Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for background records of all insp repts on facility since Dec 1982,per 841210 oral agreement. Forwards documents listed on app.Documents also available in PDR.
Accession Number: ML082320156
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082330313 - Responds to FOIA request for background records of all insp repts on facility since Dec 1982,per 841210 oral agreement. Forwards documents listed on app.Documents also available in PDR. (32 page(s), 2/27/1985)
- ML20132F387 - Rev 0 to Project Mgt Procedure PMP-004, "Control of Vendor Manuals." (22 page(s), 4/16/1984)
- ML20132F580 - Rev 0 to Nuclear Administrative Procedure NAP-504, "Implementation of Operations Assessment & Info Dissemination Program." (161 page(s), 12/28/1982)
- ML20133A369 - Rev 1 to Maint Procedure ME-4-809, "Low Voltage Control Cable Terminations & Splices." (18 page(s), 12/29/1983)
- ML20132F439 - Audit on 830119-0304 of environ monitoring program.Audit checklist for health physics program & related documentation encl. (169 page(s), 3/24/1983)
- ML20132F898 - Draft ltr forwarding NRR draft SALP input for review. Comments received by 830826 will be considered in final rept. (6 page(s), 2/27/1985)
- ML20132F513 - Rev 0 to Nuclear Administrative Procedure NAP-220, "Radiation Control Section Overview." WM Morgan 840828 interofc memo re NRC review of radiation protection,Radwaste Program Insp 84-38 on 840820-24 encl. (8 page(s), 1/5/1983)
- ML20132F548 - Rev 1 to Administrative Procedure PE-2-014, "Equipment Environ Qualification." (53 page(s), 1/15/1984)
- ML20132F342 - Rev 1 to Administrative Procedure MD-1-007, "Preventive Maint Task Identification." (60 page(s), 8/8/1983)
- ML20132F332 - Rev 3 to Administrative Procedure UNT-5-002, "Condition Identification & Work Authorization." (51 page(s), 4/20/1984)
- ML082320162 - Advises that listed Comsip,Inc,Delphi Sys Div pump failures discussed in Insp Rept 99900734/81-01 on 810406-09 closed. Related info encl. (9 page(s), 7/1/1981)
- ML20132F721 - Confirms 810319 telcon re Insp Rept 99900734/81-01 on 810406-09.Insp will relate to QA program implementation. (1 page(s), 3/20/1981)
- ML20132F985 - Public version of changes to emergency plan implementing procedures,including Rev 3 to EP-1-010, "Unusual Event," Rev 3 to EP-1-020, "Alert," Rev 3 to EP-1-030, "Site Area Emergency" & Rev 3 to EP-1-040, "General Emergency." (37 page(s), 2/21/1984)
- ML20133A412 - Rev 0 to QC Procedure WQC-52, "Containment Fan Coolers - Installation Insp." Product assurance calibr records encl. (16 page(s), 5/23/1979)
- ML20132F948 - Rev E to Procedure TBP-8, "QA Audits." (48 page(s), 3/25/1981)
- ML20132F611 - Rev 0 to Maint Procedure MM-6-011, "General Torquing & Detensioning." Limitorque instruction & maint manuals encl. (216 page(s), 3/4/1982)
- ML20132F626 - Rev 1 to "Plant Protection Sys Field Mod Procedure for Louisiana Power & Light." (21 page(s), 3/30/1983)
- ML20132F592 - Rev 2 to Surveillance Procedure MM-3-015, "Emergency Diesel Engine Insp." Related info encl. (175 page(s), 6/4/1984)
- ML20132F903 - Rev 0 to Maint Procedure ME-4-811, "Medium & High Voltage Cable Terminations & Splices." (23 page(s), 1/25/1982)
- ML20133A465 - Forwards 10CFR50.55(e)/10CFR21 rept.Problem appears to be generic.Followup requested.Record of 810211 telcon encl. (4 page(s), 2/13/1981)
