Home > NRC Library > ADAMS Public Documents
Forwards NYPA Assessment Panel charters & meeting minutes, from 1993,1994,1995 to present,to be made public per guidelines in MC 0350.
Accession Number: ML100360468
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML100360467 - Forwards NYPA Assessment Panel charters & meeting minutes, from 1993,1994,1995 to present,to be made public per guidelines in MC 0350. (4 page(s), 7/5/1995)
- ML100500556 - Informs that NYPA Assessment Panel revised charter based on current shutdown status of plant,reflecting development of restart action plan & obtaining restart approval per MC 0350 & Region 1 instruction 1470.1.Lists panel responsibilities. (2 page(s), 5/13/1993)
- ML100500559 - Informs of expansion of FitzPatrick Assessment Panel to include plant & assume new title of NYPA Assessment Panel. (2 page(s), 1/11/1993)
- ML100500560 - Summary of 930119 93-01 NYPA Assessment Panel meeting re NRC charter,expectations for current panel members & future activities. (14 page(s), 1/29/1993)
- ML100500562 - Summary of 930204 93-02 NYPA Assessment Panel meeting re determination that corporate engineering team insp be redirected to be broad-based assessment of activities at plant. (2 page(s), 2/9/1993)
- ML100500563 - Summary of 930217 93-03 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants. (6 page(s), 3/1/1993)
- ML100500564 - Summary of 930331 93-04 NYPA Assessment Panel meeting re NYPA presentation of FitzPatrick restart self-assessment, review of comment on plant PIP & plant restart process. (4 page(s), 4/7/1993)
- ML100500567 - Summary of 930408 93-05 NYPA Assessment Panel meeting re FitzPatrick plant status,post startup issues,Indian Point plant status & establishment of subcommittees. (12 page(s), 4/14/1993)
- ML100500569 - Submits restart item criteria to aid in development of list of restart issues for plant. (2 page(s), 4/7/1993)
- ML100500571 - Summary of 930415 93-06 NYPA Assessment Panel meeting re special team insp at plant to be conducted between 930426 & 930507,status of FitzPatrick plant,status of Indian Point plant & development of restart issues list. (5 page(s), 4/18/1993)
- ML100500572 - Summary of 930514 93-07 NYPA Assessment Panel meeting re status of FitzPatrick plant,status of Indian Point plant & review of NRC draft restart items list. (32 page(s), 5/14/1993)
- ML100500573 - Summary of 930520 93-08 NYPA Assessment Panel meeting re status of FitzPatrick plant,status of Indian Point plant, preliminary findings of special team insp,changes to draft restart issues list & insp support at Indian Point plant. (6 page(s), 6/7/1993)
- ML100500574 - Summary of 930608 93-09 NYPA Assessment Panel meeting re correction to 93-08 meeting minutes,status & insp status planning for FitzPatrick & Indian Point plants. (12 page(s), 6/18/1993)
- ML100500575 - Summary of 930714 93-10 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,NYPA response to NRC questions & comments concerning PIP items & Indian Point restart action plan status. (8 page(s), 7/14/1993)
- ML100500577 - Summary of 930804 93-11 NYPA Assessment Panel meeting re status of FiztPatrick & Indian Point plants,logic functional deficiencies at Fitzpatrick plant & need for review of changes to PIP as result of SIT. (6 page(s), 9/2/1993)
- ML100500578 - Summary of 930902 93-12 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,OSTI planned for FitzPatrick plant,Indian Point restart issue checklist item IV.8 & how NRC should best assess this area. (8 page(s), 9/29/1993)
- ML100500580 - Summary of 931109 93-13 NYPA Assessment Panel meeting re status at FitzPatrick & Indian Point plants,OSTI at FitzPatrick plant,proposed several ongoing issues for addition to restart issue list & views on PIP & SIT causes. (16 page(s), 11/23/1993)
- ML100500581 - Summary of 931123 93-14 NYPA Assessment Panel meeting re insp plan at FitzPatrick for followup of items identified in IP3 SIT rept,status of FitzPatrick plant,insp plans/timelines for selected PIP items & NRC restart items. (10 page(s), 12/16/1993)
- ML100500582 - Summary of 931221 93-15 NYPA Assessment Panel meeting re impressions of results of PIP mgt meeting,noted NYPA appears to be driven excessively by outside parties,conditions at Indian Point plant. (2 page(s), 3/4/1994)
- ML100500584 - Summary of 940124 94-01 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,proposed additions & mods to list of restart issues in restart action plan & expectations for NRC/NYPA mgt meeting. (10 page(s), 3/9/1994)
- ML100500585 - Summary of 940301 94-02 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,Indian Point restart insp follow-up tracking list & MOV program status at Indian Point plant. (14 page(s), 4/4/1994)
