Home > NRC Library > ADAMS Public Documents
Web Package for FOIA/PA 2013-0139
Accession Number: ML14085A086
Date Released: Tuesday, April 1, 2014
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML14013A147 - FOIA/PA-2013-0139 - Resp 3 - Final. (1 page(s), 1/10/2014)
- ML13050A059 - FOIA/PA-2013-0139 - Information pertaining to reactor pressure vessels in mentioned plants (5 page(s), 2/18/2013)
- ML122990315 - Vermont Yankee Nuclear Power Station - 8/22/12 E-mail from J. Devincentis to R. Guzman re: Draft Steam Dryer RAI Response. (1 page(s), 8/22/2012)
- ML12128A426 - North Anna Power Station, Unit 1, Relief Request N1-14-NDE-007, Approval to Extend the Fourth Interval First Period for Reactor Vessel Interior VT-3 Visual Examination (B-N-1). (8 page(s), 4/26/2012)
- ML12284A478 - Vermont Yankee, Technical Specifications Proposed Change 296, Supplement 1, Response to Request for Additional Information. (14 page(s), 10/3/2012)
- ML12222A340 - Surry, Units 1 and 2, Proposed Technical Specifications to Adopt TSTF-510, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection," Using the Consolidated Line Item Improvement Process. (35 page(s), 7/31/2012)
- ML12122A885 - IR 05000327-12-002, 05000328-12-002, on 1/1/2012 - 3/31/2012 Sequoyah Nuclear Plant, Units 1 & 2, Adverse Weather Protection, Fire Protection, Flood Protection Measures, Evaluation of Changes, Tests, or Experiments, & Permanent Plant Modifications,..... (54 page(s), 4/30/2012)
- ML12089A274 - Mtg Ann -Surry Regulatory Conference - 2012. (6 page(s), 3/29/2012)
- ML12220A536 - IR 05000391-12-605, on 06/30/2012, Watts Bar Nuclear Plant, Unit 2 Construction - NRC Integrated Inspection. (44 page(s), 8/7/2012)
- ML122990318 - Vermont Yankee Nuclear Power Station - 9/17/12 E-mail from P. Couture to R. Guzman re: Steam Dryer Call and Draft Steam Dryer RAI Response. (1 page(s), 9/17/2012)
- ML12056A050 - Enclosure 4 - Recommendation 2.3: Flooding. (9 page(s), 3/12/2012)
- ML12283A306 - Surry Nuclear Plant, Unit 2 - Notification of Inspection and Request for Information. (12 page(s), 10/4/2012)
- ML12034A202 - IR 05000391-11-610, on 12/31/2011, Watts Bar Nuclear Plant, Unit 2, Construction-NRC Integrated Inspection. (40 page(s), 2/3/2012)
- ML083090046 - Watts Bar, Unit 2, Preservice Inspection Program Plan and Request for Relief No. WBN-2/PDI-4. (77 page(s), 10/30/2008)
- ML12167A212 - IR 05000391-12-604, on 04/01/2012 - 05/19/2012, Watts Bar Nuclear Plant, Unit 2, Construction - NRC Integrated Inspection Report. (44 page(s), 6/14/2012)
- ML120050183 - Watts Bar Nuclear Plant, Unit 2 - Request for Relief Regarding Use of American Society of Mechanical Engineers Boiler & Pressure Vessel Code Cases N-801 & N-802 (TAC No. ME7063). (10 page(s), 1/19/2012)
- ML110800483 - IR 05000391-11-602, on 01/01 - 02/19/2011, Watts Bar, Unit 2 Construction. (57 page(s), 3/18/2011)
- ML121910339 - Kewaunee, Millstone, Units 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, 2011 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46. (29 page(s), 6/28/2012)
- ML082560373 - Watts Bar Nuclear Plant, Unit 2 - Request For Relief Regarding Alternative Rules For Renewal of Active or Expired N-Type Certificates (TAC MD8314). (8 page(s), 10/2/2008)
- ML12087A350 - Surrey Power Station, Units 1 and 2 - Safety Evaluation Regarding License Amendment Request - Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC Nos. ME6803 and ME6804). (26 page(s), 3/27/2012)
- ML110410680 - IR 05000391-10-605, on 10/01/10 - 12/31/10, Tennessee Valley Authority. (107 page(s), 2/9/2011)
- ML120730304 - Surry Power Station, Unit Nos. 1 and 2 - Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC NOS. ME6803 and ME6804). (31 page(s), 4/17/2012)
- ML12172A001 - Comparison of Non-Destructive and Destructive Examination Findings for a Leak Path Assessment of a Pressurized Water Reactor Control Rod Drive Nozzle. (17 page(s), 7/19/2012)
- ML12109A270 - Surry Power Station, Unit Nos. 1 and 2 - Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC Nos. ME6803 and ME6804). (39 page(s), 4/17/2012)
- ML102170465 - IR 05000391-10-603; 04/01/2010 - 06/30/2010; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection Report. (82 page(s), 8/5/2010)
- ML11279A218 - Memo - Task Interface Agreement - Evaluation Of Compliance With Code For Examination Of Flange Stud Holes On The Replacement Vessel Head At The Davis-Besse Nuclear Power Station (TIA 2011-015). (5 page(s), 10/6/2011)
- ML12046A849 - Surry Power Station, Unit 1, Review of the Steam Generator Tube Inservice Inspection Report for the Refueling Outage in 2010 (TAC No. ME6375). (4 page(s), 2/27/2012)
- ML12241A160 - NUREG/CR-7142 " Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation." (137 page(s), 8/31/2012)
- ML12056A044 - Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - To All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status. (36 page(s), 3/12/2012)
- ML121520304 - Vermont Yankee - E-mail from R.Guzman to J. Devincentis - Request for Additional Information re: License Amendment to Revise OL Condition 3.S Regarding Steam Dryer Inspections (TAC No. ME7733). (2 page(s), 5/31/2012)
- ML12207A062 - North Anna Power Station, Units 1 and 2 - Relief Request N1-14-NDE-007 to Extend the fourth 10-Year first Period for the Reactor Vessel Interior VT-3 Visual Examination (TAC NO. ME8493). (8 page(s), 7/27/2012)
- ML12187A165 - Surry Power Station, Unit 2 - Response to Request for Additional Information 2011 Steam Generator Inservice Inspection Report. (7 page(s), 6/22/2012)
- ML121350004 - Comparison of an Ultrasonic Phased Array Evaluation with Destructive Analysis of a Documented Leak Path in a Nozzle Removed from Service. (10 page(s), 5/14/2012)
- ML13218B265 - FOIA/PA-2013-0139 - Resp 1 - Partial. (43 page(s), 6/14/2013)
- ML090291033 - IR 05000391-08-001, on 10/01/2008 - 12/31/2008; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2, Integrated Inspection Report. (30 page(s), 1/29/2009)
- ML12076A158 - Surry 2012 Request for Information Letter Rev. 1. (11 page(s), 3/14/2012)
- ML12131A564 - IR 05000280-12-002, 05000281-12-002, on 03/31/2012, Surry Power Station, Units 1 and 2; Identification and Resolution of Problems. (29 page(s), 5/10/2012)
- ML120370286 - Fermi 2 - Evaluation of Applicable Ten Year Interval Inservice Inspection Relief Request - Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements. (11 page(s), 2/17/2012)
- ML12242A347 - Surry, Unit 1, Inservice Inspection Owner's Activity Report (OAR). (11 page(s), 8/16/2012)
- ML12054A679 - Issuance of Order to Modify Licenses With Regard to Reliable Spent Fuel Pool Instrumentation. (40 page(s), 3/12/2012)
- ML12102A235 - Surry Nuclear Power Station Unit 1 - Notification of Inspection and Request for Information. (12 page(s), 4/11/2012)
- ML120330272 - NRC Information Notice 2012-11: Age Related Capacitor Degradation. (5 page(s), 7/23/2012)
- ML120800002 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism Nozzle Interference Fit and Weld Region - NDE Results and Destructive Analysis. (14 page(s), 3/20/2012)
- ML12053A340 - Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights From the Fukushima Dai-Ichi Accident. (81 page(s), 3/12/2012)
- ML12279A308 - IR 05000280-12-011 & 05000281-12-011; Virginia Electric and Power Company; 07/30/2012 - 08/03/2012; Surry Power Station, NRC Triennial Fire Protection Inspection Report. (31 page(s), 10/4/2012)
- ML12213A543 - IR 05000280-12-003 & 05000281-12-003; Virginia Electric and Power Company; 04/01/2012 - 06/30/2012; Surry Power Station, NRC Integrated Inspection Report. (39 page(s), 7/31/2012)
- ML12216A259 - IR 05000327-12-003 & 05000328-12-003; Tennessee Valley Authority; 04/01/2012 - 06/30/2012; Sequoyah Nuclear Plant, Unit 1 and 2, Integrated Inspection Report 2012003. (29 page(s), 8/1/2012)
- ML12048A676 - Surry Power Station, Units 1 & 2 - Response to Request for Additional Information Related to License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair. (73 page(s), 2/14/2012)
- ML112201418 - IR 05000391-11-605, on 07/02/11, Watts Bar Nuclear Plant, Unit 2. (68 page(s), 8/5/2011)
- ML12118A471 - Dominion's Answer Opposing Requests for Heariing. (10 page(s), 4/27/2012)
- ML083050404 - IR 05000391-08-009, on 07/01 -09/30/2008, Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated. (26 page(s), 10/30/2008)
- ML120260681 - NUREG/CR-7110 Vol 2 "State-of-the-Art Reactor Consequence Analyses Project: Surry Integrated Analysis". (559 page(s), 1/31/2012)
- ML13219A037 - Email from J. Poehler to C. Basavaraju, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/15/2012)