- ML20132F651 - Rev 0 to Departmental Procedure MD-01-010, "Plant Lubrication Program." (7 page(s), 4/14/1983)
- ML20132F304 - Rev 2 to Maint Dept Procedure MD-1-011, "Development,Control & Distribution." (46 page(s), 8/11/1983)
- ML20133A444 - Spec 501-76, "High-Strength Bolted Field Connections for Structural Steel." (11 page(s), 2/27/1985)
- ML20132B693 - Trip rept of 831104-05 site visit & meeting to formulate final objectives,guidance & schedule for initial full-scale exercise. (9 page(s), 11/21/1983)
- ML20132F976 - Responds to Emergency Preparedness Followup Appraisal Rept 50-382/84-02.Table 5-1 of emergency plan revised re augmentation capability for supporting onshift organization, per NRC 840329 ltr. (25 page(s), 4/25/1984)
- ML20132F671 - Advises that util has scheduled emergency exercise-for- score on 850208 w/State of LA,St Charles Parish & St John the Baptist Parish.Matls will be submitted for review. (1 page(s), 11/9/1983)
- ML20132F870 - Advises that transportation support ltrs of agreement should be withheld from public due to proprietary nature,per 10CFR2.790.FEMA 840622 memo re supplemental findings encl. (4 page(s), 8/1/1984)
- ML20132G061 - Rev 1 to Technical Procedure NE-1-002, "New Fuel Receipt Insp." (1451 page(s), 11/23/1982)
- ML20132F274 - Lesson Plan W3G-001-002MH-003, "General Employee Training, Station Security Plan." Related info encl. (50 page(s), 3/2/1984)
- ML20132F717 - Forwards facility full-scale emergency preparedness exercise objectives for review.Exercise scheduled for 830413. W/o encl. (1 page(s), 2/25/1983)
- ML20132F648 - Forwards input from Physical Security Section for 1982-1983 facility SALP rept.Related info,including Westinghouse maint manual,encl. (150 page(s), 8/29/1983)
- ML20132F497 - Rev 0 to Maint Procedure MM-6-002, "Valve Operator Repair." (12 page(s), 8/12/1981)
- ML20132G046 - Forwards Safety Insp Rept 50-382/84-20.Areas examined include implementation of fire protection program & compliance w/10CFR50,App R.Listed open items referred to NRR for resolution.Meeting requested. (21 page(s), 7/13/1984)
- ML20132F695 - Forwards facility emergency preparedness exercise summary for review.Exercise scheduled on 830525.W/o encl. (1 page(s), 4/15/1983)
- ML20132F451 - Rev 1 to Plant Engineering Procedure EP-2-005, "Plant Engineering Condition Identification Work Authorization Processing." (19 page(s), 6/28/1983)
- ML20132F640 - Rev 1 to Maint Procedure MM-4-001, "Lubrication Procedure." (23 page(s), 12/29/1982)
- ML082560741 - Forwards 10CFR50.55(e)/Part 21 rept from TVA re generic problem w/hydrogen detection sys integrity.Followup on generic aspects w/AE/vendor requested.Supporting documentation encl. Continuation of supporting documentation. (38 page(s), 7/15/2008)
- ML082560740 - Forwards 10CFR50.55(e)/Part 21 rept from TVA re generic problem w/hydrogen detection sys integrity.Followup on generic aspects w/AE/vendor requested.Supporting documentation encl. Continuation of supporting documentation. (40 page(s), 7/15/1980)
- ML082560739 - Forwards 10CFR50.55(e)/Part 21 rept from TVA re generic problem w/hydrogen detection sys integrity.Followup on generic aspects w/AE/vendor requested.Supporting documentation encl. Continuation of supporting documentation. (68 page(s), 7/15/1980)
