Web package for FOIA/PA-2010-0116
Accession Number: ML102910368
Date Released: Tuesday, October 19, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML100290385 - FOIA/PA-2010-0116 - Crystal River nuclear power plant, records related to the gap in the concrete containment (2 page(s), 1/28/2010)
- ML101040038 - FOIA/PA-2010-0116 - Resp 1 - Partial. (3 page(s), 4/9/2010)
- ML092960660 - Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274). (5 page(s), 10/27/2009)
- ML093020101 - 11/20/09 Notice of Meeting With Progress Energy to Provide Information on the Recently Identified Containment Concrete Delamination at Crystal River Unit 3. (4 page(s), 10/30/2009)
- ML093170606 - Press Release-II-09-063: NRC Schedules Public Meeting with Progress Energy to Discuss Crystal River Nuclear Plant Containment Issue. (2 page(s), 11/13/2009)
- ML093240292 - Crystal River, Unit 3, Containment Delamination Update. (30 page(s), 11/19/2009)
- ML093360229 - 11/20/2009 Summary of Meeting with Progress Energy on Crystal River Unit 3 Containment Building Concrete Delamination. (6 page(s), 12/4/2009)
- ML100200966 - Transcript of Meeting on Crystal River, Unit 3, Containment Concrete Delamination, 10 CFR 2.206, on January 7, 2010, Pages 1-32. (33 page(s), 1/7/2010)
- ML100270031 - Crystal Rive, Unit 3 - Submittal of Response to Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems," Response to a Request for Additional Information. (7 page(s), 1/25/2010)
- ML080660643 - Crystal River, Unit 3, Transmittal of 90-Day Inservice Inspection (ISI) Summary Report. (272 page(s), 3/4/2008)
- ML040430061 - Crystal River, Unit 3 - 90-Day Inservice Inspection (ISI) Summary Report. (145 page(s), 2/2/2004)
- ML060550264 - Crystal River Unit 3 - 90 Day Inservice Inspection (ISI) Summary Report. (277 page(s), 2/15/2006)
- ML003683430 - Crystal River Unit 3 - 90-Day Inservice Inspection (ISI) Summary Report (165 page(s), 2/9/2000)
- ML092810515 - Press Release-II-09-055: NRC to Begin Special Inspection at Crystal River Nuclear Plant. (2 page(s), 10/8/2009)
- ML010720278 - License Amendment Request 267, Revision 0 Revision to Improved Technical Specification 5.6.2.20, Containment Leakage Rate Testing Program". (19 page(s), 3/7/2001)
- ML012190219 - Crystal River, Unit 3, License Amendment, Allowing a One Time Extension of the Containment ILRT From 10 to 15 Years (13 page(s), 8/30/2001)
- ML020090673 - IR 05000289/2001-012, on 10/29/2001 through 11/29/2001; AmerGen Energy Company, LLC (AmerGen), Three Mile Island Station, Unit 1, Special Inspection Team. No violations noted. (16 page(s), 1/9/2002)
- ML092860813 - Special Inspection Charter to Evaluate Crystal River Containment Building. (4 page(s), 10/13/2009)
- ML083370411 - Inspection Procedure 93812, "Special Inspection." (8 page(s), 3/23/2009)
- ML063120413 - IR 05000341/2006015; 08/28/06 - 09/26/06; Fermi Power Plant, Unit 2; Special Inspection for the declaration of inoperability of all four emergency diesel generators on August 17, 2006. (33 page(s), 11/7/2006)
- ML101060319 - FOIA/PA-2010-0116 - Resp 2 - Partial. (3 page(s), 4/9/2010)
- ML101060327 - Status Update Regarding the Crystal River Unit 3 Steam Generator Replacement Outage. (1 page(s), 4/9/2010)
- ML101060328 - Talking Points. (1 page(s), 4/9/2010)
- ML101060329 - Email from R. Kuntz, NRR to B. Mozafari, NRR et al. FW: FYI - STATUS UPDATE: Crystal River Containment Crack. (2 page(s), 10/7/2009)
- ML101060330 - Email from J. Paige, NRR to D. Skeen, NRR et al., Outcome from Crystal River Teleconference RE Containment Crack. (2 page(s), 10/8/2009)
- ML101060331 - Email from A. Sheikh, NRR to B. Lehman, NRR et al., RE: CR3 Containment Crack. (2 page(s), 10/8/2009)
- ML101060333 - Email from J. Dozier, NRR to NRRDLRRER1 Distribution, et al., FW: NRC to Begin Special Inspection at Crystal River Nuclear Plant. (3 page(s), 10/8/2009)
- ML101060334 - Email from D. Skeen, NRR to M. Khanna, NRR RE: Summary of October 8 Meeting with Chairman on CR3 Containment Delamination.word.doc. (2 page(s), 10/8/2009)
- ML101060335 - Email from R. Kuntz, NRR to R. Auluck, NRR FW: Crystal River 3 Reactor Building Dome Delamination December 10, 1976. (1 page(s), 10/15/2009)
- ML101060336 - Email from F. Saba, NRR to M. Khanna, NRR et al., FW: Final Report on Crystal River Dome Delamination 1976. (2 page(s), 10/19/2009)
- ML101060337 - Email from R. Kuntz, NRR to R. Auluck, NRR et al., FW: Heads up: CR3 Public Meeting Request - DC. (1 page(s), 10/23/2009)