- ML13220A259 - Email from T. Scarbrough to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (3 page(s), 4/6/2012)
- ML13219A048 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism (CRDM) Nozzle interference fit and weld region - NDE Results and Destructive Analysis. (7 page(s), 3/19/2012)
- ML13218B258 - Draft Memo from M. Mitchell, NRR to R. Pascarelli, NRR on Request for Additional Information Related to Request for Relief for Fermi, Unit 2 Reactor Vessel Internal Components. (4 page(s), 6/14/2013)
- ML13218B241 - Allowable Pressure for Benson Transient Number 1 Calculated per ASME Code Versus Actual P(t). (4 page(s), 6/14/2013)
- ML13219A032 - Email from J. Poehler to C. Basavaraju, FW: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13218B250 - Email from J. Poehler to G. Cheruvenki, RE: Core Plate Components - Fermi. (1 page(s), 1/9/2012)
- ML12020A234 - North Anna Unit 1, Order - EA 03-009 Sixty-Day Report Reactor Pressure Vessel (RPV) Head Inspection Results. (6 page(s), 1/12/2012)
- ML13218B257 - Email from R. Lewis to R. Monk, RE: I forgot and Left the SR You Handed me on your Desk, If You can Send Me the #. Also... (1 page(s), 2/7/2012)
- ML13218B253 - Email from R. Haag to T. Nazario, RE: Mockup for RPV Stud Hole Sleeving. (1 page(s), 1/26/2012)
- ML13220A263 - Email from G. Oberson to J. Collins, Subject: nozzle 63 meeting. (1 page(s), 4/11/2012)
- ML13219A050 - Email from J. Poehler to A. Hiser, et al, RE: MRP-227 - Plant Submittals. (1 page(s), 3/20/2012)
- ML13220A256 - Email from J. Poehler to S. Rosenberg, RE: Accomplishments for March. (1 page(s), 4/4/2012)
- ML13219A047 - Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis. (17 page(s), 3/15/2012)
- ML13219A034 - Email from J. Poehler to P Purtscher, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13219A038 - Email from J. Poehler to P. Purtscher, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/15/2012)
- ML13219A049 - Email from J. Poehler to G. Cheruvenki, RE: MRP-227 - Plant Submittals. (1 page(s), 3/20/2012)
- ML13218B259 - Draft - Thermo-Mechanical Analysis of Pressure Vessels. (9 page(s), 6/14/2013)
- ML13220A260 - Email from R. Guzman to W. Jessup, RE: VY Steam Dryer Inspection Reports. (5 page(s), 4/11/2012)
- ML13219A043 - Email from T. Scarbrough to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (2 page(s), 2/28/2012)
- ML13218B262 - Quality Assurance of Chapter 10: Requirements for Nozzles. (3 page(s), 6/14/2013)
- ML13218B254 - Email from G. Cheruvenki to A. Hon, et al., FW: Acceptance Review - Vermont Yankee steam dryer inspections. (1 page(s), 2/1/2012)
- ML13218B239 - Flowchart for Creating PWR Cooldown P-T Curves. (12 page(s), 6/14/2013)
- ML13218B255 - Email from T. Scarbrough, NRO to J. Kim, NRR et al. RE: Acceptance Review - Vermont Yankee steam dryer inspections. (2 page(s), 2/7/2012)
- ML13219A041 - Email from G. Cheruvenki to J. Kim, RE: Inspections - Steam dryer - Todays Meeting at 1:00 P.M. (2 page(s), 2/23/2012)
- ML13220A261 - Email from B. Hanson to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (1 page(s), 4/11/2012)
- ML13219A051 - Email from T. Nazario to J. Seat, RE: Report Inputs. (1 page(s), 4/3/2012)
- ML13218B247 - Email from B. Hanson to G. Oberson, Subject: N6783 Work. (2 page(s), 1/3/2012)
- ML13220A258 - Email from J. Kim to G. Cheruvenki, et al, RE: VY Steam Dryer Inspection Reports. (3 page(s), 4/5/2012)
- ML13218B252 - Email from S. Freeman to D. Failla, FW: Meeting With Westinghouse/PCI to Discuss Site Activities. (2 page(s), 1/14/2012)
- ML13220A262 - Email from S. Crawford to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (2 page(s), 4/11/2012)
- ML13218B261 - Quality Assurance of Chapter 9: Definition of the Beltline. (11 page(s), 6/14/2013)
- ML12228A723 - Catawba Nuclear Station, Units 1 and 2 - Proposed Relief Request 11-CN-001 for the Third Ten-Year Inservice Inspection Interval (TAC Nos. ME7277-ME7283). (31 page(s), 8/20/2012)
- ML13218B263 - Quality Assurance of Chapter 11: Requirements on Upper Shelf Energy. (15 page(s), 6/14/2013)
- ML13219A044 - Email from T. Nazario to R. Haag, et al, FW: RV Stud Hole Remediation Demonstration - Lake Bluff, IL (2 page(s), 3/5/2012)
- ML13219A046 - Memo from M. Case to P. Hiland, Subject: Review of Draft NUREG/CR-XXXX Entitled, "Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation." (117 page(s), 3/13/2012)
- ML13219A035 - Email from J. Poehler to G. Cheruvenki, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13219A042 - Email from G. Cheruvenki to J. Kim, RE: Inspections Steam Dryer - Todays meeting at 1:00 P.M. (1 page(s), 2/24/2012)
- ML13219A045 - Presentation: SPIE Smart Structures/NDE 2012 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism (CRDM) Nozzle Interference Fit and Weld Region NDE Results and Destructive Analysis. (29 page(s), 3/7/2012)
- ML13218B248 - Email from B. Hanson to G. Oberson, Subject: RE: MRP Abstract. (1 page(s), 1/4/2012)
- ML13218B260 - History of P-T Limits for Heatup, Cooldown, and Leak Test. (5 page(s), 6/14/2013)
- ML13218B245 - Email from G. Oberson to J. Collins, Subject: Leak Path Assessment Work. (1 page(s), 1/3/2012)
- ML13218B243 - Originator: G. Stevens, Objectives List. (2 page(s), 6/14/2013)
- ML13220A255 - Email from J. Kim to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (2 page(s), 4/4/2012)
- ML13219A036 - Regulatory Evaluation. (9 page(s), 2/15/2012)
- ML13219A031 - NUREG/CR-XXXX PNNL-XXXXX Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation. (126 page(s), 2/8/2012)
- ML13218B256 - Draft Regulatory Evaluation. (9 page(s), 2/7/2012)
- ML13219A033 - Email from J. Poehler to G. Cheruvenki, FW: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (1 page(s), 2/14/2012)
- ML12108A026 - Quad Cities, Unit 2, Response to Request for Additional Information Regarding Relief Request 14R-19 and Additional Followup Question on the Flaw Evaluation. (39 page(s), 4/14/2012)
- ML13219A039 - Email from J. Poehler to C. Basavaraju, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/22/2012)
- ML13220B109 - Email from R. Guzman to G. Cheruvenki, RE: Inspections - Steam Dryer - Todays meeting at 1:00 pm. (19 page(s), 5/30/2012)
- ML13221A046 - Email from G. Oberson to J. Collins, Subject: Nozzle 63 NUREG/CR. (1 page(s), 6/20/2012)
- ML13220A265 - Email from J. Collins to R. Swain, Subject: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (1 page(s), 4/11/2012)
- ML13220A267 - Email from A. Cinson to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (1 page(s), 4/16/2012)
- ML13221A034 - Email from A. Cinson to G. Oberson et al., Subject: RE: following up on NUREG comments. (1 page(s), 6/5/2012)
- ML13221A041 - Email from B. Hanson to G. Oberson, Subject: RE: CRDM NUREG/CR. (2 page(s), 6/19/2012)
- ML13220B097 - Email from M. Benson to Bud Brust, RE: North Anna WRS Analysis with Discussion. (1 page(s), 8/7/2012)
- ML13220B105 - Email from S. Crawford to G. Oberson, Subject: RE: status of NUREG/CR. (2 page(s), 5/14/2012)
- ML13225A042 - Email from B. Hanson to B. Hanson & G. Oberson, Subject: RE: Project 59038/N6783 due to Expire 7/31/12. (2 page(s), 7/20/2012)
- ML13221A055 - Email from B. Hanson to G. Oberson, Subject: FW: CRDM NUREG. (1 page(s), 7/16/2012)
- ML13221A052 - Email from B. Hanson to G. Oberson, Subject: RE: Vacuum Drying. (1 page(s), 7/6/2012)
- ML13221A031 - Email from S. Crawford to G. Oberson et al., Subject: RE: following up on NUREG comments. (2 page(s), 5/31/2012)
- ML13220B104 - Email from S. Crawford to G. Oberson, Subject: RE: Status of NUREG/CR. (1 page(s), 5/14/2012)
- ML13220B099 - Email from G. Oberson to J. Collins, Subject: nozzle 63 Draft NUREG. (1 page(s), 5/9/2012)
- ML13220A272 - Email from M. Benson to H. Rathbun, RE: Just let me know if I can help with N Anna stuff. (1 page(s), 4/19/2012)
- ML13221A032 - Email from S. Crawford to G. Oberson et al., Subject: RE: following up on NUREG comments. (4 page(s), 5/31/2012)
- ML13221A047 - Email from J. Poehler to J. Medoff, et al, FW: Background - Kewaunee RAI-MRP-227-A. (3 page(s), 6/25/2012)
- ML13221A057 - Email from B. Hanson to G. Oberson, Subject: FW: Project 59038/N6783 Due to Expire 7/31/12. (2 page(s), 7/17/2012)
- ML13220B106 - Email from B. Hanson to G. Oberson, Subject: RE: status of NUREG/CR. (1 page(s), 5/14/2012)
- ML13221A050 - Email from G. Oberson to J. Collins, Subject: NUREG/CR-7142. (1 page(s), 6/29/2012)
- ML13220A264 - Email from S. Crawford to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (2 page(s), 4/11/2012)
