 5/27/1983)
- ML20210E684 - Forwards examples from newspaper re concerns over plants emergency response plan. (17 page(s), 11/4/1983)
- ML20210E676 - Forwards Region V evaluation of emergency preparedness concerns expressed in 831104,1209 & 840109 ltrs included in latest plant SSER. (1 page(s), 3/23/1984)
- ML20210E733 - Submits results of 840403-05 insp of rectangular tube steel w/perimeter less than 14 inches used for Safety Class I sys, in response to P Morrill 840402 request.Data re tube steel measurements encl. (6 page(s), 4/19/1984)
- ML20210E902 - Preliminary "Bostrum-Bergen/Meddco Metals Allegations Investigation,Matls Reinsp Program Plan." Supporting documentation encl. (43 page(s), 2/23/1984)
- ML20210E917 - "Bostrom-Bergen/Meddco Metals Allegations Investigation, Matls Reinsp Program Plan." (11 page(s), 2/23/1984)
- ML20210E689 - Ack 831209 ltr providing addl data re concern about method of notifying population in case of flood.Siren concern being addressed.FEMA ltr addressing items identified in initial 831104 ltr encl. (1 page(s), 12/30/1983)
- ML20210E700 - Ack 851202 response to 841104 ltr re concerns in emergency response plans.Concerns expressed re rebuilding of "Twin Bridges" & siren backup. (16 page(s), 12/9/1983)
- ML20210E633 - Informs that 831107 telcon from H Myers of Subcommittee on Energy & Environ outlined areas of inquiry re const activities that should be evaluated.Areas of inquiry summarized in encl 831107 memo. (1 page(s), 11/15/1983)
- ML20210E620 - Rev 0 to "Project Quality Plan for Providing Assistance & Svcs to Support NRC/IE Region V Personnel in NDE & Review of Radiographs at Diablo Canyon Nuclear Power Plant Units 1 & 2." Supporting documentation encl. (220 page(s), 11/22/1983)
- ML20210E927 - Forwards response to 840222 request for addl info re Bostrom-Bergen welding procedures.Response details procedure spec qualifications. (5 page(s), 2/29/1984)
- ML20210E808 - Summary of special insp-related info,consisting of 840124 interview w/L Price re improper practices for spot checking anchor bolt angle & feelings of intimidation at site. Supporting documentation encl. (57 page(s), 1/13/1984)
- ML20210E945 - Informs of anonymous allegation received in Mar 1983 that Brand Industrial Svcs Co improperly installing penetration seals at several facilities. (1 page(s), 12/2/1983)
- ML20210E825 - Rev 1 to Procedure SP-504, "Fabrication - BISCO Flexible Boot." Work sheet & table encl. (7 page(s), 9/14/1983)
- ML20209C818 - Requests guidance re required experience for chemistry & radiation protection technicians. (1 page(s), 12/2/1983)
- ML20210E670 - Ack 831230 response to concerns over emergency response plan at plant,including FEMA response from R Vickers.FEMA response inadequate re evacuation time considerations & evacuation routes. (6 page(s), 1/9/1984)
- ML20210E802 - Discusses welding procedures & practices re use of unqualified welders & welding procedures that affect safety. Response requested.Supporting documentation encl. (19 page(s), 12/2/1983)
- ML20210E856 - Discusses Pullman QC inspector allegations received on 831223 re QC participation in welder qualification process. Deficient condition notice encl. (14 page(s), 12/23/1983)
- ML20210E740 - Discusses 840314-17 insp re licensee methods of tube steel radii measurement.Template or radius gauge method concluded to be best method of radii measurement.Tube steel measurements encl. (4 page(s), 5/21/1984)
- ML20210E710 - Forwards repts on fog & rain.Copies of questions on plant & responses to date requested.W/o encls. (1 page(s), 1/30/1984)
- ML20210E774 - "Bostron-Bergen/Meddco Metals Allegations Investigation Interim Rept." (32 page(s), 1/25/1984)
- ML20210E872 - "QA Program,Nonconformities." Supporting documentation encl. (61 page(s), 8/30/1983)
- ML20210E829 - Rev 2 to Procedure SP-505, "BISCO Flexible Boots." Boot clamp chart encl. (12 page(s), 5/13/1983)
- ML20210E598 - Requests that licensee revise 790927 & 1109 applications for OL to incorporate requirements of NUREG-0578 & NUREG-0694. Rev needed before FSAR review can be completed.Addl questions & supporting documentation encl. (14 page(s), 9/4/1980)
- ML20210E898 - Discusses 831206 allegations of falsified QC insp repts for Bostron-Bengen Metal Products shipments of pipe hangers for plant cooling sys in early 1982.Only on one two QC welder insp repts had every entry verified. (11 page(s), 12/8/1983)