- ML101060326 - Email from R. Kuntz, NRR to M. Heath, NRR on DRAFT Request for Information Re: Containment Delamination RAI1. (4 page(s), 10/26/2009)
- ML101060338 - Email from R. Kuntz, NRR to M. Khanna, NRR on CR-3 LTA RAI on Containment OpE. (1 page(s), 10/27/2009)
- ML101060339 - Email from J. Dozier, NRR to NRRDLRRER1 Distribution et al., FW: OpE Item on Crystal River Containment - Update. (1 page(s), 10/27/2009)
- ML101060340 - Email from R. Kuntz, NRR to M. Heath, NRR on Formal RAI RE: Containment OpE. (1 page(s), 10/28/2009)
- ML101060341 - Email from F. Saba, NRR to J. Giitter, NRR et al., Crystal River Status. (1 page(s), 10/30/2009)
- ML101060342 - Email from F. Saba, NRR to T. Orf, NRR FW: Summary of October 19th Conference Call with SIT on Crystal River 3 Containment Delamination Issue. (2 page(s), 10/30/2009)
- ML101060343 - Email from F. Saba, NRR to M. Khanna, NRR et al., FYI: Progress Energy Releases Schedule for CR3 Return to Service. (1 page(s), 1/26/2010)
- ML101060344 - E-mail from Saba to Khanna et al., Request for Turkey Point Report on Delamination. (2 page(s), 10/19/2009)
- ML101060345 - Event Number 45416, Crystal River, Regarding Discovery of a Containment Separation. (1 page(s), 10/7/2009)
- ML101060346 - Crystal River Unit #3 Containment Delamination Update. (83 page(s), 11/20/2009)
- ML101060347 - 5.2.2.4.4. Quality Control and Nondestructive Testing. (3 page(s), 4/9/2010)
- ML101170321 - FOIA/PA-2010-0116 - Resp 3 - Partial. (9 page(s), 4/16/2010)
- ML101170323 - E-mail from Chou to Franke, Crystal River. (1 page(s), 10/5/2009)
- ML101170324 - E-Mail from O'Donohue to Masters, Pictures of CR3 Concrete Crack. (2 page(s), 10/6/2009)
- ML101170325 - E-Mail from ODonohue to Masters, Crystal River Containment Crack. (1 page(s), 10/6/2009)
- ML101170326 - E-Mail from Carrion to Blake, Crystal River Containment Crack. (1 page(s), 10/6/2009)
- ML101170327 - E-Mail from Carrion to Franke, Crystal River Containment Crack. (1 page(s), 10/6/2009)
- ML101170328 - E-Mail from Collins to Sykes, Thought on the Containment at Crystal River. (1 page(s), 10/6/2009)
- ML101170329 - E-Mail from Carrion to Chou, Crystal River U3 Containment Cracks. (1 page(s), 10/7/2009)
- ML101170330 - E-Mail from Franke to Sykes, Crystal River Talking Points. (1 page(s), 10/7/2009)
- ML101170331 - E-Mail from Sykes to Franke, Crystal River, Unit 3 Containment Cracks. (2 page(s), 10/7/2009)
- ML101170371 - E-Mail from Christensen to Kennedy, Establishing a Special Inspection Team for Crystal River. (1 page(s), 10/8/2009)
- ML101170372 - E-Mail from Fletcher to Ninh, Crystal River SI Charter. (4 page(s), 10/8/2009)
- ML101170373 - E-Mail from Doutt to Kuntz, Crystal River SIT Status Update. (2 page(s), 10/19/2009)
- ML101170374 - E-Mail from Carrion to Franke, Draft Crystal River SIT Charter. (1 page(s), 10/9/2009)
- ML101170375 - E-Mail from Carrion to Franke, Draft Crystal River SIT Charter. (1 page(s), 10/9/2009)
- ML101170376 - E-Mail from Carrion to Kennedy, Crystal River SI Charter. (1 page(s), 10/9/2009)
- ML101170377 - E-Mail from Carrion to Morrison, Crystal River SI Charter. (1 page(s), 10/9/2009)
- ML101170379 - E-Mail from Carrion to Ninh, Crystal River 3 Special Inspection Report Number 2009-007. (1 page(s), 10/9/2009)
- ML101170380 - E-Mail from Carrion to Lake, Documents Reviewed During First Week of SIT Activities. (3 page(s), 10/19/2009)
- ML101170381 - E-Mail from Franke to Sengupta, CR3. (1 page(s), 10/9/2009)
- ML101170385 - E-Mail from Franke to Sykes, 2009 Oct 13 - Containment - NRC SIT Briefing. (9 page(s), 10/13/2009)
- ML101170386 - E-Mail from Morrison to Reyes, Special Inspection Charter to Evaluate Crystal River Containment Building. (1 page(s), 10/13/2009)
- ML101170387 - E-Mail from Kennedy to Christensen, Crystal River - High Level Update. (1 page(s), 10/15/2009)
- ML101170389 - E-Mail from Chou to Franke, Questions on Containment. (1 page(s), 10/16/2009)
- ML101170390 - E-Mail from Chou to Franke, Turkey Point Contamination Wall Cut During Reactor Head Replacement in 2004 & 2005. (1 page(s), 10/16/2009)
- ML101170533 - E-Mail from Carrion re Lou's Phone Number at Crystal River. (1 page(s), 10/19/2009)
- ML101170534 - E-Mail from Carrion re SIT Status Call. (1 page(s), 10/19/2009)
- ML101170536 - E-Mail from Carrion to Lake, Electronic Version of Debrief Outline. (2 page(s), 10/20/2009)
