Home > NRC Library > ADAMS Public Documents
FOIA/PA-2013-0139 - Resp 1 - Partial.
Accession Number: ML13218B326
Date Released: Monday, June 24, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13218B265 - FOIA/PA-2013-0139 - Resp 1 - Partial. (43 page(s), 6/14/2013)
- ML12220A536 - IR 05000391-12-605, on 06/30/2012, Watts Bar Nuclear Plant, Unit 2 Construction - NRC Integrated Inspection. (44 page(s), 8/7/2012)
- ML12167A212 - IR 05000391-12-604, on 04/01/2012 - 05/19/2012, Watts Bar Nuclear Plant, Unit 2, Construction - NRC Integrated Inspection Report. (44 page(s), 6/14/2012)
- ML12034A202 - IR 05000391-11-610, on 12/31/2011, Watts Bar Nuclear Plant, Unit 2, Construction-NRC Integrated Inspection. (40 page(s), 2/3/2012)
- ML120050183 - Watts Bar Nuclear Plant, Unit 2 - Request for Relief Regarding Use of American Society of Mechanical Engineers Boiler & Pressure Vessel Code Cases N-801 & N-802 (TAC No. ME7063). (10 page(s), 1/19/2012)
- ML11279A218 - Memo - Task Interface Agreement - Evaluation Of Compliance With Code For Examination Of Flange Stud Holes On The Replacement Vessel Head At The Davis-Besse Nuclear Power Station (TIA 2011-015). (5 page(s), 10/6/2011)
- ML112201418 - IR 05000391-11-605, on 07/02/11, Watts Bar Nuclear Plant, Unit 2. (68 page(s), 8/5/2011)
- ML110800483 - IR 05000391-11-602, on 01/01 - 02/19/2011, Watts Bar, Unit 2 Construction. (57 page(s), 3/18/2011)
- ML110410680 - IR 05000391-10-605, on 10/01/10 - 12/31/10, Tennessee Valley Authority. (107 page(s), 2/9/2011)
- ML102170465 - IR 05000391-10-603; 04/01/2010 - 06/30/2010; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection Report. (82 page(s), 8/5/2010)
- ML090291033 - IR 05000391-08-001, on 10/01/2008 - 12/31/2008; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2, Integrated Inspection Report. (30 page(s), 1/29/2009)
- ML083050404 - IR 05000391-08-009, on 07/01 -09/30/2008, Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated. (26 page(s), 10/30/2008)
- ML083090046 - Watts Bar, Unit 2, Preservice Inspection Program Plan and Request for Relief No. WBN-2/PDI-4. (77 page(s), 10/30/2008)
- ML082560373 - Watts Bar Nuclear Plant, Unit 2 - Request For Relief Regarding Alternative Rules For Renewal of Active or Expired N-Type Certificates (TAC MD8314). (8 page(s), 10/2/2008)
- ML12172A001 - Comparison of Non-Destructive and Destructive Examination Findings for a Leak Path Assessment of a Pressurized Water Reactor Control Rod Drive Nozzle. (17 page(s), 7/19/2012)
- ML12241A160 - NUREG/CR-7142 " Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation." (137 page(s), 8/31/2012)
- ML121350004 - Comparison of an Ultrasonic Phased Array Evaluation with Destructive Analysis of a Documented Leak Path in a Nozzle Removed from Service. (10 page(s), 5/14/2012)
- ML120800002 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism Nozzle Interference Fit and Weld Region - NDE Results and Destructive Analysis. (14 page(s), 3/20/2012)
- ML122990315 - Vermont Yankee Nuclear Power Station - 8/22/12 E-mail from J. Devincentis to R. Guzman re: Draft Steam Dryer RAI Response. (1 page(s), 8/22/2012)
- ML122990318 - Vermont Yankee Nuclear Power Station - 9/17/12 E-mail from P. Couture to R. Guzman re: Steam Dryer Call and Draft Steam Dryer RAI Response. (1 page(s), 9/17/2012)
- ML120730304 - Surry Power Station, Unit Nos. 1 and 2 - Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC NOS. ME6803 and ME6804). (31 page(s), 4/17/2012)
- ML12284A478 - Vermont Yankee, Technical Specifications Proposed Change 296, Supplement 1, Response to Request for Additional Information. (14 page(s), 10/3/2012)
- ML12046A849 - Surry Power Station, Unit 1, Review of the Steam Generator Tube Inservice Inspection Report for the Refueling Outage in 2010 (TAC No. ME6375). (4 page(s), 2/27/2012)
- ML12048A676 - Surry Power Station, Units 1 & 2 - Response to Request for Additional Information Related to License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair. (73 page(s), 2/14/2012)
- ML12054A679 - Issuance of Order to Modify Licenses With Regard to Reliable Spent Fuel Pool Instrumentation. (40 page(s), 3/12/2012)
- ML12056A044 - Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - To All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status. (36 page(s), 3/12/2012)
- ML121520304 - Vermont Yankee - E-mail from R.Guzman to J. Devincentis - Request for Additional Information re: License Amendment to Revise OL Condition 3.S Regarding Steam Dryer Inspections (TAC No. ME7733). (2 page(s), 5/31/2012)
- ML12076A158 - Surry 2012 Request for Information Letter Rev. 1. (11 page(s), 3/14/2012)
- ML12087A350 - Surrey Power Station, Units 1 and 2 - Safety Evaluation Regarding License Amendment Request - Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC Nos. ME6803 and ME6804). (26 page(s), 3/27/2012)
- ML12089A274 - Mtg Ann -Surry Regulatory Conference - 2012. (6 page(s), 3/29/2012)
- ML12102A235 - Surry Nuclear Power Station Unit 1 - Notification of Inspection and Request for Information. (12 page(s), 4/11/2012)
- ML12109A270 - Surry Power Station, Unit Nos. 1 and 2 - Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (TAC Nos. ME6803 and ME6804). (39 page(s), 4/17/2012)
- ML12118A471 - Dominion's Answer Opposing Requests for Heariing. (10 page(s), 4/27/2012)
- ML12131A564 - IR 05000280-12-002, 05000281-12-002, on 03/31/2012, Surry Power Station, Units 1 and 2; Identification and Resolution of Problems. (29 page(s), 5/10/2012)
- ML12213A543 - IR 05000280-12-003 & 05000281-12-003; Virginia Electric and Power Company; 04/01/2012 - 06/30/2012; Surry Power Station, NRC Integrated Inspection Report. (39 page(s), 7/31/2012)