- ML13221A037 - Email from G. Oberson to B. Hanson, Subject: SNF Issues. (1 page(s), 6/14/2012)
- ML13220A271 - Email from M. Benson to D. Alley, RE: North Anna Event Info. (1 page(s), 4/18/2012)
- ML13221A039 - Email from S. Crawford to G. Oberson, Subject: RE: Nozzle 63 Presentation for EPRI Materials Reliability Meeting. (1 page(s), 6/18/2012)
- ML13221A053 - Email from G. Oberson to J. Collins, Subject: Nozzle 63 Journal Article. (1 page(s), 7/13/2012)
- ML13221A038 - Email from S. Crawford to G. Oberson, Subject: RE: Nozzle 63 Presentation for EPRI Materials Reliability Meeting. (2 page(s), 6/18/2012)
- ML13220A273 - Email from J. Poehler to V. Sreenivas, RE: Missed Exam. (3 page(s), 4/27/2012)
- ML13220A274 - Comparison of an Ultrasonic Phased Array Evaluation with Destructive Analysis of a Documented Leak Path in a Nozzle Removed from Service. (9 page(s), 4/30/2012)
- ML13220A270 - Email from M. Benson to G. Stevens, RE: Draft J-R data scumming letter. (2 page(s), 4/17/2012)
- ML13220A266 - Email from J. Collins to R. Swain, Subject: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (1 page(s), 4/12/2012)
- ML13221A033 - Email from M. Benson to A. Csontos, RE: RG 1.161 "Analysis of Existing JR Correlations for Regulatory Guide 1.161 Update. (3 page(s), 6/4/2012)
- ML13221A048 - Meeting Scheduler, Subject: NRC Meeting to Discuss Reactor Vessel and Steam Generator Questions. (1 page(s), 6/26/2012)
- ML13220B102 - Email from J. Collins to M. Gavrilas, Subject: FW: Closeout of Y020120062 - NRR Review of Draft NUREG/CR-XXXX, Entitled, Ultrasonic Phased Array Assessment of the Interface Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle. (2 page(s), 5/11/2012)
- ML13221A054 - Email from A. Cinson to G. Oberson, Subject: RE: Journal Article, Nozzle 63. (2 page(s), 7/16/2012)
- ML13220B108 - Email from S. Crawford to G. Oberson et al., Subject: RE: following up on NUREG Comments. (1 page(s), 5/30/2012)
- ML13220B107 - Email from G. Oberson to B. Hanson, Subject: RE: status of NUREG/CR. (1 page(s), 5/15/2012)
- ML13221A056 - Email from G. Oberson to B. Hanson, Subject: RE: CRDM NUREG. (1 page(s), 7/16/2012)
- ML13220B103 - Email from A. Cinson re Discussions on Nozzle 63 work. (1 page(s), 5/11/2012)
- ML13221A058 - Email from J. Baptist to T. Nazario, RE: Please Send me the List of Items to be Closed/Discussed in IR 2011605. Need it by Wed. Since we Exit on Thurs. Thanks. (2 page(s), 7/17/2012)
- ML13221A040 - Email from S. Crawford to G. Oberson, Subject: CRDM NUREG/CR. (1 page(s), 6/19/2012)
- ML13220B100 - Email from M. Benson to G. Stevens, RE: Realistic Transient Slides. (1 page(s), 5/11/2012)
- ML13220A269 - Email from M. Benson to M. Kirk, RE: Draft J-R data scumming letter. (1 page(s), 4/17/2012)
- ML13221A030 - Email from A. Cinson to G. Oberson et al., Subject: RE: following up on NUREG Comments. (2 page(s), 5/31/2013)
- ML13221A049 - Email from J. Poehler to N. Salgado, et al, RE: SE by NRR, Fourth 10 Year Internal Inservice Inspection for North Anna. (6 page(s), 6/27/2012)
- ML13221A051 - Email from G. Oberson to B. Hanson, Subject: Vacuum Drying. (1 page(s), 7/5/2012)
- ML13221A036 - E-mail form M. Benson to P. Purtscher, RE: 6-6-12 Draft MRP Update to RG1-161. (1 page(s), 6/6/2012)
- ML13221A059 - Presentation: (2012 EPRI Materials Reliability Conference and Exhibit) by M. Benson et al., NRC Office of Research, Subject: Thermomechanical Analysis of Pressure Vessels. (12 page(s), 11/14/2012)
- ML13220A268 - Email from G. Oberson to J. Collins, Subject: RE: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (2 page(s), 4/16/2012)
- ML13220B098 - Email from M. Benson to Bud Brust, RE: North Anna WRS Analysis with Discussion. (1 page(s), 5/7/2012)
- ML13225A043 - Email P. Briegleb to C. Sebastien et al., Subj: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (3 page(s), 7/25/2012)
- ML13225A142 - Email G. Shear to M. Ring, FW: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (1 page(s), 8/14/2012)
- ML13225A161 - Email from A. Csontos to S. Richards, RE: Research Assistance Request. (2 page(s), 9/5/2012)
- ML13225A057 - Email J. Poehler to R. Hardies, RE: Action: Followup of List of NPPs with RPVs Forged by Rotterdam Dockyards (RDM). (4 page(s), 8/13/2012)
- ML13225A279 - Email S. Lingam to S. Meighan, RE: RPV Material Issue. (2 page(s), 8/13/2012)
- ML13225A046 - Email M. Kirk to M. Case, FW: URGENT Message on Nuclear Safety: Flaw indications in Doel 3 Reactor Pressure Vessel. (8 page(s), 8/3/2012)
- ML13225A062 - Email C. Fairbanks to R. Hardies, RE: Rotterdam Plants. (1 page(s), 8/13/2012)
- ML13225A157 - Email from C. Fairbanks to M. Kirk, Comments - RE: RESEND: draft slides for 8/28 public meeting. (7 page(s), 8/27/2012)
- ML13225A148 - Email P. Hiland to T. Lupold, Subj: Doel 3 followup. (1 page(s), 8/16/2012)
- ML13225A147 - Email D. Hills to T. Lupold, RE: Doel 3 (Belgium) - Flaw Indications in the Reactor Pressure Vessel. (4 page(s), 8/16/2012)
- ML13225A146 - Email J. Poehler to C. Roque-Cruz, RE: Pressure Vessel Inspections. (3 page(s), 8/16/2012)
- ML13225A163 - Email from A. Csontos to C. Brown, RE: Large NSSS Component Fabrication and Inspection. (2 page(s), 9/11/2012)
- ML13225A150 - Email J. Hopkins to J. Poehler, RE: QUESTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (5 page(s), 8/16/2012)
- ML13225A323 - Email from G. Cheruvenki to R. Guzman, RE: VY steam dryer. (1 page(s), 9/12/2012)
- ML13225A053 - Email from D. Hills to S. Rosenberg, et al, FW: DOEL 3 (Belgium) Flaw Indications in the Reactor Pressure Vessel. (3 page(s), 8/13/2012)
- ML13225A141 - Q & A for Chairman Macfarlane on Cracks Found in Belgian Nuclear Plant Reactor Vessel for the August 14, 2012, National Press Club Media Roundtable. (1 page(s), 8/13/2012)
- ML13225A064 - Email J. Poole to R. Guzman, RE: Action: Followup of List of NPPs with RPVs forged by Rotterdam Dockyards. (3 page(s), 8/13/2012)
- ML13225A144 - Email J. Hopkins to J. Poehler, Subj: QUESTION; Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (4 page(s), 8/15/2012)
- ML13225A059 - Email J. Poehler to C. Fairbanks, Doel 3 issue - List of Plants with Forgings Manufactured by Rotterdam. (2 page(s), 8/13/2012)
- ML13225A153 - Email D. Hills to V. Meghani, FW: Doel 3 (Belgium) - Flaw Indications in the Reactor Pressure Vessel. (4 page(s), 8/21/2012)
- ML13225A160 - Email from A. Csontos to J. Dion, RE: Research Assistance Request. (2 page(s), 9/5/2012)
- ML13225A048 - Email from J. Poehler to D. Widrevitz, et al. RE: Answers to questioner 3/8/2012. (1 page(s), 8/6/2012)
- ML13225A050 - Email G. Shear to M. Ring, FW: REQUEST: Belgium - Meeting on 8/16 re Flaw Indications in Doel 3 Reactor Pressure Vessel. (5 page(s), 8/10/2012)
- ML13225A158 - Email from S. Crawford to G. Oberson, Subject: RE: publication of nozzle 63 NUREG/CR. (1 page(s), 9/5/2012)
- ML13225A045 - Email C. Roquecruz to J. Poehler, FW: REQUEST: Belgium - Meeting on 8/16 re Flaw indications in Doel 3 Reactor Pressure Vessel. (3 page(s), 8/3/2012)
- ML13225A152 - Email from M. Benson to M. Kirk, RE: what is the unit "nvt", relative to neutron exposure? (1 page(s), 8/17/2012)
- ML13225A165 - Email A. Csontos to M. Case, RE: Large NSSS Component Fabrication and Inspection. (2 page(s), 9/12/2012)
- ML13225A154 - Email from M. Benson to M. Kirk, Subject: Throwing a Dart at FAVOR. (1 page(s), 8/23/2012)
- ML13225A324 - Email from A. Csontos to M. Case, FW: Briefing. (1 page(s), 9/13/2012)
- ML13225A063 - Email S. Meighan to J. Thompson et al., Action: Followup of List of NPPs with RPVs Forged by Rotterdam Dockyards (RDM). (2 page(s), 8/13/2012)
- ML13225A155 - Email from M. Benson to M. Kirk, RE: Throwing a Dart at FAVOR. (1 page(s), 8/27/2012)
- ML13225A044 - Email from M. Benson to M. Kirk, RE: RG 1.161 PVP Paper. (1 page(s), 7/30/2012)
- ML13225A055 - Email R. Guzman to J. Quichocho, RE: Request: Belgium - Meeting on 8/16 re Flaw Indications in Doel 3 Reactor Pressure Vessel. (7 page(s), 8/13/2012)
- ML13225A065 - Email J. Poole to S. Meighan, RE: Action: Followup of List of NPPs with RPVs forged by Rotterdam Dockyards. (3 page(s), 8/13/2012)
- ML13225A054 - Email J. Lara to C. Casto, FW: Doel 3 (Belgium) - Flaw Indications in the Reactor Pressure Vessel. (4 page(s), 8/13/2012)
- ML13225A149 - Email J. Poehler to J. Hopkins, RE: QUESTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (5 page(s), 8/16/2012)
- ML13225A162 - Email from D. Garmon to J. Poehler, RE: Research on Hydrogen Cracking in Reactor Vessels Related to Doel 3. (1 page(s), 9/7/2012)
- ML13225A143 - Email S. Rosenberg to P. Hiland, RE: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (3 page(s), 8/15/2012)