- ML100500586 - Summary of 940324 94-03 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,review of INPO corporate evaluation of NYPA conducted in Dec 1993 & current insp program expectations at plants. (8 page(s), 5/3/1994)
- ML100500587 - Forwards INPO comments on review of NYPA corporate support & monitoring of Indian Point & FitzPatrick plants & discusses NRC insp activity. (14 page(s), 7/5/1995)
- ML100500589 - Summary of 940524 94-04 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,restart action plan items for closure & licensee drawing upgrade program & record retention program. (6 page(s), 6/3/1994)
- ML100500590 - Submits agenda for 94-05 NYPA Assessment Panel meeting. (2 page(s), 7/5/1995)
- ML100500591 - Summary of 940607 94-05 NYPA Assessment Panel meeting re comments on NYPA mgt meeting of 940526 & results of meeting w/public,New York State Assemblywoman S Galef & Cortland Township Supervisor L Puglisi following mgt meeting. (6 page(s), 7/6/1994)
- ML100500592 - Summary of 9407015 94-06 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants & draft NRC ltr to NYPA discussing restart & continuous improvement plan. (4 page(s), 8/2/1994)
- ML100500594 - Summary of 940908 94-07 NYPA Assessment Panel meeting re MOV meeting between NRC & NYPA on 940818,status of Fitzpatrick & Indian Point plants,status of DRSS core insp program & open licensing actions at Indian Point plant. (6 page(s), 9/21/1994)
- ML100500595 - Summary of 941005 94-08 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,schedule for closure of 59 Indian Point 3 restart action plan items & restart action plan item 2.II.02 for closure. (6 page(s), 10/18/1994)
- ML100500596 - Summary of 941019 94-09 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,licensee annual EP partial participation exercise observed by NRC inspectors 941013 & proposed development of PERT chart. (6 page(s), 11/1/1994)
- ML100500597 - Summary of 941117 94-11 NYPA Assessment Panel meeting re Indian Point plant readiness assessment team insp to begin 950123 & review of minutes from NYPA Assessment Panel meeting 94-10 & open action list. (2 page(s), 12/12/1994)
- ML100500598 - Summary of 941202 94-12 NYPA Assessment Panel meeting re NRC "road map" for Indian Point restart & power ascension, status of FitzPatrick & Indian Point plants & 941117 public meeting w/NYPA. (4 page(s), 12/16/1994)
- ML100500599 - Summary of 941222 94-13 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,RATI insp plan, restart items for closure & status of licensing issues at Indian Point plant. (4 page(s), 1/9/1995)
- ML100500600 - Summary of 950322 NYPA 95-05 Assessment Panel meeting re current plant status & NRC observation of station blackout test. (4 page(s), 3/31/1995)
- ML100500601 - Summary of 950110 94-14 NYPA Assessment Panel meeting re status of FitzPatrick & Indian Point plants,conclusion from T Martin tour of Indian Point plant on 950104-05,status of restart activites & licensing issues for Indian Point plant. (6 page(s), 1/20/1995)
- ML100500602 - Summary of 950413 NYPA 95-06 Assessment Panel meeting re current plant status & problem identified by NRC w/five containment isolation valves in plant TS. (4 page(s), 4/26/1995)
- ML100500603 - Summary of 950124 95-01 NYPA Assessment Panel meeting re C Cowgill visit to Indian Point plant during wk of 950116, review of minutes from NYPA Assessment Panel meeting 94-14 & review of open NYPA Assessment Panel action item list. (4 page(s), 2/2/1995)
- ML100500604 - Summary of 950425 NYPA 95-07 Assessment Panel meeting to discuss restart assessment team insp exit meeting scheduled for 950427. (2 page(s), 5/3/1995)
- ML100500605 - Summary of 950207 95-02 NYPA Assessment Panel meeting re review of minutes from NYPA Assessment Panel meeting 95-01, NRC restart action plan items for closure,status of RATI & Indian Point IPE. (2 page(s), 2/17/1995)
- ML100500606 - Summary of 950516 NYPA 95-08 Assessment Panel meeting to discuss recent allegation received by plant & status of actions to address transcript from public meeting held on 950427. (9 page(s), 6/1/1995)
- ML100500607 - Summary of 950223 95-03 NYPA Assessment Panel meeting re importance of tracking remaining restart action plan technical items,status of FitzPatrick & Indian Point plants & status of two remaining open restart issues. (4 page(s), 3/7/1995)
- ML100500608 - Summary of 950309 95-04 NYPA Assessment Panel meeting re enforcement panel discussion concerning auxiliary safety injection component cooling water pumps & status of FitzPatrick & Indian Point plants. (4 page(s), 3/20/1995)