- ML12222A340 - Surry, Units 1 and 2, Proposed Technical Specifications to Adopt TSTF-510, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection," Using the Consolidated Line Item Improvement Process. (35 page(s), 7/31/2012)
- ML12242A347 - Surry, Unit 1, Inservice Inspection Owner's Activity Report (OAR). (11 page(s), 8/16/2012)
- ML120260681 - NUREG/CR-7110 Vol 2 "State-of-the-Art Reactor Consequence Analyses Project: Surry Integrated Analysis". (559 page(s), 1/31/2012)
- ML120330272 - NRC Information Notice 2012-11: Age Related Capacitor Degradation. (5 page(s), 7/23/2012)
- ML12053A340 - Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights From the Fukushima Dai-Ichi Accident. (81 page(s), 3/12/2012)
- ML12056A050 - Enclosure 4 - Recommendation 2.3: Flooding. (9 page(s), 3/12/2012)
- ML121910339 - Kewaunee, Millstone, Units 2 & 3, North Anna, Units 1 & 2, Surry, Units 1 & 2, 2011 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46. (29 page(s), 6/28/2012)
- ML12279A308 - IR 05000280-12-011 & 05000281-12-011; Virginia Electric and Power Company; 07/30/2012 - 08/03/2012; Surry Power Station, NRC Triennial Fire Protection Inspection Report. (31 page(s), 10/4/2012)
- ML12187A165 - Surry Power Station, Unit 2 - Response to Request for Additional Information 2011 Steam Generator Inservice Inspection Report. (7 page(s), 6/22/2012)
- ML12283A306 - Surry Nuclear Plant, Unit 2 - Notification of Inspection and Request for Information. (12 page(s), 10/4/2012)
- ML12122A885 - IR 05000327-12-002, 05000328-12-002, on 1/1/2012 - 3/31/2012 Sequoyah Nuclear Plant, Units 1 & 2, Adverse Weather Protection, Fire Protection, Flood Protection Measures, Evaluation of Changes, Tests, or Experiments, & Permanent Plant Modifications,..... (54 page(s), 4/30/2012)
- ML12216A259 - IR 05000327-12-003 & 05000328-12-003; Tennessee Valley Authority; 04/01/2012 - 06/30/2012; Sequoyah Nuclear Plant, Unit 1 and 2, Integrated Inspection Report 2012003. (29 page(s), 8/1/2012)
- ML120370286 - Fermi 2 - Evaluation of Applicable Ten Year Interval Inservice Inspection Relief Request - Use of Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements. (11 page(s), 2/17/2012)
- ML12128A426 - North Anna Power Station, Unit 1, Relief Request N1-14-NDE-007, Approval to Extend the Fourth Interval First Period for Reactor Vessel Interior VT-3 Visual Examination (B-N-1). (8 page(s), 4/26/2012)
- ML12207A062 - North Anna Power Station, Units 1 and 2 - Relief Request N1-14-NDE-007 to Extend the fourth 10-Year first Period for the Reactor Vessel Interior VT-3 Visual Examination (TAC NO. ME8493). (8 page(s), 7/27/2012)
- ML12020A234 - North Anna Unit 1, Order - EA 03-009 Sixty-Day Report Reactor Pressure Vessel (RPV) Head Inspection Results. (6 page(s), 1/12/2012)
- ML12228A723 - Catawba Nuclear Station, Units 1 and 2 - Proposed Relief Request 11-CN-001 for the Third Ten-Year Inservice Inspection Interval (TAC Nos. ME7277-ME7283). (31 page(s), 8/20/2012)
- ML12108A026 - Quad Cities, Unit 2, Response to Request for Additional Information Regarding Relief Request 14R-19 and Additional Followup Question on the Flaw Evaluation. (39 page(s), 4/14/2012)
- ML13218B258 - Draft Memo from M. Mitchell, NRR to R. Pascarelli, NRR on Request for Additional Information Related to Request for Relief for Fermi, Unit 2 Reactor Vessel Internal Components. (4 page(s), 6/14/2013)
- ML13218B259 - Draft - Thermo-Mechanical Analysis of Pressure Vessels. (9 page(s), 6/14/2013)
- ML13218B260 - History of P-T Limits for Heatup, Cooldown, and Leak Test. (5 page(s), 6/14/2013)
- ML13218B261 - Quality Assurance of Chapter 9: Definition of the Beltline. (11 page(s), 6/14/2013)
- ML13218B262 - Quality Assurance of Chapter 10: Requirements for Nozzles. (3 page(s), 6/14/2013)
- ML13218B263 - Quality Assurance of Chapter 11: Requirements on Upper Shelf Energy. (15 page(s), 6/14/2013)
- ML13218B239 - Flowchart for Creating PWR Cooldown P-T Curves. (12 page(s), 6/14/2013)
- ML13218B241 - Allowable Pressure for Benson Transient Number 1 Calculated per ASME Code Versus Actual P(t). (4 page(s), 6/14/2013)
- ML13218B243 - Originator: G. Stevens, Objectives List. (2 page(s), 6/14/2013)
- ML13218B245 - Email from G. Oberson to J. Collins, Subject: Leak Path Assessment Work. (1 page(s), 1/3/2012)
- ML13218B247 - Email from B. Hanson to G. Oberson, Subject: N6783 Work. (2 page(s), 1/3/2012)
- ML13218B248 - Email from B. Hanson to G. Oberson, Subject: RE: MRP Abstract. (1 page(s), 1/4/2012)
- ML13218B250 - Email from J. Poehler to G. Cheruvenki, RE: Core Plate Components - Fermi. (1 page(s), 1/9/2012)
- ML13218B252 - Email from S. Freeman to D. Failla, FW: Meeting With Westinghouse/PCI to Discuss Site Activities. (2 page(s), 1/14/2012)
- ML13218B253 - Email from R. Haag to T. Nazario, RE: Mockup for RPV Stud Hole Sleeving. (1 page(s), 1/26/2012)
- ML13218B254 - Email from G. Cheruvenki to A. Hon, et al., FW: Acceptance Review - Vermont Yankee steam dryer inspections. (1 page(s), 2/1/2012)
- ML13218B255 - Email from T. Scarbrough, NRO to J. Kim, NRR et al. RE: Acceptance Review - Vermont Yankee steam dryer inspections. (2 page(s), 2/7/2012)
- ML13218B256 - Draft Regulatory Evaluation. (9 page(s), 2/7/2012)
- ML13218B257 - Email from R. Lewis to R. Monk, RE: I forgot and Left the SR You Handed me on your Desk, If You can Send Me the #. Also... (1 page(s), 2/7/2012)
- ML13219A031 - NUREG/CR-XXXX PNNL-XXXXX Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation. (126 page(s), 2/8/2012)
- ML13219A032 - Email from J. Poehler to C. Basavaraju, FW: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13219A033 - Email from J. Poehler to G. Cheruvenki, FW: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (1 page(s), 2/14/2012)