- ML13225A049 - Email J. Collins to T. Lupold, FW: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (5 page(s), 8/7/2012)
- ML13225A047 - Email J. Collins to T. Lupold, FW: Urgent Message on Nuclear Safety: Flaw indications in Doel 3 Reactor Pressure Vessel. (10 page(s), 8/3/2012)
- ML13225A051 - FANC Info Sheet on the Reactor and the Reactor Vessel. (7 page(s), 8/10/2012)
- ML13225A058 - Email R. Hardies to J. Poehler, FW: Action: Followup of List of NPPs with RPVs Forged by Rotterdam Dockyards. (4 page(s), 8/13/2012)
- ML13225A151 - Email from M. Benson to M. Kirk, RE: What is the unit "nvt", relative to neutron exposure? (1 page(s), 8/17/2012)
- ML13225A056 - Email J. Tsao to T. Lupold, Subj: Notes from the Branch Chief Meeting on 8/13/2012. (1 page(s), 8/13/2012)
- ML13225A061 - Email C. Fairbanks to J. Poehler, Watts Bar 2 Did Have a (joint) GL 92-01 Response. (2 page(s), 8/13/2012)
- ML13225A159 - Email from J. Collins to M. Thadani & Justin Poole, Subject: NUREG CR-7142 on Volumetric Leak Path Assessment. (1 page(s), 9/5/2012)
- ML13225A164 - Email from A. Csontos to S. West, RE: RES Response to NRR Research Assistance Request on Doel 3 Reactor. (1 page(s), 9/11/2012)
- ML13225A052 - Email S. Malik to RESDECIB, Regulators to Discuss DOEL-3 Belgian Reactor Pressure Vessel Cracks. (3 page(s), 8/12/2012)
- ML13225A145 - Email C. Roque-Cruz to J. Poehler, RE: Pressure Vessel Inspections. (3 page(s), 8/16/2012)
- ML13225A156 - Email from A. Cinson to G. Oberson, Subject: RE: publication of nozzle 63 NUREG/CR. (1 page(s), 8/27/2012)
- ML13225A060 - Email C. Fairbanks to J. Poehler, RE: ACTION: Followup of List of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (5 page(s), 8/13/2012)
- ML13225A339 - Email from J. Poehler to G. Stevens, RE: Metallurgy of Hydrogen Flaking Document - for DOEL 3 Meeting. (3 page(s), 9/27/2012)
- ML13226A431 - Email A. Cinson to G. Oberson, re: Follow Up on Draft NUREG and Contract Status. (4 page(s), 2/15/2012)
- ML13226A182 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 2/29/2012)
- ML13225A343 - Email from R. Guzman to G. Cheruvenki, RE:VY Steam Dryer Cracking. (1 page(s), 10/3/2012)
- ML13226A181 - Email B. Hanson to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 1/31/2012)
- ML13226A176 - Email J. Poehler to J. Kim, re: Draft Follow-Up RAI for Core Plate Bolt Analysis. (1 page(s), 1/11/2012)
- ML13225A329 - Email from G. Cheruvenki to R. Guzman on Environmental Evaluation for VY Steam Dryer Amendment. (1 page(s), 9/14/2012)
- ML13226A173 - Doel Debrief. (1 page(s), 6/14/2013)
- ML13226A183 - Email B. Hanson to G. Oberson, re: Follow Up on Draft NUREG and Contract Status. (3 page(s), 2/13/2012)
- ML13226A160 - Email from R. Guzman to T. Setzer, RE: Newspaper Opinion Article. (2 page(s), 10/4/2012)
- ML13226A159 - Email from S. Rutenkroger to R. Bellamy, FW: Newspaper Opinion. (1 page(s), 10/4/2012)
- ML13225A337 - Email from J. Poehler to R. McIntyre, RE: Japan Steel Works Info Related to Forging Practices. (2 page(s), 9/26/2012)
- ML13225A334 - Email from M. Kirk to R. Hardies, Et al, on Hydrogen Flake Papers. (1 page(s), 9/20/2012)
- ML13226A174 - Metallurgical Aspects Influencing the Potential for Hydrogen Flaking in Forgings for Reactor Pressure Vessels. (26 page(s), 6/14/2013)
- ML13226A164 - E-mail from R. Hardies to C. Fairbanks, FW: EPRI Questions to Electrabel. (1 page(s), 10/10/2012)
- ML13226A169 - Email from M. Kirk to A. Csontos, re: Roles and Responsibilities. (3 page(s), 10/25/2012)
- ML13226A170 - Email from A. Csontos to M. Kirk, re: Roles and Responsibilities. (4 page(s), 10/26/2012)
- ML13226A177 - Email B. Hanson to G. Oberson et al., re: Draft NUREG. (1 page(s), 1/17/2012)
- ML13226A175 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 1/31/2012)
- ML13225A346 - Email from T. Burns to S. Rutenkroger, RE: Newspaper Opinion Article. (1 page(s), 10/4/2012)
- ML13225A330 - An Ultrasonic Leak Path Assessment of a Pressurized Water Reactor Control Rod Drive Mechanism Nozzle. (12 page(s), 9/17/2012)
- ML13226A162 - Email Van Wonterghem to listed web sites, RE: Doel 3 RPV Issue - Details on October 16th meeting - WG1: Non-Destructive Examination Techniques. (3 page(s), 10/9/2012)
- ML13225A340 - Email from A. Csontos to S. Richards, RE: Counterintelligence (CI) Travel Briefings and Debriefings. (3 page(s), 9/27/2012)
- ML13225A332 - Email from J. Poehler to E. Reichelt, RE: New Reactors Audits of Forging Producers. (1 page(s), 9/18/2012)
- ML13225A326 - Email from A. Csontos to J. Uhle, RE Request for Approval of Foreign Travel to attend DOEL Technical Work Groups. (3 page(s), 9/13/2012)
- ML13225A327 - S. Sheng, et al, RE VY Steam Dryer Cracks. (1 page(s), 9/13/2012)
- ML13226A158 - Email from T. Setzer to S. Rutenkroger, RE: Newspaper Opinion Article. (1 page(s), 10/4/2012)
- ML13226A172 - Presentation (Phoenix, AZ) by M. Benson - Subject: ASME Code Section XI Nonmandatory Appendix K Update. (4 page(s), 11/8/2012)
- ML13225A344 - Organizer: A. Csontos, Subject: ACRS Meeting on DOEL-3 Indications. (1 page(s), 10/4/2012)
- ML13225A338 - Email from A. Csontos to C. Brown, RE: Reducing the Susceptibility of Cracking in Alloy 690. (2 page(s), 9/26/2012)
- ML13226A171 - Originator: Gary Stevens, Subject: DOEL 3 Brief/Next Steps Meeting. (1 page(s), 11/1/2012)
- ML13225A333 - Email from A. Csontos to R. Hardies, Accepted: FW: Recap of DOEL 3. (1 page(s), 9/19/2012)
- ML13225A328 - Email M. Kirk to P. Labeau, RE: Doel 3 International Committee. (2 page(s), 9/13/2012)
- ML13226A430 - Email G. Oberson to B. Hanson, re: Follow Up on Draft NUREG and Contract Status. (3 page(s), 2/14/2012)
- ML13226A161 - Email from S. Rutenkroger from R. Bellamy, FW: Newspaper Opinion Article. (3 page(s), 10/5/2012)
- ML13225A345 - Email from N. Sheehan to H. Gray, et al, RE: Newspaper Opinion Article. (2 page(s), 10/4/2012)
- ML13225A341 - Email form G. Oberson to J. Collins, Subject: Journal Article on Nozzle 63 work. (1 page(s), 9/28/2012)
- ML13225A331 - Email from J. Poehler to E. Reichelt, et al, on New Reactors Audits of Forging Producers. (1 page(s), 9/17/2012)
- ML13225A335 - Article from Keene Sentinel. (1 page(s), 9/21/2012)
- ML13225A336 - Meeting Notice on Vermont Yankee LAR - Steam Dryer Review. (3 page(s), 9/24/2012)
- ML13226A179 - Email T. Nazario to R. Haag, Subj: Mockup for RPV Stud Hole Sleeving. (2 page(s), 1/26/2012)
- ML13225A347 - Email from H. Gray to R. Hardies, RE: Newspaper Opinion Article. (1 page(s), 10/4/2012)
- ML13225A342 - Email from A. Csontos to R. Hardies, Accepted: ACRS presentation on the DOEL3 Indications. (1 page(s), 10/2/2012)
- ML13226A163 - Email from A. Csontos to M. Kirk, RE: Task Request: Task DOEL 3. (3 page(s), 10/10/2012)
- ML13226A167 - Email from S. Freeman to S. Shaeffer, RE: laminations detected in Belgian reactor vessel. (3 page(s), 10/17/2012)
- ML13226A168 - Email from A. Csontos to G. Stevens, RE: DOEL 3 one pager update in September. (1 page(s), 10/25/2012)
- ML13226A180 - Email T. Nazario to D. Failla, FW: Mockup for RPV Stud Hole Sleeving. (2 page(s), 1/26/2012)
- ML13226A166 - Email from A. Csontos to T. Clark, RE: Westems Discussion. (2 page(s), 10/16/2012)
- ML13226A165 - Email from A. Csontos to S. Rosenberg, RE: RIC. (1 page(s), 10/11/2012)
- ML13225A325 - Email from A. Csontos to R. Hardies, FW Request for Approval of Foreign Travel to attend DOEL Technical Work Groups. (2 page(s), 9/13/2012)
- ML13226A509 - Email M. Kirk to R. Hardies, FW: Some Information. (4 page(s), 8/14/2012)
- ML13226A438 - Email M. Benson to G. Stevens et al. re: J-R Curve Data (Ferritic Material Focus). (3 page(s), 4/10/2012)
- ML13226A518 - Teleconference Call Memo. (2 page(s), 8/22/2012)
- ML13226A451 - Email A. Cinson to G. Oberson, re: Nozzle 63 Discussions. (2 page(s), 5/10/2012)
- ML13226A506 - Email J. Poehler to T. Lupold & P. Hiland, RE: Rapidly Moving Media Story. (4 page(s), 8/10/2012)
- ML13226A450 - Email A. Cinson to G. Oberson, re: Nozzle 63 Discussions. (2 page(s), 5/10/2012)
- ML13226A449 - Email A. Cinson to G. Oberson, Subj: Nozzle 63 Discussions. (1 page(s), 5/8/2012)
- ML13226A504 - Email J. Poehler to R. Hardies, RE: More Belgian-Related Info. (2 page(s), 8/10/2012)
- ML13226A448 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 5/31/2012)
- ML13226A453 - Email A. Cinson to G. Oberson, Subj: Anthony.cinson@pnnl.gov is Requesting Files From you. (1 page(s), 5/11/2012)
- ML13226A434 - Email R. Haag to T. Nazario, re: Mockup for RPV Stud Hole Sleeving. (2 page(s), 2/23/2012)
