Home > NRC Library > ADAMS Public Documents
Comanche Peak, Units 3 and 4 - Response to Request for Additional Information Nos. 4308, 4309, 4310 and 4311.
Accession Number: ML102070358
Date Released: Monday, August 9, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML102070355 - Comanche Peak, Units 3 and 4 - Response to Request for Additional Information Nos. 4308, 4309, 4310 and 4311. (51 page(s), 7/16/2010)
- ML102080129 - Comanche Peak Power Plant, Units 3 & 4 - COL Application Part 2, FSAR Pages for RAI 138. (9 page(s), 7/16/2010)
- ML102080137 - Calculation TXUT-001-FSAR-2.4.4-CALC-015, Rev. 1, "Brazos River Dam Failures Analysis for Comanche Peak Nuclear Power Plant Units 3 and 4," Part 1 of 2. (75 page(s), 6/24/2010)
- ML102080138 - Calculation TXUT-001-FSAR-2.4.4-CALC-015, Rev. 1, "Brazos River Dam Failures Analysis for Comanche Peak Nuclear Power Plant Units 3 and 4," Part 2 of 2. (69 page(s), 6/24/2010)
- ML102080147 - Comanche Peak Nuclear Power Plant, Units 3 & 4 - COL Application Part 2, FSAR Tables. (8 page(s), 7/16/2010)
- ML102080148 - Calculation TXUT-001-FSAR-2.4.2-CALC-020, Rev. 3, "Analysis of the Effects of Local Intense Precipitation at the Comanche Peak Nuclear Power Plant Units 3 and 4". (36 page(s), 6/24/2010)
- ML102080206 - Comanche Peak Nuclear Power Plant, Units 3 & 4 - COL Application Part 2, FSAR Table 2.0-1R. (38 page(s), 7/16/2010)
- ML102080201 - Volumetric and Sedimentation Survey of Squaw Creek Reservoir, 2007 Survey (73 page(s), 8/31/2008)
- ML102080176 - Calculation TXUT-001-FSAR-2.4.3-CALC-011, Rev. 2, "Probable Maximum Precipitation Calculation for Comanche Client: Luminant Peak Nuclear Power Plant Units 3 and 4 Using HMR 51 & HMR 52," Part 1 of 4. (75 page(s), 6/24/2010)
- ML102080182 - Calculation TXUT-001-FSAR-2.4.3-CALC-011, Rev. 2, "Probable Maximum Precipitation Calculation for Comanche Client: Luminant Peak Nuclear Power Plant Units 3 and 4 Using HMR 51 & HMR 52," Part 2 of 4. (75 page(s), 6/24/2010)
- ML102080208 - Calculation TXUT-001-FSAR-2.4.3-CALC-011, Rev. 2, "Probable Maximum Precipitation Calculation for Comanche Client: Luminant Peak Nuclear Power Plant Units 3 and 4 Using HMR 51 & HMR 52," Part 3 of 4. (75 page(s), 6/24/2010)
- ML102080191 - Calculation TXUT-001-FSAR-2.4.3-CALC-011, Rev. 2, "Probable Maximum Precipitation Calculation for Comanche Client: Luminant Peak Nuclear Power Plant Units 3 and 4 Using HMR 51 & HMR 52," Part 3 of 4. (26 page(s), 6/24/2010)
- ML102080196 - Calculation TXUT-001-FSAR-2.4.3-CALC-012, Rev. 2, "Probable Maximum Precipitation Calculation for Comanche Client: Luminant Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS)," Part 4 of 4. (3181 page(s), 6/24/2010)
- ML102080156 - Calculation TXUT-001-FSAR-2.4.3-CALC-013, Rev. 3, "Coincident Wind Wave Analysis for Comanche Peak Nuclear Power Plant, Units 3 and 4". (24 page(s), 6/24/2010)
- ML102080221 - Comanche Peak Nuclear Power Plant, Units 3 & 4 - COL Application Part 2, FSAR Pages 2.4-.4 through Figure 2.4.4-204. (37 page(s), 7/16/2010)