- ML13219A034 - Email from J. Poehler to P Purtscher, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13219A035 - Email from J. Poehler to G. Cheruvenki, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/14/2012)
- ML13219A036 - Regulatory Evaluation. (9 page(s), 2/15/2012)
- ML13219A037 - Email from J. Poehler to C. Basavaraju, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/15/2012)
- ML13219A038 - Email from J. Poehler to P. Purtscher, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/15/2012)
- ML13219A039 - Email from J. Poehler to C. Basavaraju, RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis. (2 page(s), 2/22/2012)
- ML13219A041 - Email from G. Cheruvenki to J. Kim, RE: Inspections - Steam dryer - Todays Meeting at 1:00 P.M. (2 page(s), 2/23/2012)
- ML13219A042 - Email from G. Cheruvenki to J. Kim, RE: Inspections Steam Dryer - Todays meeting at 1:00 P.M. (1 page(s), 2/24/2012)
- ML13219A043 - Email from T. Scarbrough to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (2 page(s), 2/28/2012)
- ML13219A044 - Email from T. Nazario to R. Haag, et al, FW: RV Stud Hole Remediation Demonstration - Lake Bluff, IL (2 page(s), 3/5/2012)
- ML13219A045 - Presentation: SPIE Smart Structures/NDE 2012 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism (CRDM) Nozzle Interference Fit and Weld Region NDE Results and Destructive Analysis. (29 page(s), 3/7/2012)
- ML13219A046 - Memo from M. Case to P. Hiland, Subject: Review of Draft NUREG/CR-XXXX Entitled, "Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Validation." (117 page(s), 3/13/2012)
- ML13219A047 - Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis. (17 page(s), 3/15/2012)
- ML13219A048 - Ultrasonic Phased Array Evaluation of Control Rod Drive Mechanism (CRDM) Nozzle interference fit and weld region - NDE Results and Destructive Analysis. (7 page(s), 3/19/2012)
- ML13219A049 - Email from J. Poehler to G. Cheruvenki, RE: MRP-227 - Plant Submittals. (1 page(s), 3/20/2012)
- ML13219A050 - Email from J. Poehler to A. Hiser, et al, RE: MRP-227 - Plant Submittals. (1 page(s), 3/20/2012)
- ML13219A051 - Email from T. Nazario to J. Seat, RE: Report Inputs. (1 page(s), 4/3/2012)
- ML13220A255 - Email from J. Kim to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (2 page(s), 4/4/2012)
- ML13220A256 - Email from J. Poehler to S. Rosenberg, RE: Accomplishments for March. (1 page(s), 4/4/2012)
- ML13220A258 - Email from J. Kim to G. Cheruvenki, et al, RE: VY Steam Dryer Inspection Reports. (3 page(s), 4/5/2012)
- ML13220A259 - Email from T. Scarbrough to J. Kim, et al, RE: VY Steam Dryer Inspection Reports. (3 page(s), 4/6/2012)
- ML13220A260 - Email from R. Guzman to W. Jessup, RE: VY Steam Dryer Inspection Reports. (5 page(s), 4/11/2012)
- ML13220A261 - Email from B. Hanson to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (1 page(s), 4/11/2012)
- ML13220A262 - Email from S. Crawford to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (2 page(s), 4/11/2012)
- ML13220A263 - Email from G. Oberson to J. Collins, Subject: nozzle 63 meeting. (1 page(s), 4/11/2012)
- ML13220A264 - Email from S. Crawford to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (2 page(s), 4/11/2012)
- ML13220A265 - Email from J. Collins to R. Swain, Subject: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (1 page(s), 4/11/2012)
- ML13220A266 - Email from J. Collins to R. Swain, Subject: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (1 page(s), 4/12/2012)
- ML13220A267 - Email from A. Cinson to G. Oberson, Subject: RE: meeting with industry on Nozzle 63 work. (1 page(s), 4/16/2012)
- ML13220A268 - Email from G. Oberson to J. Collins, Subject: RE: Setting up a conference call on PNNL's ultrasonic leak path work on NA Nozzle #63. (2 page(s), 4/16/2012)
- ML13220A269 - Email from M. Benson to M. Kirk, RE: Draft J-R data scumming letter. (1 page(s), 4/17/2012)
- ML13220A270 - Email from M. Benson to G. Stevens, RE: Draft J-R data scumming letter. (2 page(s), 4/17/2012)
- ML13220A271 - Email from M. Benson to D. Alley, RE: North Anna Event Info. (1 page(s), 4/18/2012)
- ML13220A272 - Email from M. Benson to H. Rathbun, RE: Just let me know if I can help with N Anna stuff. (1 page(s), 4/19/2012)
- ML13220A273 - Email from J. Poehler to V. Sreenivas, RE: Missed Exam. (3 page(s), 4/27/2012)
- ML13220A274 - Comparison of an Ultrasonic Phased Array Evaluation with Destructive Analysis of a Documented Leak Path in a Nozzle Removed from Service. (9 page(s), 4/30/2012)
- ML13220B097 - Email from M. Benson to Bud Brust, RE: North Anna WRS Analysis with Discussion. (1 page(s), 8/7/2012)
- ML13220B098 - Email from M. Benson to Bud Brust, RE: North Anna WRS Analysis with Discussion. (1 page(s), 5/7/2012)
- ML13220B099 - Email from G. Oberson to J. Collins, Subject: nozzle 63 Draft NUREG. (1 page(s), 5/9/2012)
- ML13220B100 - Email from M. Benson to G. Stevens, RE: Realistic Transient Slides. (1 page(s), 5/11/2012)
- ML13220B102 - Email from J. Collins to M. Gavrilas, Subject: FW: Closeout of Y020120062 - NRR Review of Draft NUREG/CR-XXXX, Entitled, Ultrasonic Phased Array Assessment of the Interface Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle. (2 page(s), 5/11/2012)
- ML13220B103 - Email from A. Cinson re Discussions on Nozzle 63 work. (1 page(s), 5/11/2012)
- ML13220B104 - Email from S. Crawford to G. Oberson, Subject: RE: Status of NUREG/CR. (1 page(s), 5/14/2012)
- ML13220B105 - Email from S. Crawford to G. Oberson, Subject: RE: status of NUREG/CR. (2 page(s), 5/14/2012)
- ML13220B106 - Email from B. Hanson to G. Oberson, Subject: RE: status of NUREG/CR. (1 page(s), 5/14/2012)