- ML082560738 - Forwards 10CFR50.55(e)/Part 21 rept from TVA re generic problem w/hydrogen detection sys integrity.Followup on generic aspects w/AE/vendor requested.Supporting documentation encl. Continuation of supporting documentation. (68 page(s), 7/15/1980)
- ML082560737 - Forwards 10CFR50.55(e)/Part 21 rept from TVA re generic problem w/hydrogen detection sys integrity.Followup on generic aspects w/AE/vendor requested.Supporting documentation encl. Continuation of supporting documentation. (52 page(s), 7/15/1980)
- ML082560417 - Forwards 10CFR50.55(e)/Part 21 rept from TVA re generic problem w/hydrogen detection sys integrity.Followup on generic aspects w/AE/vendor requested.Supporting documentation encl. (60 page(s), 7/15/1980)
- ML20132C198 - Requests that encl FEMA 840511 supplemental interim finding rept on offsite plans be transmitted to util.Rept addresses four offsite planning issues specified by ASLB. (3 page(s), 6/7/1984)
- ML20132F733 - Forwards description of objectives & summary of events for facility full-scale emergency preparedness exercise scheduled on 830413.W/o encls. (2 page(s), 1/26/1983)
- ML20132G053 - Rev 1 to Administrative Procedure UNT-3-003, "General Employee Training." (28 page(s), 2/11/1984)
- ML20132F381 - Rev 2 to Maint Procedure ME-4-131, "4.16 kV GE Magne-Blast Breaker." (117 page(s), 5/16/1983)
- ML20132F369 - Rev 0 to Procedure UNT-4-004, "Plant Correspondence Control." (28 page(s), 5/5/1980)
- ML20132F521 - Rev 2 to Surveillance Procedure ME-3-310, "Calibr of Time Delay Relays." Related documentation encl. (222 page(s), 4/18/1984)
- ML20132F618 - Rev 1 to Surveillance Procedure MM-3-015, "Emergency Diesel Engine Insp." (87 page(s), 3/19/1984)
- ML20132F314 - Rev 2 to Calibr Procedure MI-5-118, "Calibr of Crimpers." Manual rev review forms & related documentation encl. (132 page(s), 10/24/1983)
- ML20132C370 - Forwards RW Krimm 840725 ltr forwarding rept on 840208 exercise of offsite radiological emergency preparedness plans for facility.Category B deficiencies identified. (2 page(s), 8/16/1984)
- ML20132F421 - Rev 1 to Administrative Procedure UNT-4-007, "Control of Plant Manuals." (35 page(s), 12/10/1980)
- ML20132F463 - Rev 0 to QA Plan QAP-3747, "Engineering/Technical Svcs to Perform Spare Parts Evaluation & Analysis." Related documentation encl. (21 page(s), 12/31/1982)
- ML20132F923 - "Waterford 3 Steam Electric Station 1983 Annual Emergency Preparedness Exercise." (43 page(s), 12/31/1983)
- ML20132F657 - Rev 1 to Maint Procedure ME-13-019, "Motor Bearing Replacement & Motor Cleaning." (23 page(s), 4/6/1983)
- ML20133A387 - Rev 1 to Spec MC-1, "General Specs Covering Installation of Mechanical Equipment." Field change requests encl. (45 page(s), 10/29/1976)
- ML20132F663 - Rev 0 to Maint Procedure ME-4-701, "Greasing Electrical Equipment." (9 page(s), 11/11/1982)
- ML20132F952 - Forwards public version of changes to facility emergency plan & procedures.Revs will be completed by 840504. (1 page(s), 2/21/1984)
- ML20132F553 - Rev 4 to QC Procedure WQC-50, "Equipment Hanging & Setting Insp." (7 page(s), 12/9/1983)
- ML20132F355 - Rev 1 to Surveillance Procedure ME-3-327, "4.16 kV GE Magne-Blast Breaker." (47 page(s), 3/9/1984)
- ML20132F909 - Rev P to Procedure TBP-26, "Visual Insp Procedure." (34 page(s), 6/15/1983)
- ML20132F937 - Rev I to Procedure TBP-18, "QA Records Control." (21 page(s), 1/10/1983)
