Home > NRC Library > ADAMS Public Documents
FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.
Accession Number: ML130080030
Date Released: Wednesday, January 16, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13008A029 - FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident. (3 page(s), 11/27/2012)
- ML13008A030 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report. Cover through Appendix A, Resumes and Qualifications A-37. (354 page(s), 10/23/2012)
- ML13008A032 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "Primary Plant Component Cooling Water Heat Exchanger". Pages 1 - 90. (91 page(s), 10/23/2012)
- ML13008A034 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "Boric Acid Transfer Pump". Pages 91 - 181. (91 page(s), 10/23/2012)
- ML13008A035 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWC), "Motor Control Center". Pages 182 - 270. (89 page(s), 10/23/2012)
- ML13008A036 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "AC Distribution Panel". Pages 271 - 360. (90 page(s), 10/23/2012)
- ML13008A037 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "4160V/480V Transformer TRANS-1-8N to Emergency Bus". Pages 361 - 439. (79 page(s), 10/23/2012)
- ML13008A038 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C Area Walk-by Checklists (AWCs), "#2 Battery Room". Pages 1 - 65. (66 page(s), 10/23/2012)
- ML13008A039 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C Area Walk-by Checklists (AWCs), "Emer. Swgr. Room Train A". Pages 66 - 134. (69 page(s), 10/23/2012)
- ML13008A040 - Beaver Valley Power Station Unit 1, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C Area Walk-by Checklists (AWCs), "Prim. AUX. BLDG 735'6". Pages 135 - 191. (62 page(s), 10/23/2012)
- ML13008A041 - Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report. Cover through A-40. (223 page(s), 10/31/2012)
- ML13008A042 - Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklits (SWCs), "Battery 2N". Pages 1 - 82. (83 page(s), 10/31/2012)
- ML13008A043 - Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "Purge Valve Isolation". Pages 83 - 161. (79 page(s), 10/31/2012)
- ML13008A044 - Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "BUS F1, Low Voltage Switchgear". Pages 162 - 240. (79 page(s), 10/31/2012)
- ML13008A045 - Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "SGI Level Switch SP9B6". Pages 241 - 318. (78 page(s), 10/31/2012)
- ML13008A046 - Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (SWCs), "Relief Valves SW 3963". Pages 319 - End. (61 page(s), 10/31/2012)
- ML13008A047 - Beaver Valley Power Station, Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C, Area Walk-by Checklists, Page C-1 through Sheet 78 of 123. (79 page(s), 10/31/2012)
- ML13008A048 - Beaver Valley Power Station, Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C, Area Walk-by Checklists, Sheet 79 of 123 through End. (92 page(s), 10/31/2012)
- ML13008A049 - Perry, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover through Appendix A, Resumes and Qualifications, Page A-36. (284 page(s), 9/28/2012)
- ML13008A050 - Perry, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 1 of 513 through Sheet 122 of 513. (123 page(s), 9/28/2012)
- ML13008A051 - Perry, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 123 of 513 through Sheet 247 of 513. (125 page(s), 9/28/2012)
- ML13008A052 - Perry, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 248 of 513 through Sheet 367 of 513. (120 page(s), 9/28/2012)
- ML13008A053 - Perry, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 368 of 513 through Sheet 481 of 513. (114 page(s), 9/28/2012)
- ML13008A054 - Perry, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 482 of 513 through Appendix C: Area Walk-by Checklists, Sheet 85 of 212. (118 page(s), 9/28/2012)
- ML13008A055 - Perry, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C: Area Walk-by Checklists, Sheet 86 of 212 through End. (129 page(s), 9/28/2012)
- ML13008A031 - Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover through Appendix A, Resumes and Qualifications, Page A-39. (194 page(s), 8/10/2012)
- ML13008A062 - Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Page B-1 through Sheet 120 of 416. (121 page(s), 8/10/2012)
- ML13008A063 - Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Sheet 121 of 461 through Sheet 243 of 461. (123 page(s), 8/10/2012)
- ML13008A064 - Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Sheet 244 of 461 through Sheet 363 of 461. (120 page(s), 8/10/2012)
- ML13008A065 - Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Sheet 364 of 461 through Appendix C, Area Walk-By Checklists, Sheet 20 of 139. (119 page(s), 8/10/2012)
- ML13008A061 - Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C, Area Walk-By Checklists, Sheet 21 of 139 through End. (127 page(s), 8/10/2012)