- ML13220B107 - Email from G. Oberson to B. Hanson, Subject: RE: status of NUREG/CR. (1 page(s), 5/15/2012)
- ML13220B108 - Email from S. Crawford to G. Oberson et al., Subject: RE: following up on NUREG Comments. (1 page(s), 5/30/2012)
- ML13220B109 - Email from R. Guzman to G. Cheruvenki, RE: Inspections - Steam Dryer - Todays meeting at 1:00 pm. (19 page(s), 5/30/2012)
- ML13221A030 - Email from A. Cinson to G. Oberson et al., Subject: RE: following up on NUREG Comments. (2 page(s), 5/31/2013)
- ML13221A031 - Email from S. Crawford to G. Oberson et al., Subject: RE: following up on NUREG comments. (2 page(s), 5/31/2012)
- ML13221A032 - Email from S. Crawford to G. Oberson et al., Subject: RE: following up on NUREG comments. (4 page(s), 5/31/2012)
- ML13221A033 - Email from M. Benson to A. Csontos, RE: RG 1.161 "Analysis of Existing JR Correlations for Regulatory Guide 1.161 Update. (3 page(s), 6/4/2012)
- ML13221A034 - Email from A. Cinson to G. Oberson et al., Subject: RE: following up on NUREG comments. (1 page(s), 6/5/2012)
- ML13221A036 - E-mail form M. Benson to P. Purtscher, RE: 6-6-12 Draft MRP Update to RG1-161. (1 page(s), 6/6/2012)
- ML13221A037 - Email from G. Oberson to B. Hanson, Subject: SNF Issues. (1 page(s), 6/14/2012)
- ML13221A038 - Email from S. Crawford to G. Oberson, Subject: RE: Nozzle 63 Presentation for EPRI Materials Reliability Meeting. (2 page(s), 6/18/2012)
- ML13221A039 - Email from S. Crawford to G. Oberson, Subject: RE: Nozzle 63 Presentation for EPRI Materials Reliability Meeting. (1 page(s), 6/18/2012)
- ML13221A040 - Email from S. Crawford to G. Oberson, Subject: CRDM NUREG/CR. (1 page(s), 6/19/2012)
- ML13221A041 - Email from B. Hanson to G. Oberson, Subject: RE: CRDM NUREG/CR. (2 page(s), 6/19/2012)
- ML13221A046 - Email from G. Oberson to J. Collins, Subject: Nozzle 63 NUREG/CR. (1 page(s), 6/20/2012)
- ML13221A047 - Email from J. Poehler to J. Medoff, et al, FW: Background - Kewaunee RAI-MRP-227-A. (3 page(s), 6/25/2012)
- ML13221A048 - Meeting Scheduler, Subject: NRC Meeting to Discuss Reactor Vessel and Steam Generator Questions. (1 page(s), 6/26/2012)
- ML13221A049 - Email from J. Poehler to N. Salgado, et al, RE: SE by NRR, Fourth 10 Year Internal Inservice Inspection for North Anna. (6 page(s), 6/27/2012)
- ML13221A050 - Email from G. Oberson to J. Collins, Subject: NUREG/CR-7142. (1 page(s), 6/29/2012)
- ML13221A051 - Email from G. Oberson to B. Hanson, Subject: Vacuum Drying. (1 page(s), 7/5/2012)
- ML13221A052 - Email from B. Hanson to G. Oberson, Subject: RE: Vacuum Drying. (1 page(s), 7/6/2012)
- ML13221A053 - Email from G. Oberson to J. Collins, Subject: Nozzle 63 Journal Article. (1 page(s), 7/13/2012)
- ML13221A054 - Email from A. Cinson to G. Oberson, Subject: RE: Journal Article, Nozzle 63. (2 page(s), 7/16/2012)
- ML13221A055 - Email from B. Hanson to G. Oberson, Subject: FW: CRDM NUREG. (1 page(s), 7/16/2012)
- ML13221A056 - Email from G. Oberson to B. Hanson, Subject: RE: CRDM NUREG. (1 page(s), 7/16/2012)
- ML13221A057 - Email from B. Hanson to G. Oberson, Subject: FW: Project 59038/N6783 Due to Expire 7/31/12. (2 page(s), 7/17/2012)
- ML13221A058 - Email from J. Baptist to T. Nazario, RE: Please Send me the List of Items to be Closed/Discussed in IR 2011605. Need it by Wed. Since we Exit on Thurs. Thanks. (2 page(s), 7/17/2012)
- ML13221A059 - Presentation: (2012 EPRI Materials Reliability Conference and Exhibit) by M. Benson et al., NRC Office of Research, Subject: Thermomechanical Analysis of Pressure Vessels. (12 page(s), 11/14/2012)
- ML13225A042 - Email from B. Hanson to B. Hanson & G. Oberson, Subject: RE: Project 59038/N6783 due to Expire 7/31/12. (2 page(s), 7/20/2012)
- ML13225A043 - Email P. Briegleb to C. Sebastien et al., Subj: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (3 page(s), 7/25/2012)
- ML13225A044 - Email from M. Benson to M. Kirk, RE: RG 1.161 PVP Paper. (1 page(s), 7/30/2012)
- ML13225A045 - Email C. Roquecruz to J. Poehler, FW: REQUEST: Belgium - Meeting on 8/16 re Flaw indications in Doel 3 Reactor Pressure Vessel. (3 page(s), 8/3/2012)
- ML13225A046 - Email M. Kirk to M. Case, FW: URGENT Message on Nuclear Safety: Flaw indications in Doel 3 Reactor Pressure Vessel. (8 page(s), 8/3/2012)
- ML13225A047 - Email J. Collins to T. Lupold, FW: Urgent Message on Nuclear Safety: Flaw indications in Doel 3 Reactor Pressure Vessel. (10 page(s), 8/3/2012)
- ML13225A048 - Email from J. Poehler to D. Widrevitz, et al. RE: Answers to questioner 3/8/2012. (1 page(s), 8/6/2012)
- ML13225A049 - Email J. Collins to T. Lupold, FW: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (5 page(s), 8/7/2012)
- ML13225A050 - Email G. Shear to M. Ring, FW: REQUEST: Belgium - Meeting on 8/16 re Flaw Indications in Doel 3 Reactor Pressure Vessel. (5 page(s), 8/10/2012)
- ML13225A051 - FANC Info Sheet on the Reactor and the Reactor Vessel. (7 page(s), 8/10/2012)
- ML13225A052 - Email S. Malik to RESDECIB, Regulators to Discuss DOEL-3 Belgian Reactor Pressure Vessel Cracks. (3 page(s), 8/12/2012)
- ML13225A053 - Email from D. Hills to S. Rosenberg, et al, FW: DOEL 3 (Belgium) Flaw Indications in the Reactor Pressure Vessel. (3 page(s), 8/13/2012)
- ML13225A054 - Email J. Lara to C. Casto, FW: Doel 3 (Belgium) - Flaw Indications in the Reactor Pressure Vessel. (4 page(s), 8/13/2012)
- ML13225A055 - Email R. Guzman to J. Quichocho, RE: Request: Belgium - Meeting on 8/16 re Flaw Indications in Doel 3 Reactor Pressure Vessel. (7 page(s), 8/13/2012)
- ML13225A056 - Email J. Tsao to T. Lupold, Subj: Notes from the Branch Chief Meeting on 8/13/2012. (1 page(s), 8/13/2012)