- ML101170537 - E-Mail from Carrion to Collins re Lou's Phone Number at Crystal River. (1 page(s), 10/20/2009)
- ML101170538 - E-Mail from Carrion to Masters, Crystal River 3 Status Update. (1 page(s), 10/25/2009)
- ML101170539 - E-Mail from Carrion to Franke re NDE Procedure. (1 page(s), 10/26/2009)
- ML101170540 - E-Mail from Carrion re Status Meeting Conducted by Garry Miller. (1 page(s), 10/27/2009)
- ML101170541 - E-Mail from Franke to Lake, Special Inspection Charter to Evaluate Crystal River Containment Building. (4 page(s), 10/27/2009)
- ML101170542 - E-Mail from Franke to Lake, Crystal River 3 Containment Delamination Update. (21 page(s), 10/27/2009)
- ML101170543 - E-Mail from Carrion re Status of CR3 NDE. (1 page(s), 10/28/2009)
- ML101170544 - E-Mail from Carrion to Franke re Status Meeting Conducted by Garry Miller. (1 page(s), 10/29/2009)
- ML101170545 - E-mail from Carrion re SIT Status Meeting Conducted by Garry Miller, (Oct 30 2009). (1 page(s), 10/30/2009)
- ML101170546 - E-mail from Christensen to Franke re Crystal River Pics. (1 page(s), 11/2/2009)
- ML101170547 - E-Mail from Franke to Lake, Question re-Statement in CR3 Talking Points on Concrete Issue. (1 page(s), 11/3/2009)
- ML101170548 - E-Mail from Lake to Masters, FSAR Section 5.2. (2 page(s), 11/3/2009)
- ML101170608 - E-Mail from Lake to Masters, FSAR Section 5.2. (1 page(s), 11/3/2009)
- ML101170609 - E-Mail from Carrion to Lake, Morning Status. (1 page(s), 11/3/2009)
- ML101170610 - E-Mail from Carrion to Franke, Status. (1 page(s), 11/3/2009)
- ML101170611 - E-Mail from Masters to Davis re CR3 SIT Update. (1 page(s), 11/4/2009)
- ML101170613 - E-Mail from Carrion to Thomas, Morning Status. (2 page(s), 11/4/2009)
- ML101170614 - E-Mail from Chou to Franke, Crystal River Containment Wall Concrete Delamination. (1 page(s), 11/4/2009)
- ML101170615 - E-Mail from Carrion re CR3 Status. (1 page(s), 11/4/2009)
- ML101170616 - E-Mail from Masters to Carrion, Observations from Core Boring This Afternoon. (1 page(s), 11/5/2009)
- ML101170617 - E-Mail from Masters re CR3 SIT Update. (2 page(s), 11/5/2009)
- ML101170618 - E-Mail from Carrion to Franke, CR3 SIT Status. (1 page(s), 11/5/2009)
- ML101170671 - E-Mail from Carrion to Franke, CR3 SIT Status. (1 page(s), 11/5/2009)
- ML101170673 - E-Mail from Carrion to Franke, Crystal River Containment Wall Opening Core Boring Pictures. (2 page(s), 11/5/2009)
- ML101170675 - E-Mail from Carrion to Masters, Observations from Core Boring This Afternoon. (2 page(s), 11/6/2009)
- ML101170676 - E-Mail from Masters to Carrion, Observations from Core Boring this Afternoon. (2 page(s), 11/9/2009)
- ML101170677 - E-Mail from Plisco to Masters, CR3 SIT Update. (2 page(s), 11/9/2009)
- ML101170678 - E-Mail from Franke to Coursey, Special Inspection Charter to Evaluate Crystal River Containment Building. (4 page(s), 11/9/2009)
- ML101180309 - E-Mail from Carrion to Franke, CR3 SIT Status. (2 page(s), 11/10/2009)
- ML101170679 - E-Mail from Franke to Lake, SIT Debrief Template. (1 page(s), 11/10/2009)
- ML101170680 - E-Mail from Franke to Lake, Crystal River SIT Exit. (1 page(s), 11/10/2009)
- ML101170681 - E-Mail from Carrion to Franke, CR3 SIT Status (November 11, 2009). (1 page(s), 11/11/2009)
- ML101170730 - E-Mail from Carrion to Franke, CR3 SIT Status (10 Nov 2009). (2 page(s), 11/11/2009)
- ML101170731 - E-Mail from Franke to Lake, Crystal River SIT. (1 page(s), 11/11/2009)
- ML101170732 - E-Mail from Carrion to Franke, CR3 SIT Status (November 12, 2009). (1 page(s), 11/12/2009)
- ML101170733 - E-Mail from Carrion to Franke, CR3 SIT Status. (1 page(s), 11/13/2009)
- ML101170734 - E-Mail from Carrion to Lake, Background.doc. (2 page(s), 11/16/2009)
- ML101170735 - E-Mail from Masters to Lake, SIT Experience for Mr. Ryes. (2 page(s), 11/16/2009)
- ML101170736 - Handwritten Notes Re: Crystal River. (2 page(s), 4/16/2010)
- ML101170737 - E-Mail from Chou to Sabisch, Concrete Curing Time Between the New Concrete Pour and the Application of Tensioning. (1 page(s), 11/16/2009)
- ML101170738 - E-Mail from Lake to Franke, SIT Experience for Mr. Ryes. (2 page(s), 11/17/2009)
- ML101170739 - E-Mail from Carrion to Lake, SIT Status Call. (1 page(s), 11/18/2009)
- ML101170784 - E-Mail from Franke to Khanna, Public Meeting with Progress - SIT Talking Points/Notes. (3 page(s), 11/19/2009)
- ML101170786 - E-Mail from Carrion to Lake, Charter #7. (3 page(s), 11/23/2009)