- ML13226A455 - Email A. Cinson to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 5/16/2012)
- ML13226A501 - Email R. Hardies to T. Lupold RE: REQUEST: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (4 page(s), 7/25/2012)
- ML13226A502 - Email R. Hardies to P. Hiland RE: INFO: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (4 page(s), 8/2/2012)
- ML13226A515 - Email R. Davis to S. Rosenberg, FW: RPV Stud Holes and ASME Code Questions. (3 page(s), 8/21/2012)
- ML13226A507 - Email Van Wonterghem to iean-luc.lachaumeDasn.fr et al., Subj: Technical Meeting "Indications in Doel 3 Reactor Pressure Vessel": August 16. (5 page(s), 8/13/2012)
- ML13226A435 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 3/31/2012)
- ML13226A454 - Email A. Cinson to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 5/11/2012)
- ML13226A440 - Email G. Oberson to J. Collins, re: Discussion of NA Nozzle. (3 page(s), 4/23/2012)
- ML13226A500 - Email S. Crawford to G. Oberson, RE: Review Journal Article. (1 page(s), 7/10/2012)
- ML13226A519 - Email J. Poehler to P. Hiland, RE: More Belgian-Related Info. (2 page(s), 8/10/2012)
- ML13226A510 - Email A. Hull to D. Alley, Subj: as Discussed Yesterday; Regulators to Discuss DOEL-3 Belgian Reactor Pressure Vessel Cracks. (3 page(s), 8/16/2012)
- ML13226A444 - Email A. Cinson to G. Oberson, re: CRDM-9th EPRI NDE Conference. (1 page(s), 4/26/2012)
- ML13226A505 - Email S. Burnell to J Poehler et al., RE: More Belgian-Related Info. (2 page(s), 8/10/2012)
- ML13226A436 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 4/30/2012)
- ML13226A508 - Email N. DiFrancesco to J. McGhee, Subj: Quad Cities 2. (3 page(s), 8/14/2012)
- ML13226A512 - Email M. Cheok to R. Hardies et al., FW: REQUEST: Belgium - Meeting on 8/16 re Flaw Indications in Doel 3 Reactor Pressure Vessel. (8 page(s), 8/16/2012)
- ML13226A514 - Email R. Hardies to P. Hiland FW: Doel 3 RPV Working Meeting August 16: Handouts & Start-up of Working Groups. (82 page(s), 8/17/2012)
- ML13226A433 - Email B. Hanson to G. Oberson, re: N6783 SOW Modifications. (2 page(s), 2/23/2012)
- ML13226A498 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 7/31/2012)
- ML13226A511 - Email R. Davis to J. Poole, RE: RPV Stud Holes and ASME Code Questions (Large File). (2 page(s), 8/16/2012)
- ML13226A447 - Email R. Guzman to G. Cheruvenki et al. re: 5/1 Review of VY Steam Dryer Inspection Reports at Local NEI/NPOC Rockville Office. (1 page(s), 4/30/2012)
- ML13226A496 - Email S. Crawford to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 6/19/2012)
- ML13226A437 - Email J. Poehler to J. Wiebe et al., re: Quad Cities Unit 2 Instrument Line Repair Relief Request Information. (2 page(s), 4/5/2012)
- ML13226A503 - Email J. Bartley to J. Zeiler, RE: Laminations Detected in Belgian Reactor Vessel (not good). (4 page(s), 8/3/2012)
- ML13226A497 - Email M. Benson to H. Rathbun, Subj: ORNL Models. (1 page(s), 6/27/2012)
- ML13226A494 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 6/30/2012)
- ML13226A452 - Email A. Cinson to G. Oberson, re: Nozzle 63 Discussions. (3 page(s), 5/10/2012)
- ML13226A442 - Email J. Collins to G. Oberson, re: Discussion of NA Nozzle. (3 page(s), 4/23/2012)
- ML13226A446 - Email T. Scarbrough to G. Cheruvenki, re: 5/1 Review of VY Steam Dryer Inspection Reports at Local NEI/NPOC Rockville Office. (1 page(s), 4/30/2012)
- ML13226A495 - Email A. Cinson to G. Oberson, Subj: CRDM Presentation. (1 page(s), 6/14/2012)
- ML13226A439 - Email J. Poehler to J. Wiebe, re: Quad Cities Unit 2 Relief Request Verbal Authorization Call with Licensee. (2 page(s), 4/16/2012)
- ML13227A219 - Email R. Hardies to J. Poehler, FW: Potential Problem on the Reactor. (3 page(s), 8/23/2012)
- ML13226A517 - Email T. Griesbach to J. Poehler, RE: EPRI Report on RV Fabrication. (1 page(s), 8/22/2012)
- ML13226A445 - Email J. Poehler to T. McLellan, re: Missed Exam. (2 page(s), 4/26/2012)
- ML13227A220 - Email J. Poehler to T. Griesbach, RE: EPRI Report on RV Fabrication. (2 page(s), 8/23/2012)
- ML13226A513 - Email P. Hiland to T. Lupold et al., FW: REQUEST: Belgium - Meeting on 8/16 re Flaw indications in Doel 3 Reactor Pressure Vessel. (7 page(s), 8/16/2012)
- ML13226A432 - Email B. Hanson to G. Oberson, re: N6783 SOW Modifications. (1 page(s), 2/16/2012)
- ML13226A499 - Email B. Hanson to G. Oberson et al., RE: finalizing NUREG/CR. (1 page(s), 7/5/2013)
- ML13226A443 - Email A. Cinson to G. Oberson, re: Canceled: EPRI Telecom on Nozzle 63. (1 page(s), 4/23/2012)
- ML13227A242 - Email A. Csontos to D. Dunn & G. Stevens, RE: Doel 3 Information. (3 page(s), 9/19/2012)
- ML13227A230 - Email R. Hardies to M. Cheok et al., FW: Doel 3 RPV Issue: Terms of Reference & Next meeting. (9 page(s), 9/6/2012)
- ML13227A228 - Memo M. Case to P. Hiland, Subj: Response to Research Assistance Request to Assess The Implications Of The Indications Discovered In The Doel 3 Reactor Pressure Vessel In Belgium (NRR-2012-005) (RAR). (4 page(s), 9/6/2012)
- ML13228A063 - Email A. Csontos to M. Case & G. Stevens, RE: Doel Update. (2 page(s), 10/10/2012)
- ML13228A049 - Email M. Kirk to R. Hardies et al., Subj: Date for Doel 3 International Committee meeting. (1 page(s), 9/21/2012)
- ML13227A227 - Email A. Csontos to J. Dion, RE: Research Assistance Request. (3 page(s), 9/5/2012)
- ML13227A233 - Email A. Csontos to S. West FW: RES response to research assistance request NRR-2012-005. (3 page(s), 9/11/2012)
- ML13227A229 - Email F. Brown to D. Failla, Nucleonics Week. (13 page(s), 9/6/2012)
- ML13228A071 - NRC International Travel Trip Report. (17 page(s), 10/22/2012)
- ML13227A243 - Email A. Csontos to M. Kirk, RE: Tomorrow. (2 page(s), 9/19/2012)
- ML13228A066 - NRC International Travel Trip Report. (7 page(s), 10/18/2012)
- ML13227A240 - Email C. Basavaraju to G. Cheruvenki, RE: VY steam dryer cracking. (1 page(s), 9/17/2012)
- ML13228A140 - Email T. Lupold to J. Trapp, RE: Vessel Flaws. (1 page(s), 10/23/2012)
- ML13227A226 - Email M. Kirk to C. Nove, FW: Doel 3. (3 page(s), 8/29/2012)
- ML13228A053 - Email G. Kulesa to T. Lupold, RE: Region 1 Support. (1 page(s), 9/27/2012)
- ML13228A050 - Email A. Csontos to M. Kirk, RE: Any chance someone form your branch could do the DE technical presentation at the monthly meeting next Monday? (1 page(s), 9/25/2012)
- ML13227A234 - Email A. Csontos to S. DePaula, FW: Research Assistance Request. (2 page(s), 9/12/2012)
- ML13227A235 - Email A. Csontos to R. Hardies, RE: Large NSSS Component Fabrication and Inspection. (2 page(s), 9/13/2012)
- ML13228A074 - Email M. Anderson to C. Nove, RE: need help with IRSN terminology. (1 page(s), 10/23/2012)
- ML13228A056 - Email A. Csontos to E. Hackett et al., Subj: Sorry that I missed your phone call. If you still need some clarification on handling the Doel info, LMK (EOM). (1 page(s), 10/4/2012)
- ML13228A072 - Email A. Csontos to G. Stevens, RE: Q2-Q4 FY 13 International Travel due Oct 26. (4 page(s), 10/23/2012)
- ML13228A139 - Email A. Csontos to M. Kirk & G. Stevens, RE: Doel 3 Sharepoint Site Permissions Changed. (1 page(s), 10/23/2012)
- ML13227A232 - Email A. Csontos to S. Richards et al., RE: Request for Approval of Foreign Travel to attend Doel Technical Work Groups. (2 page(s), 9/11/2012)
- ML13227A225 - Email J. Honcharik to A. Csontos et al., RE: ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 8/28/2012)
- ML13228A064 - Email A. Csontos to G. Stevens, RE: for your consideration. (2 page(s), 10/11/2012)
- ML13227A224 - Email K. Johnson to J. Dion, RE: Research Assistance Request. (2 page(s), 8/28/2012)
- ML13227A237 - Email A. Csontos to M. Kirk et al., RE: PTS NUREG. (1 page(s), 9/14/2012)
- ML13228A068 - Email A. Csontos to G. Stevens et al., RE: Please check the POW item. (1 page(s), 10/18/2012)
- ML13228A048 - Email A. Csontos to M. Gavrilas et al., RE: Impressions of the LWRS workshops. (2 page(s), 9/20/2012)
- ML13228A060 - Email H. Gray to T. Lupold, FW: Newspaper opinion article RE reactor vessel cracks. (2 page(s), 10/4/2012)
- ML13228A070 - NRC International Travel Trip Report. (17 page(s), 10/22/2012)
- ML13228A059 - Email S. Rutenkroger to H. Gray RE: Newspaper opinion article RE reactor vessel cracks. (2 page(s), 10/4/2012)
- ML13227A241 - Email H. Gray to J. Trapp, FW: NRC Daily Notes for September 14, 2012. (2 page(s), 9/17/2012)
- ML13228A058 - Email R. Hardies to H. Gray RE: Newspaper opinion article RE reactor vessel cracks. (2 page(s), 10/4/2012)
- ML13227A236 - Email A. Csontos to E. Hackett et al., RE: recent vessel flaw findings at Doel. (3 page(s), 9/13/2012)