- ML13225A057 - Email J. Poehler to R. Hardies, RE: Action: Followup of List of NPPs with RPVs Forged by Rotterdam Dockyards (RDM). (4 page(s), 8/13/2012)
- ML13225A058 - Email R. Hardies to J. Poehler, FW: Action: Followup of List of NPPs with RPVs Forged by Rotterdam Dockyards. (4 page(s), 8/13/2012)
- ML13225A059 - Email J. Poehler to C. Fairbanks, Doel 3 issue - List of Plants with Forgings Manufactured by Rotterdam. (2 page(s), 8/13/2012)
- ML13225A060 - Email C. Fairbanks to J. Poehler, RE: ACTION: Followup of List of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (5 page(s), 8/13/2012)
- ML13225A061 - Email C. Fairbanks to J. Poehler, Watts Bar 2 Did Have a (joint) GL 92-01 Response. (2 page(s), 8/13/2012)
- ML13225A062 - Email C. Fairbanks to R. Hardies, RE: Rotterdam Plants. (1 page(s), 8/13/2012)
- ML13225A063 - Email S. Meighan to J. Thompson et al., Action: Followup of List of NPPs with RPVs Forged by Rotterdam Dockyards (RDM). (2 page(s), 8/13/2012)
- ML13225A064 - Email J. Poole to R. Guzman, RE: Action: Followup of List of NPPs with RPVs forged by Rotterdam Dockyards. (3 page(s), 8/13/2012)
- ML13225A065 - Email J. Poole to S. Meighan, RE: Action: Followup of List of NPPs with RPVs forged by Rotterdam Dockyards. (3 page(s), 8/13/2012)
- ML13225A279 - Email S. Lingam to S. Meighan, RE: RPV Material Issue. (2 page(s), 8/13/2012)
- ML13225A141 - Q & A for Chairman Macfarlane on Cracks Found in Belgian Nuclear Plant Reactor Vessel for the August 14, 2012, National Press Club Media Roundtable. (1 page(s), 8/13/2012)
- ML13225A142 - Email G. Shear to M. Ring, FW: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (1 page(s), 8/14/2012)
- ML13225A143 - Email S. Rosenberg to P. Hiland, RE: ACTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (3 page(s), 8/15/2012)
- ML13225A144 - Email J. Hopkins to J. Poehler, Subj: QUESTION; Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (4 page(s), 8/15/2012)
- ML13225A145 - Email C. Roque-Cruz to J. Poehler, RE: Pressure Vessel Inspections. (3 page(s), 8/16/2012)
- ML13225A146 - Email J. Poehler to C. Roque-Cruz, RE: Pressure Vessel Inspections. (3 page(s), 8/16/2012)
- ML13225A147 - Email D. Hills to T. Lupold, RE: Doel 3 (Belgium) - Flaw Indications in the Reactor Pressure Vessel. (4 page(s), 8/16/2012)
- ML13225A148 - Email P. Hiland to T. Lupold, Subj: Doel 3 followup. (1 page(s), 8/16/2012)
- ML13225A149 - Email J. Poehler to J. Hopkins, RE: QUESTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (5 page(s), 8/16/2012)
- ML13225A150 - Email J. Hopkins to J. Poehler, RE: QUESTION: Followup of list of NPPs with RPVs forged by Rotterdam Dockyards (RDM). (5 page(s), 8/16/2012)
- ML13225A151 - Email from M. Benson to M. Kirk, RE: What is the unit "nvt", relative to neutron exposure? (1 page(s), 8/17/2012)
- ML13225A152 - Email from M. Benson to M. Kirk, RE: what is the unit "nvt", relative to neutron exposure? (1 page(s), 8/17/2012)
- ML13225A153 - Email D. Hills to V. Meghani, FW: Doel 3 (Belgium) - Flaw Indications in the Reactor Pressure Vessel. (4 page(s), 8/21/2012)
- ML13225A154 - Email from M. Benson to M. Kirk, Subject: Throwing a Dart at FAVOR. (1 page(s), 8/23/2012)
- ML13225A155 - Email from M. Benson to M. Kirk, RE: Throwing a Dart at FAVOR. (1 page(s), 8/27/2012)
- ML13225A156 - Email from A. Cinson to G. Oberson, Subject: RE: publication of nozzle 63 NUREG/CR. (1 page(s), 8/27/2012)
- ML13225A157 - Email from C. Fairbanks to M. Kirk, Comments - RE: RESEND: draft slides for 8/28 public meeting. (7 page(s), 8/27/2012)
- ML13225A158 - Email from S. Crawford to G. Oberson, Subject: RE: publication of nozzle 63 NUREG/CR. (1 page(s), 9/5/2012)
- ML13225A159 - Email from J. Collins to M. Thadani & Justin Poole, Subject: NUREG CR-7142 on Volumetric Leak Path Assessment. (1 page(s), 9/5/2012)
- ML13225A160 - Email from A. Csontos to J. Dion, RE: Research Assistance Request. (2 page(s), 9/5/2012)
- ML13225A161 - Email from A. Csontos to S. Richards, RE: Research Assistance Request. (2 page(s), 9/5/2012)
- ML13225A162 - Email from D. Garmon to J. Poehler, RE: Research on Hydrogen Cracking in Reactor Vessels Related to Doel 3. (1 page(s), 9/7/2012)
- ML13225A163 - Email from A. Csontos to C. Brown, RE: Large NSSS Component Fabrication and Inspection. (2 page(s), 9/11/2012)
- ML13225A164 - Email from A. Csontos to S. West, RE: RES Response to NRR Research Assistance Request on Doel 3 Reactor. (1 page(s), 9/11/2012)
- ML13225A165 - Email A. Csontos to M. Case, RE: Large NSSS Component Fabrication and Inspection. (2 page(s), 9/12/2012)
- ML13225A323 - Email from G. Cheruvenki to R. Guzman, RE: VY steam dryer. (1 page(s), 9/12/2012)
- ML13225A324 - Email from A. Csontos to M. Case, FW: Briefing. (1 page(s), 9/13/2012)
- ML13225A325 - Email from A. Csontos to R. Hardies, FW Request for Approval of Foreign Travel to attend DOEL Technical Work Groups. (2 page(s), 9/13/2012)
- ML13225A326 - Email from A. Csontos to J. Uhle, RE Request for Approval of Foreign Travel to attend DOEL Technical Work Groups. (3 page(s), 9/13/2012)
- ML13225A327 - S. Sheng, et al, RE VY Steam Dryer Cracks. (1 page(s), 9/13/2012)
- ML13225A328 - Email M. Kirk to P. Labeau, RE: Doel 3 International Committee. (2 page(s), 9/13/2012)
- ML13225A329 - Email from G. Cheruvenki to R. Guzman on Environmental Evaluation for VY Steam Dryer Amendment. (1 page(s), 9/14/2012)
- ML13225A330 - An Ultrasonic Leak Path Assessment of a Pressurized Water Reactor Control Rod Drive Mechanism Nozzle. (12 page(s), 9/17/2012)
- ML13225A331 - Email from J. Poehler to E. Reichelt, et al, on New Reactors Audits of Forging Producers. (1 page(s), 9/17/2012)