- ML101170787 - E-Mail from Carrion to Lake, Charter Item #1. (3 page(s), 11/23/2009)
- ML101170788 - E-Mail from Carrion to Chou, Nov 20 CR3 Presentation. (1 page(s), 11/24/2009)
- ML101170789 - E-Mail from Carrion to Lake, 2009 Nov 23 - Containment Unfolded Graphics. (1 page(s), 11/24/2009)
- ML101170790 - E-Mail from Chou to Franke, New Concrete Pour Schedule for Crystal River. (2 page(s), 11/24/2009)
- ML101170791 - E-Mail from Lake to Herrin, Changes to Crystal River SIT Exit. (1 page(s), 11/24/2009)
- ML101170792 - E-Mail from Chou to Franke, Curing Time for the Containment Wall Opening With Tendons. (2 page(s), 11/24/2009)
- ML101170793 - E-Mail from Carrion to Williams, Draft Refute 4.2 for Review. (1 page(s), 11/30/2009)
- ML101170794 - E-Mail from Carrion to Williams, Draft Refute 4.2 for Review. (1 page(s), 11/30/2009)
- ML101170817 - E-Mail from Carrion to Thomas, Question Clarification. (1 page(s), 11/30/2009)
- ML101170818 - E-Mail from Lake to Chou, Monday NCRs. (2 page(s), 12/2/2009)
- ML101170819 - Root Cause Analysis - PII Metrics as of Dec 3rd 2009. (1 page(s), 12/3/2009)
- ML101170820 - E-Mail from Lake to Dan naus, Clarification on Vertical Tendons. (1 page(s), 12/4/2009)
- ML101170821 - E-Mail from Lake to Masters, Update on Crystal River. (1 page(s), 12/14/2009)
- ML101180258 - E-Mail from Chou to Lake, Proposal for the Inspection of Crystal River 3 Containment Wall Opening Closure and Repair of Wall Delamination. (1 page(s), 12/14/2009)
- ML101180259 - E-Mail from Franke, Additional Resources Needed for Crystal River SIT. (1 page(s), 12/17/2009)
- ML101180260 - E-Mail from Williams to Franke, CR Containment Comm Plan Update. (2 page(s), 12/21/2009)
- ML101180261 - E-Mail from Chou to Franke, NRC Activities During Repair CR Containment. (2 page(s), 12/21/2009)
- ML101180262 - Root Cause Analysis - PII Metrics as of Dec 28th 2009. (2 page(s), 12/28/2009)
- ML101180263 - E-Mail from Calloway to Ninh, Crystal River 2009005 Inspection Input. (18 page(s), 1/5/2010)
- ML101180264 - E-Mail from Kennedy to Franke, Crystal River De-lamination Project Presentations. (1 page(s), 1/6/2010)
- ML101180266 - E-Mail from Kennedy to Franke, DD Counterpart Meeting with NRR and NSIR. (1 page(s), 1/11/2010)
- ML101180267 - E-Mail from Williams to Franke, Crystal River Communications Team. (1 page(s), 1/7/2010)
- ML101180268 - E-Mail from Lake to Dan naus, Status of NRC Questions. (1 page(s), 1/15/2010)
- ML101180269 - E-Mail from Christensen to R2DRS, FOIA on Crystal River Containment. (1 page(s), 1/20/2010)
- ML101180270 - E-Mail from Ogle to Masters, Crystal River Containment Crack. (1 page(s), 1/20/2010)
- ML101180292 - E-Mail from Ogle to-Masters, News Release 11-09-055 Crystal River Special Inspection. (3 page(s), 1/20/2010)
- ML101180271 - E-Mail from Ogle to Masters, Talking Points for Crystal River Issue. (2 page(s), 1/20/2010)
- ML101180272 - E-Mail from Ogle to Masters, Crystal River. (1 page(s), 1/20/2010)
- ML101180311 - E-Mail from Ogle to Masters, Crystal River SIT Support. (1 page(s), 1/20/2010)
- ML101180312 - E-Mail from Ogle to Masters, Chairman's Periodic - Top 5 Topics. (1 page(s), 1/20/2010)
- ML101180313 - E-Mail from Kuntz to Craver, Crystal River Containment Repair Plan Update. (38 page(s), 3/19/2010)
- ML101180314 - E-Mail from Chou to Morrissey, CTR Level II Schedule. (2 page(s), 1/21/2010)
- ML101180315 - E-Mail from Lake to Franke, NRC Issue. (1 page(s), 1/22/2010)
- ML101180316 - E-Mail from Carrion to Lake, CR SIT NRC Questions. (1 page(s), 1/22/2010)
- ML101180317 - E-Mail from Chou to Carrion, NRC Issue. (2 page(s), 1/22/2010)
- ML101180318 - E-Mail form Chou to Franke, Crystal River 3 Concrete Repair Level 2 schedule. (1 page(s), 1/25/2010)
- ML101180319 - E-Mail from Chou to Powell, New NCR. (1 page(s), 1/25/2010)
- ML101180320 - E-Mail from Carrion to Lake, Recent High Level Schedule Info. (1 page(s), 1/26/2010)
- ML101190439 - E-Mail from Sykes to Wert, CR3 Concrete Delamination Repair Schedule. (1 page(s), 1/26/2010)
- ML101190440 - E-Mail from Lake to Masters, New NCR. (3 page(s), 1/27/2010)
- ML101190441 - E-Mail from Khanna to Khanna, Crystal River Information. (3 page(s), 10/8/2009)
- ML101190442 - E-Mail from Franke to R2DRSEB3, Talking Points for Crystal River issue. (4 page(s), 10/9/2009)
- ML101190443 - E-Mail from Franke to Fletcher, EB3 and SIT update. (1 page(s), 10/9/2009)