- ML13228A052 - Email M. Kirk to J. Poehler, RE: Metallurgy of Hydrogen Flaking Document - for Doel 3 Meeting. (1 page(s), 9/26/2012)
- ML13228A076 - Email A. Csontos to M. Kirk, RE; question on your edits. (3 page(s), 10/23/2012)
- ML13228A054 - Email A. Csontos to J. Dion, RE: Urgent Action: FW: Resent with Revised Due dates: ACTION: Operating Reactors Sequestration Exercise. (6 page(s), 9/28/2012)
- ML13228A075 - Email A. Csontos to M. Kirk et al., RE: Slides for Brian on Thursday. (2 page(s), 10/23/2012)
- ML13227A238 - Email A. Csontos to M. Kirk, RE: Doel - request from FANC. (1 page(s), 9/14/2012)
- ML13228A055 - Email A. Csontos to C. Nove RE: today. (1 page(s), 10/4/2012)
- ML13228A051 - Email A. Csontos to R. Hardies, RE: FOIA Question. (2 page(s), 9/26/2012)
- ML13228A061 - Email M. Kirk to C. Fairbanks, Subj: Doel Q and A's. (1 page(s), 10/4/2012)
- ML13227A231 - Email A. Csontos to G. Wilkowski et al., RE: North Anna Meeting. (1 page(s), 9/10/2012)
- ML13227A222 - Email G. Stevens to R. Tregoning, Subj: ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 8/27/2012)
- ML13227A221 - P. Hiland to M. Case, Subj: Research Assistance Request. (1 page(s), 8/27/2012)
- ML13227A223 - Email D. Hills to T. Bilik et al., FW: ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 8/27/2012)
- ML13228A057 - Email from G. Oberson to B. Hanson, Subject: RE: CRDM NUREG. (4 page(s), 7/16/2012)
- ML13228A141 - Email A. Csontos to G. Stevens & M. Kirk, RE: Doel phone call tomorrow. (1 page(s), 10/24/2012)
- ML13228A073 - Email A. Csontos to R. Hardies et al., RE: Friendly Reminder: Trip Report Due. (3 page(s), 10/23/2012)
- ML13228A148 - Email M. Kirk to G. Stevens, RE: Doel 3 Brief/Next Steps - RESCHEDULED (again) Due to Sandy. (1 page(s), 10/30/2012)
- ML13228A142 - Email M. Kirk to J. Ramsey & G. Fehst, Subj: Doel 3 review board meeting. (2 page(s), 10/25/2012)
- ML13228A145 - Email M. Kirk to Mark, FW: Doel 3 review board meeting. (2 page(s), 10/26/2012)
- ML13228A144 - RES Management Briefing Indications in the DOEI 3 (Belgium) Reactor Pressure Vessel. (9 page(s), 10/25/2012)
- ML13228A147 - Email M. Kirk to P. Labeau et al., Subj: some comments on Tractebel documents. (15 page(s), 10/30/2012)
- ML13228A143 - RES Management Briefing Indications in the Doel 3 (Belgium) Reactor Pressure Vessel. (17 page(s), 10/25/2012)
- ML13228A146 - Email M. Kirk to C. Nove & G. Stevens, RE: Nondestructive Examination of VB395 block. (2 page(s), 10/26/2012)
- ML13317A767 - Email P. Hiland to D. Dorman et al., with Enclosure, Subj: Doel-3 Meeting. (3 page(s), 12/5/2012)
- ML13317A775 - Doel 3 - Tihange 2 RPV Issue International Expert Review Board Final Report. (17 page(s), 11/1/2013)
- ML13317A693 - FOIA/PA-2013-0139 - Resp 2 - Partial. (1 page(s), 10/25/2013)
- ML13317A821 - Email C. Latiolais to C. Nove, Subj: Doel. (1 page(s), 1/14/2013)
- ML13317A707 - Email B. Tombuyses to P. Ekstrom et al., RE: Doel 3 & Tihange 2 RPV issue - October 16 th meeting - WG2. (2 page(s), 11/14/2012)
- ML13317A918 - Email J. Poehler to T. Griesbach et al., FW: Re-Revision of NRC Report. (1 page(s), 11/1/2012)
- ML13317A772 - Email A. Artayet to D. Harmon et al., FW: Doel-3. (1 page(s), 12/20/2012)
- ML13317A906 - NRC Report Draft, Los Angeles, CA. (20 page(s), 2/28/2013)
- ML13317A695 - Email T. Hipschman to J. Zimmerman et al., FW: Update on Doel-3 issue. (1 page(s), 8/17/2012)
- ML13317A697 - Email T. Lupold to J. Trapp, RE: Vessel Flaws. (1 page(s), 10/23/2012)
- ML13317A702 - Email J. Poehler to R. Hardies, RE: the Doel 3 indications presentations for ET LT. (1 page(s), 11/8/2012)
- ML13317A913 - Email J. Creemers to A. Wertelaers et al., RE: Doel 3 & Tihange RPV: FANC Provisional Evaluation Report. (3 page(s), 2/7/2013)
- ML13317A914 - Email C. Fairbanks to J. Poehler, RE; Doel 3 - Tihange 2 RPV: FANC Provisional Evaluation Report. (3 page(s), 2/12/2013)
- ML13317A761 - Email B. Tombuyses to P. Ekstrom et al., RE: Doel 3 & Tihange RPV issue - October 16 th meeting - WG2. (2 page(s), 11/16/2012)
- ML13317A762 - Email F. Van Wonterghem to A. Thibault et al., Subj: Doel 3 & Tihange RPV issue - Comments and questions for WG1. (2 page(s), 11/16/2012)
- ML13317A905 - FANC: Flaw indications in the Reactor Pressure Vessels of Doel 3 and Tihange 2 - Technical Information Note. (5 page(s), 2/1/2013)
- ML13317A765 - Email J. Poehler to S. Rosenberg, RE: Accomplishments, Accomplishments!!! (2 page(s), 12/3/2012)
- ML13317A916 - Email G. Stevens to W. Bamford et al., SGES November Meeting Minutes. (33 page(s), 2/19/2013)
- ML13317A919 - Email G. Stevens to R. Hardies et al., FW: Doel 3 - Tihange 2 RPV Issue. (3 page(s), 11/6/2012)
- ML13317A812 - Email R. Dyle to R. Hardies, FW: Experts Okay Restart of Worrisome Belgian Nuclear Plants. (2 page(s), 1/7/2013)
- ML13317A699 - Email P. Wilson to J. Trapp, FW: Doel 3 one pager update after October meeting. (1 page(s), 10/25/2012)
- ML13317A902 - Email G. Roussel to R. Hardies et al., Doel 3 - Tihange 2 RPV issue. (1 page(s), 1/29/2013)
- ML13317A917 - Email J. McGhee to C. Phillips, FW: Doel 3 Tihange 2 RPV Flaws. (1 page(s), 3/11/2013)
- ML13317A769 - Email C. Nove to G. Stevens et al., FW: Doel 3 - Tihange 2 RPV issue: Safety Case Reports. (3 page(s), 12/6/2012)
- ML13317A824 - Email M. Kirk to M. Kirk, et al., Subj: Belgians are cautiously positive on Doel 3 and Tihange 2. (1 page(s), 1/15/2013)
- ML13317A701 - Email M. Deprez to A. Weyn et al., Subj: WG2 - English translation of Areva document. (1 page(s), 11/6/2012)
- ML13317A709 - Email M. Modes to J. Trapp, RE: Flaw Distributions in the Reactor Vessel. (2 page(s), 11/15/2012)
- ML13317A915 - Email S. Min to C. Fairbanks et al., Preliminary Comments on the Quasi-laminar Indications. (1 page(s), 2/14/2013)
- ML13317A823 - FANC Press Release, Subj: Doel 3 and Tihange 2: the FANC requests more information from Electrabel. (1 page(s), 1/15/2013)
- ML13317A921 - Email G. Stevens to G. Roussel, RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 11/7/2012)
- ML13317A901 - FANC Press Release, Doel 3 and Tihange 2: the FANC requests more information from Electrabel. (1 page(s), 1/15/2013)
- ML13317A920 - Email G. Stevens to G. Roussel, et al., RE: Doel 3 - Tihange 2 RPV Issue. (4 page(s), 11/6/2013)
- ML13317A912 - NRC Report. (19 page(s), 2/28/2013)
- ML13317A764 - Email J. Poehler to C. Fairbanks, RE: Monthly meeting with Dan. (3 page(s), 11/20/2012)
- ML13317A818 - Email A. Csontos to M. Kirk et al., RE: Post Belgium Mike/Stu Briefing. (1 page(s), 1/11/2013)
- ML13317A704 - Email C. Fairbanks to J. Poehler, RE: Slides for Doel Briefing next Tuesday. (1 page(s), 11/9/2013)
- ML13317A819 - Email G. Roussel to R. Hardies et al., Subj: Doel 3 and Tihange 2 RPV issue. (1 page(s), 1/14/2013)
- ML13317A903 - FANC Report: Doel 3 and Tihange 2 Reactor Pressure Vessels - Provisional Evaluation Report. (63 page(s), 1/30/2013)
- ML13317A908 - Email T. Lupold to W. Norris, FW: First Draft of Report. (1 page(s), 2/6/2013)
- ML13317A770 - Email S. Rosenberg to J. Poehler, RE: Communicating up. (1 page(s), 12/10/2012)
- ML13317A904 - Email F. Van Wonterghem to A. Thibault et al., Doel 3 & Tihange RPV issue - FANC Provisional Evaluation Report. (3 page(s), 2/1/2013)
- ML13317A899 - Email A. Issa to T., Le et al., RE; Emailing: PER 647214 Latent error in stress analysis for rx vessel core support block. (5 page(s), 1/16/2013)
- ML13317A900 - Email D. Harmon to S. Freeman et al., RE: Belgians are Cautiously Positive on Doel 3 and Tihange 2. (2 page(s), 11/17/2013)
- ML13317A816 - Email T. Lupold to R. Hardies et al., Subj: Regulatory Information Conference (RIC) 2013- Planning Information. (3 page(s), 1/11/2013)
- ML13317A811 - Email C. Nove to F. VanWonterghem, et al., Subj: Doel 3 - Tihange 2 RPV issue - feedback on WG1 reports. (1 page(s), 1/6/2013)
- ML13317A814 - Email T. Nazario to A. Issa, RE; Emailing: PER 647214 Latent error in stress analysis for rx vessel core support block. (4 page(s), 1/11/2013)
- ML13317A809 - Email T. Wells to R. Hardies, RE: Doel 3 PFM Analyses. (1 page(s), 1/4/2013)
- ML13317A758 - Email F. Van Wonterghem to A. Thibault et al., RE: Doel 3 & Tihange RPV issue - New Licensee documents. (3 page(s), 11/16/2012)
- ML13317A706 - Email M. Kirk to T. Pope et al., Subj: Foreign Travel Request: Belgium December 15-19 (concerning Doel). (1 page(s), 11/13/2012)
- ML13317A907 - Email G. Roussel to R. Hardies et al., Doel 3 - Tihange 2 RPV Issue. (1 page(s), 2/6/2013)
- ML13317A974 - Email G. Stevens to M. Kirk et al., FW: Doel 3 - Tihange 2 RPV Issue - WG3 - Justification file. (2 page(s), 11/30/2012)