- ML13225A332 - Email from J. Poehler to E. Reichelt, RE: New Reactors Audits of Forging Producers. (1 page(s), 9/18/2012)
- ML13225A333 - Email from A. Csontos to R. Hardies, Accepted: FW: Recap of DOEL 3. (1 page(s), 9/19/2012)
- ML13225A334 - Email from M. Kirk to R. Hardies, Et al, on Hydrogen Flake Papers. (1 page(s), 9/20/2012)
- ML13225A335 - Article from Keene Sentinel. (1 page(s), 9/21/2012)
- ML13225A336 - Meeting Notice on Vermont Yankee LAR - Steam Dryer Review. (3 page(s), 9/24/2012)
- ML13225A337 - Email from J. Poehler to R. McIntyre, RE: Japan Steel Works Info Related to Forging Practices. (2 page(s), 9/26/2012)
- ML13225A338 - Email from A. Csontos to C. Brown, RE: Reducing the Susceptibility of Cracking in Alloy 690. (2 page(s), 9/26/2012)
- ML13225A339 - Email from J. Poehler to G. Stevens, RE: Metallurgy of Hydrogen Flaking Document - for DOEL 3 Meeting. (3 page(s), 9/27/2012)
- ML13225A340 - Email from A. Csontos to S. Richards, RE: Counterintelligence (CI) Travel Briefings and Debriefings. (3 page(s), 9/27/2012)
- ML13225A341 - Email form G. Oberson to J. Collins, Subject: Journal Article on Nozzle 63 work. (1 page(s), 9/28/2012)
- ML13225A342 - Email from A. Csontos to R. Hardies, Accepted: ACRS presentation on the DOEL3 Indications. (1 page(s), 10/2/2012)
- ML13225A343 - Email from R. Guzman to G. Cheruvenki, RE:VY Steam Dryer Cracking. (1 page(s), 10/3/2012)
- ML13225A344 - Organizer: A. Csontos, Subject: ACRS Meeting on DOEL-3 Indications. (1 page(s), 10/4/2012)
- ML13225A345 - Email from N. Sheehan to H. Gray, et al, RE: Newspaper Opinion Article. (2 page(s), 10/4/2012)
- ML13225A346 - Email from T. Burns to S. Rutenkroger, RE: Newspaper Opinion Article. (1 page(s), 10/4/2012)
- ML13225A347 - Email from H. Gray to R. Hardies, RE: Newspaper Opinion Article. (1 page(s), 10/4/2012)
- ML13226A158 - Email from T. Setzer to S. Rutenkroger, RE: Newspaper Opinion Article. (1 page(s), 10/4/2012)
- ML13226A159 - Email from S. Rutenkroger to R. Bellamy, FW: Newspaper Opinion. (1 page(s), 10/4/2012)
- ML13226A160 - Email from R. Guzman to T. Setzer, RE: Newspaper Opinion Article. (2 page(s), 10/4/2012)
- ML13226A161 - Email from S. Rutenkroger from R. Bellamy, FW: Newspaper Opinion Article. (3 page(s), 10/5/2012)
- ML13226A162 - Email Van Wonterghem to listed web sites, RE: Doel 3 RPV Issue - Details on October 16th meeting - WG1: Non-Destructive Examination Techniques. (3 page(s), 10/9/2012)
- ML13226A163 - Email from A. Csontos to M. Kirk, RE: Task Request: Task DOEL 3. (3 page(s), 10/10/2012)
- ML13226A164 - E-mail from R. Hardies to C. Fairbanks, FW: EPRI Questions to Electrabel. (1 page(s), 10/10/2012)
- ML13226A165 - Email from A. Csontos to S. Rosenberg, RE: RIC. (1 page(s), 10/11/2012)
- ML13226A166 - Email from A. Csontos to T. Clark, RE: Westems Discussion. (2 page(s), 10/16/2012)
- ML13226A167 - Email from S. Freeman to S. Shaeffer, RE: laminations detected in Belgian reactor vessel. (3 page(s), 10/17/2012)
- ML13226A168 - Email from A. Csontos to G. Stevens, RE: DOEL 3 one pager update in September. (1 page(s), 10/25/2012)
- ML13226A169 - Email from M. Kirk to A. Csontos, re: Roles and Responsibilities. (3 page(s), 10/25/2012)
- ML13226A170 - Email from A. Csontos to M. Kirk, re: Roles and Responsibilities. (4 page(s), 10/26/2012)
- ML13226A171 - Originator: Gary Stevens, Subject: DOEL 3 Brief/Next Steps Meeting. (1 page(s), 11/1/2012)
- ML13226A172 - Presentation (Phoenix, AZ) by M. Benson - Subject: ASME Code Section XI Nonmandatory Appendix K Update. (4 page(s), 11/8/2012)
- ML13226A173 - Doel Debrief. (1 page(s), 6/14/2013)
- ML13226A174 - Metallurgical Aspects Influencing the Potential for Hydrogen Flaking in Forgings for Reactor Pressure Vessels. (26 page(s), 6/14/2013)
- ML13226A175 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 1/31/2012)
- ML13226A176 - Email J. Poehler to J. Kim, re: Draft Follow-Up RAI for Core Plate Bolt Analysis. (1 page(s), 1/11/2012)
- ML13226A177 - Email B. Hanson to G. Oberson et al., re: Draft NUREG. (1 page(s), 1/17/2012)
- ML13226A179 - Email T. Nazario to R. Haag, Subj: Mockup for RPV Stud Hole Sleeving. (2 page(s), 1/26/2012)
- ML13226A180 - Email T. Nazario to D. Failla, FW: Mockup for RPV Stud Hole Sleeving. (2 page(s), 1/26/2012)
- ML13226A181 - Email B. Hanson to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 1/31/2012)
- ML13226A182 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 2/29/2012)
- ML13226A183 - Email B. Hanson to G. Oberson, re: Follow Up on Draft NUREG and Contract Status. (3 page(s), 2/13/2012)
- ML13226A430 - Email G. Oberson to B. Hanson, re: Follow Up on Draft NUREG and Contract Status. (3 page(s), 2/14/2012)
- ML13226A431 - Email A. Cinson to G. Oberson, re: Follow Up on Draft NUREG and Contract Status. (4 page(s), 2/15/2012)
- ML13226A432 - Email B. Hanson to G. Oberson, re: N6783 SOW Modifications. (1 page(s), 2/16/2012)
- ML13226A433 - Email B. Hanson to G. Oberson, re: N6783 SOW Modifications. (2 page(s), 2/23/2012)
- ML13226A434 - Email R. Haag to T. Nazario, re: Mockup for RPV Stud Hole Sleeving. (2 page(s), 2/23/2012)
- ML13226A435 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 3/31/2012)
- ML13226A436 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 4/30/2012)
- ML13226A437 - Email J. Poehler to J. Wiebe et al., re: Quad Cities Unit 2 Instrument Line Repair Relief Request Information. (2 page(s), 4/5/2012)
- ML13226A438 - Email M. Benson to G. Stevens et al. re: J-R Curve Data (Ferritic Material Focus). (3 page(s), 4/10/2012)
- ML13226A439 - Email J. Poehler to J. Wiebe, re: Quad Cities Unit 2 Relief Request Verbal Authorization Call with Licensee. (2 page(s), 4/16/2012)