- ML101190444 - E-Mail from Chou to Zeller, Questions re: Summer Past Containment Concrete Work Activities. (1 page(s), 10/16/2009)
- ML101190445 - E-Mail from Carrion to Carrion, SIT Status Call. (1 page(s), 10/19/2009)
- ML101190446 - E-Mail from Sykes to Boyce, Telecon w/Progress Energy to Discuss Status of Activities at CR3S-November 5, 2009, 2pm. (1 page(s), 10/16/2009)
- ML101190447 - E-Mail from Lake to Khanna, CR-3 Reactor Building Design Model. (1 page(s), 11/11/2009)
- ML101190448 - E-Mail from Carrion to Lake, Background.doc. (2 page(s), 11/16/2009)
- ML101190449 - E-Mail from Chou to Herrin, SGR Inspection. (1 page(s), 1/20/2010)
- ML101190450 - E-Mail from Carrion to Lake, Process for NRC review of Root Cause Info. (2 page(s), 11/23/2009)
- ML102040271 - FOIA/PA-2010-0116 - Resp 4 - Partial. (7 page(s), 7/21/2010)
- ML102040272 - Meeting summary of Meeting with Chairman Jaczko on Delamination of Containment Domes. (1 page(s), 10/8/2009)
- ML102040273 - Email from Sykes, Martin to Morrissey, Thomas, Subject: FW: Teleconference. (1 page(s), 10/8/2009)
- ML102040274 - Email from Sykes, Martin to Morrissey, Thomas, Subject: RE: Teleconference. (2 page(s), 10/8/2009)
- ML102040275 - Email from Reyes, Luis to Grobe, Jack, cc Munday, Joel; Sykes, Marvin; Franke, Mark; Subject: RE: Support to Special Inspection at CR. (1 page(s), 10/8/2009)
- ML102040276 - Email from Khanna, Meena to Grobe, Jack; Hiland, Patrick; Skeen, David; Subject: Summary of Meeting with Chairman Jaczko - Crystal River 3 Containment Delamination Issue. (2 page(s), 10/8/2009)
- ML102040277 - Email from Morrissey, Thomas to Chou, Rich; Michel, Eric; Alen, Alejandro; Reyes, Rogerio; Subject: FW: Photos. (1 page(s), 10/8/2009)
- ML102040278 - Email from Carrion, Robert to Rivera-Ortiz, Joel; Subject: FW: Crystal River U3 Containment Cracks. (1 page(s), 10/8/2009)
- ML102040279 - Email from Carrion, Robert to Khanna, Meena; Franke, Mark; Lake, Louis; cc Thomas, George; Subject: RE: Crystal River SIT Entrance. (1 page(s), 10/9/2009)
- ML102040280 - Email from Carrion, Robert to Franke, Mark; Subject: re: Authorization and RFP for a New ORNL Contract: J-4289, "Crystal River 3 Special Inspection". (2 page(s), 10/10/2009)
- ML102040503 - Email from Saba, Farideh to Bernardo, Robert; Kuntz, Robert; Subject: FYI: Special Inspection Charter to Evaluate Crystal River Containment Building. (1 page(s), 10/14/2009)
- ML102040504 - Email from Carrion, Robert to Anthony.masters@nrc.com; Subject: FW: Pictures. (1 page(s), 10/14/2009)
- ML102040505 - Email from Hamman, Jeffrey to Saba, Farideh; Khanna, Meena; Farzam, Farhad; Manoly, Kamal; Sykes, Marvin; Lake, Louis; Kuntz, Robert; Subject: RE: Crystal River 3 Reactor Dome Delamination December 10, 1976. (1 page(s), 10/15/2009)
- ML102040506 - Email from Carrion, Robert to Chou, Rich; 10:43 AM; Subject: FW: Scanned Document. (1 page(s), 10/19/2009)
- ML102040507 - Email from Carrion, Robert to Chou, Rich; 10:44 AM; Subject: FW: Scanned Document. (1 page(s), 10/19/2009)
- ML102040508 - Email from Carrion, Robert to Chou, Rich; 10:45 AM; Subject: FW: Scanned Document. (1 page(s), 10/19/2009)
- ML102040509 - Email from Carrion, Robert to Chou, Rich; 10:47 AM; Subject: FW: Scanned Document. (1 page(s), 10/19/2009)
- ML102040510 - Email from Franke, Mark to Wert, Leonard; RE: INFO: Crystal River Containment Wall. (2 page(s), 10/21/2009)
- ML102040511 - Email from Franke, Mark to Kennedy, Kriss; Re: Heads Up: CR3 Public Meeting Request - DC. (1 page(s), 10/23/2009)
- ML102040512 - Email from Franke, Mark to Saba, Farideh; cc Carrion, Robert; Khanna, Meena; Chan, Terence; Lake, Louis; Crystal River NDE Plan. (1 page(s), 10/26/2009)
- ML102070339 - Email from Carrion, Robert to Lake, Louis; Franke, Mark; Draft of Core Drilling Plan. (1 page(s), 10/26/2009)
- ML102070340 - Email from Carrion, Robert to Terrence.chan@nrc.gov; FW: Concrete. (1 page(s), 10/26/2009)
- ML102070341 - Email from Saba, Farideh to Franke, Mark; Chan, Terrence; Khanna, Meena; Farza, Farhad; Rezai, Ali; cc Boyce, Tom (NRR); Lake, Louis; Sykes, Marvin; Page, Jason; RE: from PITA on 10.29/09 for Crystal River Containment. (2 page(s), 10/29/2009)
- ML102070342 - Email from Saba, Farideh to Franke, Mark; RE: ML0930201010.doc. (2 page(s), 10/30/2009)
- ML102070343 - Email from Franke, Mark to Saba, Farideh; RE: Crystal River RB Delamination. (1 page(s), 10/30/2009)