- ML13317B010 - Email R. Hardies, NRR to G. Stevens, RES et al., RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317A979 - Email S. Rosenberg, NRR to C. Fairbanks et al., NRR RE: Bilateral with France. (4 page(s), 12/5/2012)
- ML13317A975 - Email J. Poehler, NRR to G. Stevens, RES RE: Doel 3-tihange 2 RPV Issue-wg3-justification file. (3 page(s), 12/3/2012)
- ML13317A993 - Email G. Stevens, RES to R. Hardies, NRR et al., FW: Doel 3-Tihange 2 RPV Issue-WG3-Justification File. (7 page(s), 12/17/2012)
- ML13317A978 - Email F. Van Wonterghem, FANC to A. Thibault, ASN et al., on Doel 3- Tihange 2 RPV Issue; Licensee Documents & Next meeting 8 & 9 January 2013. (5 page(s), 12/5/2012)
- ML13317A972 - Email G. Stevens to M. Kirk et al., FW: Minutes of the Meeting of October 16th, 2012. (2 page(s), 11/30/2012)
- ML13317A938 - Email G. Stevens to R. Hardies, FW: Request for PTS Time Histories. (1 page(s), 11/8/2013)
- ML13317A964 - Email J. Hopkins, NRR to R. Hardies, NRR FW: MDEP-CSWG-10th meeting Draft Summary Record-Information on Doel event. (7 page(s), 11/26/2012)
- ML13317B009 - Email C. Nove, RES to R. Hardies, NRR et al., RE: your per-trip notification. (2 page(s), 12/20/2012)
- ML13317A963 - Email S. Rosenberg to C. Fairbanks et al., FW: Doel 3 Updates. (3 page(s), 11/20/2012)
- ML13317A955 - Email from B. Tombuyses, FANC to P. Ekstrom, et al., on Doel 3 & Tihange 2 RPV Issue - October 1 6th Meeting - WG2. (14 page(s), 11/14/2012)
- ML13317A995 - Email A. Csontos to S. Rosenberg et. al., Subj: RES Doel Work & PTS RG NUREG Tech Basis. (1 page(s), 12/17/2012)
- ML13317A992 - Email G. Stevens, RES to R. Hardies, NRR et al., RE: Doel 3-Tihange 2 RPV Issue-WG3-justification file. (2 page(s), 12/11/2012)
- ML13317A962 - Email G. Stevens to A. Csontos et al., Subj: Bel V Meeting Summary. (4 page(s), 11/19/2012)
- ML13317B007 - Email J. Poehler, NRR to B. Tombuyses, FANC., RE: Doel 3 & Tihange 2 RPV issue - WG2 - Laborelec notes. (4 page(s), 12/19/2012)
- ML13317A939 - Email J. Poehler to S. Rosenberg et al., RE; Doel 3 Update. (2 page(s), 11/9/2012)
- ML13317B002 - Email G. Stevens to G. Roussel et al., RE: Doel 3-Tihange 2 RPV Issue: Licensee Documents & Next Meeting: 8 & 9 January 2013. (3 page(s), 12/18/2012)
- ML13317A959 - Email G. Stevens, RES to R. Hardies, NRR re: Talking Point for Leeds on Doel for ASN. (1 page(s), 11/15/2012)
- ML13317A942 - Email P. Hiland, NRR to R. Hardies, NRR RE: Response - Trip Report for Travel to Brussel, Belgium October 13-18, 2012, to Discuss Indications at Doel 3. (2 page(s), 11/13/2013)
- ML13317A937 - Email R. Hardies, NRR to J. Poehler, NRR RE: the Doel 3 Indications Presentations for ET LT. (1 page(s), 11/4/2012)
- ML13317A986 - Email C. Nove, RES to R. Hardies, NRR RE: Final FANC Meeting Jan 8-9, Postponing Public Meeting Jan 8. (2 page(s), 12/5/2012)
- ML13317A958 - Email G. Stevens to C. Nove et al., re: Doel 3 NDE info and WG# Info. (1 page(s), 11/14/2012)
- ML13317B011 - Email C. Nove, RES to R. Hardies, NRR RE: Doel 3 plans and proposed actions. (2 page(s), 12/20/2012)
- ML13317A977 - Email R. Dyle, EPRI to R. Hardies, NRR FW: Doel 3 follow-up. (1 page(s), 12/5/2012)
- ML13317A989 - Email A. Csontos to J. Poehler et al., RE: Doel 3 - Tihange 2 RPV Issue: Licensee Documents & Next Meeting: 8 & 9 January 2013. (3 page(s), 12/5/2012)
- ML13317A988 - Email N. Carol to Stevens G et al., RE: Doel 3-Tihange 2 RPV Issue - WG3. (3 page(s), 12/5/2012)
- ML13317A941 - Email G. Stevens to R. Tregoning, ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 11/12/2013)
- ML13317B005 - Email J. Poehler, NRR to B. Tombuyses, FANC et al., RE: Doel 3 & Tihange 2 RPV issue - WG2 - Laborelec notes. (3 page(s), 12/18/2012)
- ML13317A965 - Email G. Roussel to G. Stevens et al., Subj: Doel 3- Tihange 2 RPV Issue-WG3-Justification file. (13 page(s), 11/30/2012)
- ML13317A945 - Email D. Merzke, EDO to R. Hardies, NRR RE: Response - Trip report for travel to Brussels, Belgium October 13-18, 2012, to Discuss Indications at Doel-3. (3 page(s), 11/14/2013)
- ML13317A973 - Email M. Kirk to G. Stevens et al., Subj: Very Informal Belgium Trip Report. (3 page(s), 11/30/2012)
- ML13317A991 - Email M. Kirk to J. Ramsey et al., Subj: 1 more Meeting Requested Concerning Doel. (2 page(s), 12/6/2012)
- ML13317A981 - Email R. Dyle EPRI to R. Hardies, NRR RE: Postponing Jan 8 Doel Meeting. (1 page(s), 12/5/2012)
- ML13317A987 - Email M. Kirk to J. Poehler et al., RE: Doel 3-Tihange 2 RPV Issue: Licensee Documents & Next Meeting: 8 & 9 January 2013. (3 page(s), 12/5/2012)
- ML13317A944 - Email L. Streibig, ASN to R. Hardies, NRR RE: BMI Penetration Degradation in France. (2 page(s), 11/13/2012)
- ML13317A943 - Meeting Slides on Indications in Reactor Pressure Vessel Forgings NRR/DE Management Briefing. (11 page(s), 11/13/2012)
- ML13317A980 - Email C. Fairbanks, NRR to S. Rosenbergy et al., NRR RE: Bilateral with France. (4 page(s), 12/5/2012)
- ML13317A960 - Email P. Hiland, NRR to R. Hardies, NRR RE: Talking Point for Leeds on Doel for ASN. (4 page(s), 11/15/2012)
- ML13317A961 - Email G. Stevens to C. Nove et al., re: Meeting with Guy Roussel (Bel V) to Discuss RPV Issues. (2 page(s), 11/15/2012)
- ML13317B006 - Email M. Kirk to A. Csontos et al., Subj: Information from Belgium re Doel. (2 page(s), 12/18/2012)
- ML13317A956 - Email G. Stevens to C. Nove et al., RE: Doel 3 & Tihange 2 RPV issue - October 16 th meeting - WG1: Non-Destructive Examination Techniques Meeting Report. (2 page(s), 11/14/2012)
- ML13317B008 - Email R. Hardies, NRR to C. Nove, RES et al., FW; Chairman briefing on Doel 3. (2 page(s), 12/19/2012)
- ML13317B003 - Email J. Poehler, NRR to R. Hardies, NRR et al., RE: Doel 3 - Tihange 2 RPV issue - WG3 - justification file. (4 page(s), 12/18/2012)
- ML13317B004 - Email J. Poehler, NRR to B. Tombuyses, FANC et al., RE: Doel 3 & Tihange 2 RPV issue - WG2 - Laborelec notes. (4 page(s), 12/18/2012)
- ML13317A976 - Email M. Dennis, EPRI to C. Nove, RES et al., RE: Public Meeting Schedule Regarding the Recent Doe 3 OE. (1 page(s), 12/4/2012)
- ML13317A994 - Email G. Stevens to N. Dasseville et al., RE: Doel 3 - Tihange 2 RPV Issue: Licensee Documents & Next Meeting 8 & 9 January 2013. (2 page(s), 12/17/2012)
- ML13317A990 - Email A. Csontos to M. Kirk et al., RE: Doel 3-Tihange 2 RPV Issue: Licensee documents & Next Meeting: 8 & 9 January 2013. (5 page(s), 12/5/2012)
- ML13317A940 - Email J. Poehler to S. Rosenberg et al., RE: Doel 3 Update. (2 page(s), 11/9/2012)
- ML13317A936 - Email G. Stevens to R. Tregoing et al., FW: Doel 3 - Tihange 2 RPV Issue. (5 page(s), 11/7/2012)
- ML13317B179 - Email M. Kirk to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (5 page(s), 1/11/2013)
- ML13317B068 - Email F. Van Wonterghem, FANC to A. Thibault, ASN et al., on Doel 3 - Tihange 2 RPV Issue: Detailed agenda for meeting of 8&9 January 2013. (3 page(s), 1/2/2013)
- ML13317B235 - Email M. Auglaire to D. Lamond et al., RE: URGENT- Need help this weekend!!!!! RE: p.004315-RPV Project for Tractebel-Doel 3 Review. (3 page(s), 1/13/2013)
- ML13317B056 - Email A. Csontos to R. Hardies, RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317B300 - Email M. Kirk, RES to C. Nove, RES et al., on explanation of laminar cracks en Francais. (1 page(s), 1/18/2013)
- ML13317B303 - Email J. Poehler to B. Vaidya, Subj: FW NMP1 Relief Requese SE. (2 page(s), 1/22/2013)
- ML13317B067 - Email Kanno-Masanori, JNES to B. Tombuyes, FANC et al., on Comments to Safety Case Report of Doel 3 RPV Issue. (4 page(s), 12/29/2012)
- ML13317B052 - Email J. Poehler, NRR to G. Stevens, RES RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317B117 - Email G. Stevens to L. Lindhorst, RE: My comments and questions on the safety case of defects in Doel-3. (7 page(s), 1/2/2013)
- ML13317B293 - Email J. Poehler to C. Fairbanks, Subj: Sulfur and Hydrogen. (1 page(s), 1/15/2013)
- ML13317B171 - Email J. Poehler to C. Nove, RE: CAN Comments on NDE Reports. (1 page(s), 1/7/2013)
- ML13317B124 - Email A. Csontos to M. Case et al., FW: My comments and questions on the safety case of defects in Doel-3. (4 page(s), 1/4/2013)
- ML13317B170 - Email J. Poehler to P. Hiland, RE: Action Plan on Doel. (2 page(s), 1/7/2013)
- ML13317B302 - Email C. Nove to A. Weyn, FW: Doel Indications. (2 page(s), 1/18/2013)
- ML13317B239 - Email P. Hiland, NRR to R. Hardies, NRR FW: Brief summary of the discussions with FANC this week to discuss Doel. (2 page(s), 1/14/2013)
- ML13317B167 - Email M. Sotelino, State to R. Hardies, NRR RE: Visit to Brussels Jan 7-10. (4 page(s), 1/7/2013)