- ML20210E859 - Revised Procedure ESD 240, "Field Procedure for Nonconformance Reporting." (12 page(s), 3/22/1983)
- ML20210E666 - Forwards newspaper ad re reasons for 840211 civil disobedience over plant emergency plan. (2 page(s), 2/27/1984)
- ML20210E743 - Forwards info providing evidence that plant tube steel radii issue resolved.Previous affidavit submitted by SD Reynolds remains unaffected. (1 page(s), 6/13/1984)
- ML20210E714 - Provides general concept of evacuation time estimates re baseline scenarios such as normal & adverse weather.Time estimates technically sound & based on best available data. (10 page(s), 2/1/1984)
- ML20210E591 - Forwards questions re issues arising from review of SNUPPS-Callaway radiation protection program.Applicant must respond before review can be completed. (2 page(s), 2/21/1981)
- ML20210E768 - Forwards "Bostrom-Bergen/Meddco Metals Allegations Investigations Interim Rept," per 840116 commitment.Rept provides status of investigation of SSER 21,Allegation 99. (1 page(s), 1/26/1984)
- ML20210E866 - Revised Procedure ESD-268, "Field Procedure for Deficient Condition Notices." (21 page(s), 5/27/1981)
- ML20210E884 - Rev 1 to Procedure SP-504, "Fabrication - BISCO Flexible Boot." (7 page(s), 9/14/1983)
- ML20210E639 - Discusses 831107 telcon from H Myers of subcommittee on Energy & Environ re plant deficiencies.Nine areas of inquiry listed.Summary of special insp-related info encl. (4 page(s), 11/7/1983)
- ML20210E661 - Summary of 840424 meeting w/R Kranzdorf,M McGee,D Jeter & J Carsel in San Luis Obispo,CA re roles of federal,state & local agencies in development of emergency plans.Allegation Task 80 closed.Supporting documentation encl. (4 page(s), 8/22/1984)
- ML16341D665 - Rev 1 to "Chemistry & Radiation Protection Technician Training." (34 page(s), 8/25/1983)
- ML20210E755 - "Installation of BISCO Penetration Sleeve Extension Utilizing BISCOSEAL (Pourable or Trowelable)." (16 page(s), 3/6/1984)
- ML20210E892 - Submits requested info re Bostnum-Bengen Metal Products supplied to Units 1 & 2.Record of 840110 telcon w/S Numamaker. (6 page(s), 12/8/1983)
- ML20210E757 - Forwards util response to Allegations 25,58 & 96 described in SSER 21 re expansion anchors.Util responses re HP Foley procedure for installation of anchor bolts will be submitted next wk. (19 page(s), 1/27/1984)
- ML20210E747 - Provides minor revs & addl info for special rept on plant tube steel verification.Figures re tangential & radial gauging methods & supporting documentation encl. (48 page(s), 6/7/1984)
- ML20210E912 - Forwards interim rept of Bostrom-Bergen/Meddco Metal matls sampling program,per SSER 21-Allegation 99.Rept provides status of util investigation & sampling program results to date re allegations by former employees. (20 page(s), 2/29/1984)
- ML20210E647 - Forwards util response to SSER Item 57 re NRC questions about qualification & certification of HP Foley Co QC inspectors.Info re qualification of Pullman Power Products QC inspectors will be provided in near future. (5 page(s), 2/17/1984)
- ML20210E584 - Summarizes requirements for training of power reactor health physics personnel to be incorporated into radiation protection plan or reg guide in response to 800710 memo. Draft order modifying License DPR-16 encl. (11 page(s), 7/29/1980)
- ML20210E933 - Forwards info re testing of Carboline protective coatings used in containment bldgs,in response to NRC 831205 request at meeting concerning QC program for painting (SSER 21,Allegation 100). (2 page(s), 1/24/1984)
- ML20210E791 - Confirms conversations w/RF Fraley re allegations concerning inadequate planning & routing of cables within plant, improper clearing of cable ways before pulling cables & potential damage to RHR pumps.Supporting documentation encl. (175 page(s), 1/23/1984)
- ML20210E616 - Forwards Rept PAR(DCNP)-NDE-2 & project quality plan re technical assistance in support of NDE work at plant.Table of field welds chosen for radiograph & reader sheet review also encl. (9 page(s), 11/23/1983)
- ML20210E847 - Rev 3 to Procedure SP-805-1, "Installation of BISCO Penetration Sleeve Extension Utilizing BISCOSEAL (Pourable or Trowelable)." Supporting documentation encl. (22 page(s), 12/20/1982)