- ML102070344 - Email from Blechman, Paula to PMNS Resource; et al; Forthcoming Meeting with Progress Energy, Friday, November 20, 2009. (1 page(s), 11/2/2009)
- ML102070345 - Email from Masters, Anthony to Thomas, George; FW: CR3 Status. (1 page(s), 11/4/2009)
- ML102070346 - Email from Carrion, Robert to Christensen, Harold; louis.lake@nrc.com; cc Masters, Anthony; CR3 Status. (1 page(s), 11/4/2009)
- ML102070347 - Email from Chou, Rich to Franke, Mark; cc Sykes, Marvin; Ninh, Son; Khanna, Meena; Morriessey, Thomas; Reyes, Rogerio; Lake, Louis; Chou, Rich; FW: Crystal River Containment Wall Opening Core Boring Pictures. (2 page(s), 11/5/2009)
- ML102070348 - Email from Grenier, Bernard to Thomas, George; cc Khanna, Meena; Manoly, Kamal; Franke, Mark; FW: MSLR J-4322 - "Crystal River Unit 3 Containment Concrete Special Inspection." (1 page(s), 11/5/2009)
- ML102080064 - Email from Carrion, Robert to Franke, Mark; Lake, Louis; Requested Info by NRR. (1 page(s), 11/5/2009)
- ML102080065 - Email from Khanna, Meena to Franke, Mark; RE: SIT Nov 20 Meeting and Exit. (2 page(s), 11/9/2009)
- ML102080066 - Email from Masters, Anthony to Carrion, Robert; Dan Naus; Lake, Louis; Thomas, George; FW: Additional Questions. (2 page(s), 11/10/2009)
- ML102080067 - Email from Orf, Tracy to Lake, Louis; cc Khanna, Meena; Containment Liner Condition. (1 page(s), 11/13/2009)
- ML102080068 - E-mail from Carrion, Robert to Thomas, George; Re: MacTec Petrographic Report. (1 page(s), 11/16/2009)
- ML102080069 - E-mail from Saba, Farideh to Leeds, Eric; Boger, Bruce; Grobe, Jack; cc Boyce, Tom (NRR); et al; Subject: FYI: November 20 Crystal River Public Meeting. (1 page(s), 11/16/2009)
- ML102080070 - E-mail from Thomas, George to Lake, Louis; Subject: RE: Gary's Presentation to CR3 Plant Nuclear Safety Committee (PNSC). (1 page(s), 11/16/2009)
- ML102080071 - E-mail from Naus, Dan J. to Lake, Louis; Subject: info. (1 page(s), 11/16/2009)
- ML102080072 - E-mail from Franke, Mark to Kennedy, Kriss; cc McCree, Victor; et al; Subject: Crystal River Containment Repair Plan Update. (1 page(s), 11/17/2009)
- ML102080073 - E-mail from Saba, Farideh to Franke, Mark; Subject: RE: CR-3 November 20th Meeting. (2 page(s), 11/17/2009)
- ML102080095 - E-mail from Khanna, Meena to Reyes, Luis; Leeds, Eric; cc Hiland, Patrick; et al; Subject: Issue. (2 page(s), 11/19/2009)
- ML102080096 - E-mail from Kuntz, Robert to Lee, Samson; Wrona, David; Holian, Brian; Sheikh, Abdul; Auluck, Rajender; Lehman, Bryce; Subject: FW: Revised Final CR Presentation. (2 page(s), 11/23/2009)
- ML102080098 - E-mail from Thomas, George to Lake, Louis; cc Khanna, Meena; Farzam Farhad; Subject: Request for a Follow-up Conf. Call with PE and MPR on Design Basis Analysis. (1 page(s), 11/23/2009)
- ML102080099 - E-mail from Lake, Louis to Rezai, Ali; cc Chan, Terence; Franke, Mark; No Subject. (1 page(s), 11/24/2009)
- ML102080100 - E-mail from Franke, Mark to Khanna, Meena; Subject: RE: Request for Support with Regulatory Info Conference in March 2010. (2 page(s), 12/1/2009)
- ML102080101 - E-mail from Lake, Louis to Dan naus; Masters, Anthony; Carrion, Robert; Thomas, George; cc Franke, Mark; Subject: Update from CR. (1 page(s), 12/2/2009)
- ML102080102 - E-mail from Thomas, George to Lake, Louis; Carrion, Robert; Masters Anthony; Dan naus; Subject: FW: Updated CR3 Root Cause Chart. (1 page(s), 12/8/2009)
- ML102080103 - E-mail from Caponiti, Kathleen to RidsNrrDorlLpl2-2 Resource; et al; Subject: Crystal River Unit 3 Nuclear Generating Plant- Summary of November 20, 2009, Meeting with PGN Regarding the Crystal River Unit 3 Containment Building Concrete Delamination... (1 page(s), 12/10/2009)
- ML102080104 - E-mail from Franke, Mark to Lake, Louis; Subject: Re:G20090690: Crystal River 2.206 Petition (Seeking Your Support). (66 page(s), 12/11/2009)
- ML102080105 - E-mail from Saba, Farideh to Kuntz, Robert; Bernardo, Robert; Subject: FYI: CR3 Root Cause Information. (1 page(s), 12/15/2009)
- ML102090385 - E-mail from Khanna, Meena to Lake, Louis; cc Thomas, George; Farzam, Farhad; Franke, Mark; Subject: Re: Additional Resources Needed for Crystal River SIT. (1 page(s), 12/17/2009)
- ML102090386 - Email from Saba, Farideh to Mensah, Tanya; et al; Subject: RE: PRB Opening Remarks. (3 page(s), 1/7/2010)
- ML102090387 - Email from Saba, Farideh to Blount, Tom; et al; cc Boyce, Tom (NRR); Mozafari, Brenda; Paige, Jason; Orf, Tracy; Rosenberg, Stacey; Lupold, Timothy; Subject: FYI. (39 page(s), 1/7/2010)