- ML13317B247 - Email J. Poehler, NRR to C. Nove, RES RE: Doel 3 Sharepoint Site. (1 page(s), 1/15/2013)
- ML13317B241 - Email M. Kirk to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (7 page(s), 1/14/2013)
- ML13317B125 - Email C. Nove to M. Kirk et al., Subj: CAN Comments on NDE Reports. (8 page(s), 1/4/2013)
- ML13317B174 - Email C. Fairbanks, NRR to M. Kirk, RES et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (3 page(s), 1/11/2013)
- ML13317B059 - Email M. Kirk to R. Hardies, RE: Doel 3 plans and proposed actions. (3 page(s), 12/20/2012)
- ML13317B064 - Email G. Stevens to J. Poehler, RE: My comments and questions on the safety case of defects in Doel-3. (3 page(s), 12/21/2012)
- ML13317B168 - Email S. Crombez, ASN to R. Hardies, NRR RE: Doel 3 - Tihange 2 RPV issue - WG3 - justification file. (5 page(s), 1/7/2013)
- ML13317B120 - Email M. Kirk to R. Hardies RE: Suggested agenda for NRC Staff meeting on Doel, 11 or 1.4 January. (5 page(s), 1/3/2013)
- ML13317B297 - Committee Correspondence on Agenda for February 12, 2013, Meeting and Minutes from November 6, 2012, Meeting. (20 page(s), 1/16/2013)
- ML13317B062 - Email A. Csontos to M. Case, et al., RE: Carol Doel Trip. (1 page(s), 12/21/2012)
- ML13317B169 - Email G. Stevens to K. Hasegawa et al., RE: My comments and questions on the safety case of defects in Doel-3. (4 page(s), 1/7/2013)
- ML13317B237 - Email T. Griesbach to D. Lamond et al., FW: URGENT - Need help this weekend!!!!! RE: p.004315-RPV Project for Tractebel-Doel 3 Review. (6 page(s), 1/13/2013)
- ML13317B244 - Email C. Nove to R. Hardies et al., Subj: C Nove summary of Jan 2013 meeting at FANC + path forward thoughts. (6 page(s), 1/14/2013)
- ML13317B126 - Email R. Hardies, NRR to G. Stevens, RES et al., FW: Doel 3 - Tihange 2 RPV issue - WG3 justification file. (4 page(s), 1/6/2013)
- ML13317B122 - Email F. Van Wonterghem to R. Hardies, RE: Doel 3 - Tihange 2 RPV issue: Meeting of 8&9 January 2013: Change of Location. (3 page(s), 1/4/2013)
- ML13317B299 - Email J. Poehler to S. Rosenberg et al., FW: WG OPC November 2012 Meeting Minutes and February 2013 Meeting Agenda. (2 page(s), 1/17/2013)
- ML13317B290 - Email J. Poehler, NRR to G. Stevens, RES RE: Doel 3 Sharepoint Site. (1 page(s), 1/15/2013)
- ML13317B233 - Email T. Griesbach to D. Lamond et al., RE: URGENT - Need help this weekend!!!! RE: P.004315-RPV Project for Tractebel-Doel 3 Review.' (4 page(s), 1/13/2013)
- ML13317B119 - Email A. Csontos to C. Nove et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (5 page(s), 1/3/2013)
- ML13317B245 - Email G. Stevens to C. Nove et al., FW: Doel 3 and Tihange 2 RPV issue. (1 page(s), 1/14/2013)
- ML13317B295 - Email C. Fairbanks, NRR to J. Poehler, NRR RE: Strawman Information Request List and Screening Criteria. (1 page(s), 1/16/2013)
- ML13317B118 - Email G. Stevens to A. Csontos et al., FW: My comments and questions on the safety case of defects in Doel-3. (7 page(s), 1/2/2013)
- ML13317B173 - Email N. Sanfilippo to R. Hardies, RE: Doel. (1 page(s), 1/8/2013)
- ML13317B053 - Email R. Hardies to C. Fairbanks et al., Subj:-Doel 3 plans and proposed actions with Enclosures. (22 page(s), 12/20/2012)
- ML13317B061 - Email B. Brickstad, SSM to G. Roussel, Belgium et al., on My comments and questions on the safety case of defects in Doel -3. (3 page(s), 12/21/2012)
- ML13317B292 - Email L. Streibig to R. Hardies, RE: Meeting about Doel 3. (1 page(s), 1/15/2013)
- ML13317B121 - Email H. Kunio, JNES to B. Brickstad, Belgium et al., RE: My comments and questions on the safety case of defects in Doel 3. (3 page(s), 1/4/2013)
- ML13317B243 - Email G. Stevens to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (4 page(s), 1/14/2013)
- ML13317B338 - Email C. Nove, RES to R. Hardies, NRR et al., FW: Belgium trip report with Mark's comments. (4 page(s), 1/18/2013)
- ML13317B242 - Email M. Kirk to M. Kirk et al., RE: Development of NRC Staff Consensus Approach following Doel/Tihange Discoveries. (3 page(s), 1/14/2013)
- ML13317B176 - Email C. Nove to S. Richards et al., FW: Brief summary of the discussions with FANC this week to discuss Doel. (2 page(s), 1/11/2013)
- ML13317B057 - Email A. Csontos to R. Hardies, RE: Doel 3 plans and proposed actions. (2 page(s), 12/20/2012)
- ML13317B177 - Email M. Kirk to R. Hardies et al., RE: Brief summary of the discussions with FANC this week to discuss Doel. (2 page(s), 1/11/2013)
- ML13317B127 - Email G. Roussel, Belgium to R. Hardies, NRR RE: Doel 3 - Tihange 2 RPV issue - WG3 - justification file. (4 page(s), 1/7/2013)
- ML13317B428 - Email M. Kirk to C. Fairbanks et al., RE: NRC Actions on Quasi- Laminar Flaws. (3 page(s), 2/19/2013)
- ML13317B348 - Email M. Kirk to C. Fairbanks et al., FW: Draft QL Flaw User Need - Sent to NRR-NRO for Comment. (7 page(s), 1/30/2013)
- ML13317B384 - Email C. Breskovic to C. Breskovic with Enclosure, Subj: GNOSIS News 2013-02-07. (2 page(s), 2/7/2013)
- ML13317B420 - Email R. Dyle to M. Kirk et al., RE: Doel 3 - Tihange 2 RPV Issue: FANC Provisional Evaluation Report. (5 page(s), 2/12/2013)
- ML13317B421 - Email M. Kirk, RES to R. Hardies, NRR et al., Re: Quasi-laminar Crack Meeting Next Tuesday Afternoon. (2 page(s), 2/15/2013)
- ML13317B423 - Email C. Fairbanks, NRR to M. Kirk, RES et al., RE: NRC Actions on Quasi-Laminar Flaws. (4 page(s), 2/19/2013)
- ML13317B385 - Email J. Poehler, NRR to S. Min,NRR et al., RE: Hydrogen Sources. (1 page(s), 2/7/2013)
- ML13317B341 - Email R. Dyle to R. Hardies, FW: Conference call on Doel Work Being Performed by Industry - Call-in Number Added. (2 page(s), 1/23/2013)
- ML13317B419 - Email S. Stuchell, NRR to R. Hardies, NRR RE: Doel Meeting. (3 page(s), 2/12/2013)
- ML13317B379 - Email J. Poehler, NRR to S. Min, NRR RE: Sizes of the Defect Indications (Doel 3). (1 page(s), 2/4/2013)
- ML13317B350 - Email J. Poehler, NRR to S. Min, NRR RE: RE: Sizes of the Defect Indications (Doel 3). (1 page(s), 2/1/2013)
- ML13317B386 - Email S. Min, NRR to J. Poehler, NRR et al., RE: Hydrogen Sources. (2 page(s), 2/7/2013)
- ML13317B347 - Email G. Stevens to C. Fairbanks et al., RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 1/30/2013)
- ML13317B349 - Email G. Roussel to M. Kirk et al., RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 1/30/2013)
- ML13317B429 - Email M. Kirk to C. Fairbanks et al., RE: NRC Actions on Quasi- Laminar Flaws. (1 page(s), 2/19/2013)
- ML13317B382 - Email G. Stevens to G. Roussel, RE: Doel 3 - Tihange 2 RPV Issue. (2 page(s), 2/6/2013)
- ML13317B344 - Email G. Stevens to C. Nove et al., RE: Doel 3 - Tihange 2 RPV Issue with Enclosure. (42 page(s), 1/29/2013)
- ML13317B380 - Email C. Nove to G. Stevens, R. Hardies, FW: March 5th Public Meeting on Hydrogen Flaking - Draft Meeting Announcement. (2 page(s), 2/4/2013)
- ML13317B383 - Email G. Stevens to C. Fairbanks et al., FW: Doel 3 - Tihange 2 RPV Issue. (1 page(s), 2/6/2013)
- ML13317B430 - Email N. Perry to L. Pinkham, D. Schroeder, FW: IOEB Clearinghouse Screening Summary for Thursday, August 2, 2012. (4 page(s), 4/26/2013)
- ML13317B427 - Email G. Stevens to C. Fairbanks et al., RE: NRC Actions on Quasi-Laminar Flaws. (4 page(s), 2/19/2013)
- ML13317B345 - Email G. Stevens to M. Kirk et al., Subj: New Report from Belgium. (1 page(s), 1/29/2013)
- ML13317B388 - Email G. Stevens to W. Norris et al., RE: First Draft of Report. (1 page(s), 2/7/2013)
- ML13317B343 - Email M. Kirk, RES to C. Fairbanks, NRR et al., on March 5 Public Meeting. (1 page(s), 1/28/2013)
- ML13317B340 - Email M. Kirk to R. Hardies et al., Subj: Recent Doel International Review Board (IRB) activity. (14 page(s), 1/23/2013)
- ML13317B424 - 02/19/2013 Meeting Notice on NRC Actions on Quasi-Laminar Flaws. (8 page(s), 2/19/2013)
- ML13317B381 - Email M. Kirk to B. Yip RE: Belgium: FANC's Doel/Tihange Restart Requirements. (1 page(s), 2/5/2013)
- ML13317B387 - Email M. Kirk to B. Yip et al., RE: OIP Note Dated February 6, 2013 - Belgian Federal Agency for Nuclear Control, with Enclosure. (8 page(s), 2/7/2013)
- ML13317B351 - Email M. Kirk, RES to R. Hardies, NRR Re: NRC Program for h2 Flaking. (1 page(s), 2/1/2013)
- ML13317B418 - Email K. Masanori, JNES to R. Hardies, NRR RE: On Issue of Doel 3 & Tihange2 RPV. (2 page(s), 2/12/2013)
- ML13317B425 - Email G. Stevens to ASME Code Participants; RES_DE_CIB; R. Tregoning; RES_DE_CMB, Subj: ASME Code Meeting Report - Subgroup on Evaluation Standards. (7 page(s), 2/19/2013)
- ML14010A180 - FOIA/PA-2013-0011A - Resp 1 - Final. Enclosure, Part 1 of 1. (1 page(s), 1/6/2014)
- ML14010A181 - FOIA/PA-2013-0011A - Resp 1 - Final. (1 page(s), 1/6/2014)