- ML13226A440 - Email G. Oberson to J. Collins, re: Discussion of NA Nozzle. (3 page(s), 4/23/2012)
- ML13226A442 - Email J. Collins to G. Oberson, re: Discussion of NA Nozzle. (3 page(s), 4/23/2012)
- ML13226A443 - Email A. Cinson to G. Oberson, re: Canceled: EPRI Telecom on Nozzle 63. (1 page(s), 4/23/2012)
- ML13226A444 - Email A. Cinson to G. Oberson, re: CRDM-9th EPRI NDE Conference. (1 page(s), 4/26/2012)
- ML13226A445 - Email J. Poehler to T. McLellan, re: Missed Exam. (2 page(s), 4/26/2012)
- ML13226A446 - Email T. Scarbrough to G. Cheruvenki, re: 5/1 Review of VY Steam Dryer Inspection Reports at Local NEI/NPOC Rockville Office. (1 page(s), 4/30/2012)
- ML13226A447 - Email R. Guzman to G. Cheruvenki et al. re: 5/1 Review of VY Steam Dryer Inspection Reports at Local NEI/NPOC Rockville Office. (1 page(s), 4/30/2012)
- ML13226A448 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 5/31/2012)
- ML13226A449 - Email A. Cinson to G. Oberson, Subj: Nozzle 63 Discussions. (1 page(s), 5/8/2012)
- ML13226A450 - Email A. Cinson to G. Oberson, re: Nozzle 63 Discussions. (2 page(s), 5/10/2012)
- ML13226A451 - Email A. Cinson to G. Oberson, re: Nozzle 63 Discussions. (2 page(s), 5/10/2012)
- ML13226A452 - Email A. Cinson to G. Oberson, re: Nozzle 63 Discussions. (3 page(s), 5/10/2012)
- ML13226A453 - Email A. Cinson to G. Oberson, Subj: Anthony.cinson@pnnl.gov is Requesting Files From you. (1 page(s), 5/11/2012)
- ML13226A454 - Email A. Cinson to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 5/11/2012)
- ML13226A455 - Email A. Cinson to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 5/16/2012)
- ML13226A494 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 6/30/2012)
- ML13226A495 - Email A. Cinson to G. Oberson, Subj: CRDM Presentation. (1 page(s), 6/14/2012)
- ML13226A496 - Email S. Crawford to G. Oberson, Subj: You Have Files Ready for Pickup. (1 page(s), 6/19/2012)
- ML13226A497 - Email M. Benson to H. Rathbun, Subj: ORNL Models. (1 page(s), 6/27/2012)
- ML13226A498 - JCN-N6783 Properties of CRDM Welds. (5 page(s), 7/31/2012)
- ML13226A499 - Email B. Hanson to G. Oberson et al., RE: finalizing NUREG/CR. (1 page(s), 7/5/2013)
- ML13226A500 - Email S. Crawford to G. Oberson, RE: Review Journal Article. (1 page(s), 7/10/2012)
- ML13226A501 - Email R. Hardies to T. Lupold RE: REQUEST: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (4 page(s), 7/25/2012)
- ML13226A502 - Email R. Hardies to P. Hiland RE: INFO: Potential Problem on the Reactor Pressure Vessel (RPV) of the Belgian Doel 3 NPP. (4 page(s), 8/2/2012)
- ML13226A503 - Email J. Bartley to J. Zeiler, RE: Laminations Detected in Belgian Reactor Vessel (not good). (4 page(s), 8/3/2012)
- ML13226A504 - Email J. Poehler to R. Hardies, RE: More Belgian-Related Info. (2 page(s), 8/10/2012)
- ML13226A519 - Email J. Poehler to P. Hiland, RE: More Belgian-Related Info. (2 page(s), 8/10/2012)
- ML13226A505 - Email S. Burnell to J Poehler et al., RE: More Belgian-Related Info. (2 page(s), 8/10/2012)
- ML13226A506 - Email J. Poehler to T. Lupold & P. Hiland, RE: Rapidly Moving Media Story. (4 page(s), 8/10/2012)
- ML13226A507 - Email Van Wonterghem to iean-luc.lachaumeDasn.fr et al., Subj: Technical Meeting "Indications in Doel 3 Reactor Pressure Vessel": August 16. (5 page(s), 8/13/2012)
- ML13226A508 - Email N. DiFrancesco to J. McGhee, Subj: Quad Cities 2. (3 page(s), 8/14/2012)
- ML13226A509 - Email M. Kirk to R. Hardies, FW: Some Information. (4 page(s), 8/14/2012)
- ML13226A510 - Email A. Hull to D. Alley, Subj: as Discussed Yesterday; Regulators to Discuss DOEL-3 Belgian Reactor Pressure Vessel Cracks. (3 page(s), 8/16/2012)
- ML13226A511 - Email R. Davis to J. Poole, RE: RPV Stud Holes and ASME Code Questions (Large File). (2 page(s), 8/16/2012)
- ML13226A512 - Email M. Cheok to R. Hardies et al., FW: REQUEST: Belgium - Meeting on 8/16 re Flaw Indications in Doel 3 Reactor Pressure Vessel. (8 page(s), 8/16/2012)
- ML13226A513 - Email P. Hiland to T. Lupold et al., FW: REQUEST: Belgium - Meeting on 8/16 re Flaw indications in Doel 3 Reactor Pressure Vessel. (7 page(s), 8/16/2012)
- ML13226A514 - Email R. Hardies to P. Hiland FW: Doel 3 RPV Working Meeting August 16: Handouts & Start-up of Working Groups. (82 page(s), 8/17/2012)
- ML13226A515 - Email R. Davis to S. Rosenberg, FW: RPV Stud Holes and ASME Code Questions. (3 page(s), 8/21/2012)
- ML13226A517 - Email T. Griesbach to J. Poehler, RE: EPRI Report on RV Fabrication. (1 page(s), 8/22/2012)
- ML13226A518 - Teleconference Call Memo. (2 page(s), 8/22/2012)
- ML13227A219 - Email R. Hardies to J. Poehler, FW: Potential Problem on the Reactor. (3 page(s), 8/23/2012)
- ML13227A220 - Email J. Poehler to T. Griesbach, RE: EPRI Report on RV Fabrication. (2 page(s), 8/23/2012)
- ML13227A221 - P. Hiland to M. Case, Subj: Research Assistance Request. (1 page(s), 8/27/2012)
- ML13227A222 - Email G. Stevens to R. Tregoning, Subj: ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 8/27/2012)
- ML13227A223 - Email D. Hills to T. Bilik et al., FW: ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 8/27/2012)
- ML13227A224 - Email K. Johnson to J. Dion, RE: Research Assistance Request. (2 page(s), 8/28/2012)
- ML13227A225 - Email J. Honcharik to A. Csontos et al., RE: ASME Code Meeting Report - Subgroup on Evaluation Standards. (8 page(s), 8/28/2012)
- ML13227A226 - Email M. Kirk to C. Nove, FW: Doel 3. (3 page(s), 8/29/2012)
- ML13227A227 - Email A. Csontos to J. Dion, RE: Research Assistance Request. (3 page(s), 9/5/2012)
- ML13227A228 - Memo M. Case to P. Hiland, Subj: Response to Research Assistance Request to Assess The Implications Of The Indications Discovered In The Doel 3 Reactor Pressure Vessel In Belgium (NRR-2012-005) (RAR). (4 page(s), 9/6/2012)