- ML102090388 - Email from Franke, Mark to Lake, Louis; Subject: RE: Crystal River SIT. (1 page(s), 1/8/2010)
- ML102090389 - Email from Mensah, Tanya to Saba, Farideh, et al; Subject: RE: Transcript for 01/07/10 Meeting/Conference Call. (2 page(s), 1/11/2010)
- ML102090390 - Email from Franke, Mark to Cauffman, Christopher; Subject: RE: Crystal River SIT (Containment). (1 page(s), 1/12/2010)
- ML102090391 - Email-from Saba, Farideh to Mensah, Tanya, et al; Subject: Crystal River 2.206 Regarding Mr. Thomas Saporito Petition Request for Containment Issue at CR-3. (39 page(s), 1/15/2010)
- ML102090392 - Email from Lake, Louis to Masters, Anthony; Subject: RE: Crystal River. (3 page(s), 1/20/2010)
- ML102090393 - Email from Ogle, Chuck to Masters, Anthony; Subject: FW: New OpE COMM Posting - Crystal River Containment Crack. (2 page(s), 1/20/2010)
- ML102090394 - Email from Carrion, Robert to Thomas, George; Subject: RE: CR SIT NRC Questions. (2 page(s), 1/25/2010)
- ML102090395 - Email from Sykes, Marvin to Wert, Leonard; Munday, Joel; Subject: Progress Energy Releases Schedule for CR3 Return to Service. (2 page(s), 1/25/2010)
- ML102090396 - Email from Saba, Farideh to Khanna, Meena; Lupold, Timothy; Farzam, Farhad; Thomas, George; Rezai, Aii; Orf, Tracy; Kuntz, Robert; Bernardo, Robert; Subject: OUO - CR3 Concrete Delamination Repair Schedule - OUO. (1 page(s), 1/26/2010)
- ML102090397 - Email from Mensah, Tanya to Saba, Farideh, et al; Subject: RE: PIs. Review: Draft G20090690. (2 page(s), 1/26/2010)
- ML102090398 - Email from Thomas, George to Lake, Louis; Subject: FW: CR SIT NRC Questions. (1 page(s), 1/26/2010)
- ML102090399 - Email from Franke, Mark to Sykes, Marvin; Subject: RE: Pis. Review: Draft G20090690. (2 page(s), 1/27/2010)
- ML102090400 - Email from Sabah Farideh to Mensah, Tanya, et al; Subject: G20090690-2.206 Petition Request. (1 page(s), 1/27/2010)
- ML102090401 - Email from Khanna, Meena to Lake, Louis; Subject: RE: Crystal River Unit 3 Containment Delamination Issue - NDE Testing. (2 page(s), 1/31/2010)
- ML102090402 - Summary of Petition Review Board Discussion with Petitioner Thomas Saporito, 2.206 Petition G20090690. (4 page(s), 7/21/2010)
- ML102180274 - FOIA/PA-2010-0116 - Resp 5 - Partial. (14 page(s), 8/4/2010)
- ML102180279 - E-mail from Alen to Lizardi, CR3 Containment Hydro-blasting. (1 page(s), 10/2/2009)
- ML102180280 - E-Mail from Morrissey to Reyes, Pictures Hydro Demolition and RB Roof - Discussing Status of Outage Activities. (1 page(s), 10/2/2009)
- ML102180281 - E-Mail from Morrissey to Alen, FYI. (1 page(s), 10/2/2009)
- ML102180290 - E-Mail from Chou to Franke, Crystal River U3 Containment Cracks. (1 page(s), 10/6/2009)
- ML102180282 - E-Mail from Wert to Munday, Crystal River Containment Crack. (1 page(s), 10/6/2009)
- ML102180283 - E-Mail from Reyes to Sykes, CR3 Containment. (1 page(s), 10/7/2009)
- ML102180284 - E-Mail from Alen to Sykes, Containment Wall X-section. (1 page(s), 10/7/2009)
- ML102180285 - E-Mail from Dozier to NRR DLR RER1 Distribution et al., Open Item on Crystal River Containment - Update. (3 page(s), 10/8/2009)
- ML102180286 - E-Mail from Sykes to Franke, Meeting with the Chairman re: Crystal River. (2 page(s), 10/8/2009)
- ML102180344 - E-Mail from Carrion to Ninh, Crystal River SIT. (2 page(s), 10/9/2009)
- ML102180345 - E-Mail from Hiland to Sykes, Prestressed Concrete Containment Buildings. (1 page(s), 10/9/2009)
- ML102180346 - E-Mail from Saba to Mensah, 2.206 Petition Request Against Progress Energy Corporation at Crystal River Unit 3, Updated Notes for PRB Meeting on February 2nd. (6 page(s), 1/27/2010)
- ML102180347 - E-Mail from Morrissey to Chou, 20 shift/10 day delay added outage. (1 page(s), 10/11/2009)
- ML102180348 - E-Mail from Chou to Bagchi, OpE Item on Crystal River Containment Update. (5 page(s), 10/13/2009)
- ML102180349 - E-Mail from Kuntz to Saba, FOIA Response. (2 page(s), 10/14/2009)
- ML102180350 - E-Mail from Boyce to Saba, CR3 November 20th Public Meeting. (2 page(s), 10/27/2009)
- ML102180351 - E-Mail from Franke to Saba, CR3 November 20th Public Meeting. (2 page(s), 10/27/2009)
- ML102180352 - E-Mail from Carrion to Franke, CR3: Root Cause Analysis Metrics. (1 page(s), 11/3/2009)
- ML102180353 - E-Mail from Kennedy to Christensen, Update Regarding Crystal River Unit 3 Containment Issue. (2 page(s), 11/3/2009)