- ML20132F470 - Vol XIII to "Plant Operating Manual," "Health Physics Procedures." (15 page(s), 11/21/1983)
- ML20133A425 - Rev 0 to QC Procedure WQC-50, "Equipment Hanging & Setting Insp." (5 page(s), 5/23/1979)
- ML20132G008 - Confirms 830408 telcon re requested one wk extension of deadline for submission of Waterford exercise scenario. (75 page(s), 4/12/1983)
- ML20132F588 - Rev 0 to Maint Procedure MM-6-012, "Structural Bolt Tensioning." (27 page(s), 5/26/1982)
- ML20132F567 - Discusses Insp Rept 50-382/84-05 open items re post-accident sampling sys design & operability.Physical layout of sys described.No leakage should be allowed at mechanical couplings in wing area of reactor auxiliary bldg. (4 page(s), 3/1/1984)
- ML20133A346 - Rev 0 to Reliance Test Rept 753.1, "Environ Test Program for Twenty-One Components." (6 page(s), 10/30/1978)
- ML20132G059 - Rev 1 to Technical Procedure NE-1-001, "New Fuel Shipping Container Operation." (29 page(s), 11/30/1982)
- ML20132F607 - Rev 2 to Maint Procedure ME-7-001, "Insulation Resistance & Continuity Testing." Related info encl. (65 page(s), 6/24/1983)
- ML20133A336 - Rev 0 to Procedure 753-ET-1, "Environ Test Plan for Device Qualification to IEEE 323-1971." (6 page(s), 9/15/1978)
- ML20132F631 - Rev 0 to PMD-Y83-061, "Plant Lubrication Manual." (98 page(s), 2/27/1985)
- ML20132F415 - Requests review of encl draft Insp Rept 50-382/84-24. Related documentation encl. (51 page(s), 6/11/1984)
- ML20132F535 - Rev 0 to Surveillance Procedure OP-903-106, "Plant Protection Sys Channel 'D' Functional Test." Related info, including ITT electronic transmitter manual,encl. (282 page(s), 12/13/1983)
- ML20132F814 - Forwards 10CFR50.55(e)/Part 21 rept received from util re failure of contaminated gas monitor sys pump.Followup of generic aspects requested. (21 page(s), 5/1/1980)
- ML20132F875 - Rev 1 to Calibr Procedure MI-5-121, "Calibr of Burndy Hypress Crimpers." (18 page(s), 2/8/1984)
- ML20132F883 - Rev 0 to Maint Procedure ME-4-810, "Low Voltage Power Cable Terminations & Splices." (38 page(s), 12/31/1983)
- ML20132F980 - Informs that rept of Waterford emergency exercise will not be submitted due to cancellation of exercise. (1 page(s), 6/1/1983)
- ML20132F510 - Rev 0 to Project Mgt Procedure PMP-002, "Document Control." (39 page(s), 3/1/1984)
- ML20132F701 - Forwards Insp Rept 99900734/82-02 on 820413-14 at Comsip,Inc re extent of qualification testing of Delphi Instruments Div hydrogen analyzer,per IEEE Std 323-1974.Allegations re inadequacy unsubstantiated. (1 page(s), 9/1/1982)
- ML20133A540 - Draft Issue C of Procedure ASP-IV-22, "Unloading &/or Handling Heavy or Specialized Equipment." (6 page(s), 2/9/1982)
- ML20133A573 - Draft Issue H of Procedure CP-425, "Insulation Resistance Testing of Rotating Electrical Equipment & Power Cables 480-Volt Svc & Above." (6 page(s), 5/13/1980)
- ML20133A606 - Part 21 rept re pump diaphragm failures.Initially reported on 800403.Caused by closure of containment isolation valves w/o pump shutdown.Bypass kit available to limit pump pressure.Defects not reportable per 10CFR21. (3 page(s), 4/8/1981)
- ML20133A635 - Part 21 rept re broken motor shaft on Reliance Electric Co. motors supplied to Comsip,Inc.Initially reported on 800616. Corrective actions:revised design included in all subsequent motors.Applicable manual & related info encl. (7 page(s), 5/11/1984)