Home > NRC Library > ADAMS Public Documents
09/27/10 - 10/01/10, 10/25/10 - 10/29/10 Summary of NRC-RES/EPRI Fire PRA Course.
Accession Number: ML103070280
Date Released: Wednesday, November 3, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML103070284 - Memo from K. Hill to M. Salley Re: Summary of NRC-RES/EPRI Fire PRA Course. (3 page(s), 11/3/2010)
- ML103070288 - 09/27/10 - 10/01/10 Attendee List: NRC-RES/EPRI Fire PRA Course, Session 1. (3 page(s), 11/3/2010)
- ML103070294 - 10/25/10 - 10/29/10 Attendee List: NRC-RES/EPRI Fire PRA Course, Session 2. (3 page(s), 11/3/2010)
- ML102530294 - Basics of Nuclear Power Plant Probabilistic Risk Assessment. (81 page(s), 9/27/2010)
- ML102530300 - EPRI/RES Fire PRA Methodology: Circuit Analysis Basics. (16 page(s), 9/27/2010)
- ML102530301 - Typical Electrical Drawing Symbols and Conventions. (31 page(s), 9/27/2010)
- ML102530302 - EPRI/NRC-RES Fire PRA Methodology Definitions. (53 page(s), 9/27/2010)
- ML102560372 - Principles of Human Reliability Analysis (HRA). (142 page(s), 9/27/2010)
- ML102530304 - Presentation Schedule for Tuesday AM Introductory Session. (104 page(s), 9/27/2010)
- ML102530305 - EPRI/NRC-RES Fire PRA Methodology: Task 2 - Fire PRA Component Selection. (84 page(s), 9/27/2010)
- ML102530310 - EPRI/NRC-RES Fire PRA Methodology: Fire PRA Circuit Analysis Overview. (71 page(s), 9/27/2010)
- ML102530313 - EPRI/NRC-RES Fire PRA Methodology: Module III, Task 1: Plant Partitioning. (164 page(s), 9/27/2010)
- ML102560382 - EPRI/NRC-RES Fire PRA Methodology: Task 12 - Post-Fire HRA - Fire HRA Training Overview. (304 page(s), 9/27/2010)
- ML102530318 - EPRI/NRC-RES Fire PRA Methodology: Integration, Lessons Learned, and Insights. (12 page(s), 9/27/2010)