- ML102210504 - E-Mail from Carrion to Christens, CR3 Status. (1 page(s), 11/4/2009)
- ML102210505 - E-Mail from Franke to Coursey, Solicitation for Comments: 11/6/09 Crystal River Update. (2 page(s), 11/6/2009)
- ML102210506 - E-Mail from Khanna to Lake, Crystal River on Site Work. (1 page(s), 11/12/2009)
- ML102210507 - E-Mail from Lake to Khanna, CR3 Reactor Building Design Model. (2 page(s), 11/12/2009)
- ML102210508 - E-Mail from Carrion to Orf, CR3 Information. (1 page(s), 11/13/2009)
- ML102210509 - E-Mail from Chou to Khanna, Status of New ORNL Contract for Special Information Support. (4 page(s), 10/15/2009)
- ML102210510 - E-Mail from Carrion to Thomas, 11/17 Morning Brief. (1 page(s), 11/17/2009)
- ML102210511 - E-Mail from Thomas to Franke, 11/18 Morning Brief. (1 page(s), 11/18/2009)
- ML102210512 - E-Mail from Khanna to Saba, Status of Crystal River Unit 3 Containment Delamination Issue. (1 page(s), 1/22/2010)
- ML102210513 - E-Mail from Masters to Lake, Process for NRC Review of Root Cause Info. (2 page(s), 11/23/2009)
- ML102220411 - E-Mail from Herrin to Williams, Process for NRC Review of Root Cause Info - Revision 1. (1 page(s), 11/23/2009)
- ML102220412 - E-Mail from Orf to Lake, 2009 Nov 23, Containment Unfolded Graphics IR Mosaic. (1 page(s), 11/24/2009)
- ML102220403 - E-Mail from Thomas to Lake, CR3 SIT - New and Followup Questions. (6 page(s), 12/1/2009)
- ML102220404 - E-Mail from Lake to Franke, Update on Crystal River. (1 page(s), 12/10/2009)
- ML102220405 - E-Mail from Masters to Ogle, Wednesday CR3 Delamination Project 7:30 am Update. (1 page(s), 1/13/2010)
- ML102220406 - E-Mail from Kuntz to Wrona, Update Regarding Crystal River Unit 3 Containment Delamination Issue (December 11, 2009). (2 page(s), 12/14/2009)
- ML102220407 - E-Mail from Saba to Ninh, Position on CR Petition. (3 page(s), 12/28/2009)
- ML102220408 - E-Mail from Franke to Ninh, CR-3 Schedule and Root Cause Failure Modes Update as of 12-28-09. (1 page(s), 12/29/2009)
- ML102220409 - E-Mail from Saba to Khanna, CR3 Containment RIC Abstract. (3 page(s), 1/7/2010)
- ML102220410 - E-Mail from Khanna to Lake, Comments on SOW for J-4322, Crystal River Concrete Containment. (1 page(s), 1/7/2010)
- ML102220421 - E-Mail from Thomas to Lake, GT Questions 12-30-09. (4 page(s), 1/11/2010)
- ML102220422 - E-Mail from Naus to Lake, Update on Crystal River. (25 page(s), 1/13/2010)
- ML102220423 - E-Mail from Jessup to Franke, Crystal River Bullets 1/15/10 - Draft. (2 page(s), 1/15/2010)
- ML102220424 - E-Mail from Thomas to Masters, 01-19-10 Level 3 Rev D. (1 page(s), 1/20/2010)
- ML102220425 - E-Mail from Ogle to Masters, Update on Crystal River. (2 page(s), 1/20/2010)
- ML102220426 - E-Mail from Ogle to Masters, IOEB Clearinghouse Screening Summary For Monday, October 5, 2009. (6 page(s), 1/20/2010)
- ML102220427 - E-Mail from Ogle to Masters, Update Regarding Crystal River Unit 3 Delamination Issue (January 8, 2010). (2 page(s), 1/20/2010)
- ML102220428 - E-Mail from Ogle to Masters, Turnover Items. (1 page(s), 1/20/2010)
- ML102220429 - E-Mail from Ogle to Kennedy, Update Regarding Crystal River Unit 3 Containment Delamination Issue (January 8, 2010). (2 page(s), 1/11/2010)
- ML102350457 - FOIA/PA-2010-0116 - Resp 6 - Partial. (5 page(s), 8/18/2010)
- ML102350452 - E-Mail from Carrion to Thomas, Photos of Core #5. (1 page(s), 11/16/2009)
- ML102350453 - E-Mail from Carrion to Thomas, CTL Petrographic Report on One Core. (1 page(s), 11/16/2009)
- ML102350454 - P11 Company Background. (2 page(s), 8/18/2010)
- ML102350455 - E-Mail from Mensah to Mensah, G20090690 - Email for Tom Blount To forward to Bruce Boger. (7 page(s), 1/21/2010)
- ML102350456 - E-Mail from Naus to Lake, CR3 Info. (30 page(s), 11/3/2009)
- ML102350122 - FOIA/PA-2010-0116 - Resp 7 - Partial. (1 page(s), 8/18/2010)
- ML102350115 - E-Mail from Thomas to Masters, Crystal River 3 Containment. (83 page(s), 10/21/2009)
- ML102350117 - E-Mail from Franke to Lake, Crystal River SOW. (1 page(s), 10/23/2009)
- ML102350118 - E-Mail from Lake to Dan Naus, 12-3_all questions. (1 page(s), 12/10/2009)
- ML102350119 - E-Mail from Thomas to Farzam, Design Basis Calculations. (2 page(s), 1/23/2010)
- ML102350120 - E-Mail from Chou to Lake, CTR Level II Schedule. (1 page(s), 1/21/2010)
- ML102350121 - E-Mail from Lake to Dan Naus, 1_20_All Questions. (1 page(s), 1/22/2010)