- ML13227A229 - Email F. Brown to D. Failla, Nucleonics Week. (13 page(s), 9/6/2012)
- ML13227A230 - Email R. Hardies to M. Cheok et al., FW: Doel 3 RPV Issue: Terms of Reference & Next meeting. (9 page(s), 9/6/2012)
- ML13227A231 - Email A. Csontos to G. Wilkowski et al., RE: North Anna Meeting. (1 page(s), 9/10/2012)
- ML13227A232 - Email A. Csontos to S. Richards et al., RE: Request for Approval of Foreign Travel to attend Doel Technical Work Groups. (2 page(s), 9/11/2012)
- ML13227A233 - Email A. Csontos to S. West FW: RES response to research assistance request NRR-2012-005. (3 page(s), 9/11/2012)
- ML13227A234 - Email A. Csontos to S. DePaula, FW: Research Assistance Request. (2 page(s), 9/12/2012)
- ML13227A235 - Email A. Csontos to R. Hardies, RE: Large NSSS Component Fabrication and Inspection. (2 page(s), 9/13/2012)
- ML13227A236 - Email A. Csontos to E. Hackett et al., RE: recent vessel flaw findings at Doel. (3 page(s), 9/13/2012)
- ML13227A237 - Email A. Csontos to M. Kirk et al., RE: PTS NUREG. (1 page(s), 9/14/2012)
- ML13227A238 - Email A. Csontos to M. Kirk, RE: Doel - request from FANC. (1 page(s), 9/14/2012)
- ML13227A240 - Email C. Basavaraju to G. Cheruvenki, RE: VY steam dryer cracking. (1 page(s), 9/17/2012)
- ML13227A241 - Email H. Gray to J. Trapp, FW: NRC Daily Notes for September 14, 2012. (2 page(s), 9/17/2012)
- ML13227A242 - Email A. Csontos to D. Dunn & G. Stevens, RE: Doel 3 Information. (3 page(s), 9/19/2012)
- ML13227A243 - Email A. Csontos to M. Kirk, RE: Tomorrow. (2 page(s), 9/19/2012)
- ML13228A048 - Email A. Csontos to M. Gavrilas et al., RE: Impressions of the LWRS workshops. (2 page(s), 9/20/2012)
- ML13228A049 - Email M. Kirk to R. Hardies et al., Subj: Date for Doel 3 International Committee meeting. (1 page(s), 9/21/2012)
- ML13228A050 - Email A. Csontos to M. Kirk, RE: Any chance someone form your branch could do the DE technical presentation at the monthly meeting next Monday? (1 page(s), 9/25/2012)
- ML13228A051 - Email A. Csontos to R. Hardies, RE: FOIA Question. (2 page(s), 9/26/2012)
- ML13228A052 - Email M. Kirk to J. Poehler, RE: Metallurgy of Hydrogen Flaking Document - for Doel 3 Meeting. (1 page(s), 9/26/2012)
- ML13228A053 - Email G. Kulesa to T. Lupold, RE: Region 1 Support. (1 page(s), 9/27/2012)
- ML13228A054 - Email A. Csontos to J. Dion, RE: Urgent Action: FW: Resent with Revised Due dates: ACTION: Operating Reactors Sequestration Exercise. (6 page(s), 9/28/2012)
- ML13228A055 - Email A. Csontos to C. Nove RE: today. (1 page(s), 10/4/2012)
- ML13228A056 - Email A. Csontos to E. Hackett et al., Subj: Sorry that I missed your phone call. If you still need some clarification on handling the Doel info, LMK (EOM). (1 page(s), 10/4/2012)
- ML13228A057 - Email from G. Oberson to B. Hanson, Subject: RE: CRDM NUREG. (4 page(s), 7/16/2012)
- ML13228A058 - Email R. Hardies to H. Gray RE: Newspaper opinion article RE reactor vessel cracks. (2 page(s), 10/4/2012)
- ML13228A059 - Email S. Rutenkroger to H. Gray RE: Newspaper opinion article RE reactor vessel cracks. (2 page(s), 10/4/2012)
- ML13228A060 - Email H. Gray to T. Lupold, FW: Newspaper opinion article RE reactor vessel cracks. (2 page(s), 10/4/2012)
- ML13228A061 - Email M. Kirk to C. Fairbanks, Subj: Doel Q and A's. (1 page(s), 10/4/2012)
- ML13228A063 - Email A. Csontos to M. Case & G. Stevens, RE: Doel Update. (2 page(s), 10/10/2012)
- ML13228A064 - Email A. Csontos to G. Stevens, RE: for your consideration. (2 page(s), 10/11/2012)
- ML13228A066 - NRC International Travel Trip Report. (7 page(s), 10/18/2012)
- ML13228A068 - Email A. Csontos to G. Stevens et al., RE: Please check the POW item. (1 page(s), 10/18/2012)
- ML13228A070 - NRC International Travel Trip Report. (17 page(s), 10/22/2012)
- ML13228A071 - NRC International Travel Trip Report. (17 page(s), 10/22/2012)
- ML13228A072 - Email A. Csontos to G. Stevens, RE: Q2-Q4 FY 13 International Travel due Oct 26. (4 page(s), 10/23/2012)
- ML13228A073 - Email A. Csontos to R. Hardies et al., RE: Friendly Reminder: Trip Report Due. (3 page(s), 10/23/2012)
- ML13228A074 - Email M. Anderson to C. Nove, RE: need help with IRSN terminology. (1 page(s), 10/23/2012)
- ML13228A075 - Email A. Csontos to M. Kirk et al., RE: Slides for Brian on Thursday. (2 page(s), 10/23/2012)
- ML13228A076 - Email A. Csontos to M. Kirk, RE; question on your edits. (3 page(s), 10/23/2012)
- ML13228A139 - Email A. Csontos to M. Kirk & G. Stevens, RE: Doel 3 Sharepoint Site Permissions Changed. (1 page(s), 10/23/2012)
- ML13228A140 - Email T. Lupold to J. Trapp, RE: Vessel Flaws. (1 page(s), 10/23/2012)
- ML13228A141 - Email A. Csontos to G. Stevens & M. Kirk, RE: Doel phone call tomorrow. (1 page(s), 10/24/2012)
- ML13228A142 - Email M. Kirk to J. Ramsey & G. Fehst, Subj: Doel 3 review board meeting. (2 page(s), 10/25/2012)
- ML13228A143 - RES Management Briefing Indications in the Doel 3 (Belgium) Reactor Pressure Vessel. (17 page(s), 10/25/2012)
- ML13228A144 - RES Management Briefing Indications in the DOEI 3 (Belgium) Reactor Pressure Vessel. (9 page(s), 10/25/2012)
- ML13228A145 - Email M. Kirk to Mark, FW: Doel 3 review board meeting. (2 page(s), 10/26/2012)
- ML13228A146 - Email M. Kirk to C. Nove & G. Stevens, RE: Nondestructive Examination of VB395 block. (2 page(s), 10/26/2012)
- ML13228A147 - Email M. Kirk to P. Labeau et al., Subj: some comments on Tractebel documents. (15 page(s), 10/30/2012)
- ML13228A148 - Email M. Kirk to G. Stevens, RE: Doel 3 Brief/Next Steps - RESCHEDULED (again) Due to Sandy. (1 page(s), 10/30/2012)