The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML071100105 - FOIA/PA-2007-0180 - Significant Determination Process (SDP) Phase I & II inspector training material (1 page(s), 4/20/2007)
- ML072110308 - FOIA/PA-2007-0180 Resp 1 - Partial. (4 page(s), 7/25/2007)
- ML072110311 - MC 0609 Training. (17 page(s), 3/18/2002)
- ML072110313 - Appendix A - Significance Determination of Reactor Inspection Findings for At-Power Situations. (30 page(s), 3/18/2002)
- ML072110315 - Significance Determination Process Update. (13 page(s), 6/21/2000)
- ML072110317 - Individual Study Activity. (15 page(s), 7/25/2007)
- ML072110320 - Risk-Informed Inspection Notebook for Generic BWR Nuclear Power Plant - GE, BWR-3 with Mark I Containment. (27 page(s), 7/25/2007)
- ML072110322 - Risk-Informed Inspection Notebook for Generic PWR Nuclear Plant - Westinghouse PWR, Four-Loop Plant with Large Dry Containment. (22 page(s), 7/25/2007)
- ML072110323 - Slide Presentation, Significance Determination Process Overview. (5 page(s), 7/25/2007)
- ML072110325 - Slide Presentation, Significance Determination Process Overview. (11 page(s), 7/25/2007)
- ML072110328 - Document from James Neurauter Exercise 1 Scenario. (67 page(s), 7/25/2007)
- ML072110362 - Slide Presentation, IAEA/USA Workshop. (42 page(s), 7/25/2007)
- ML072110364 - Region III SDP Training, Wednesday, June 12, 2002. (33 page(s), 6/12/2002)
- ML072110366 - Notes on Slide Presentation Titled Documenting Findings Presented by Ann Marie Stone. (10 page(s), 10/24/2006)
- ML072110368 - E-mail from Ann Marie Stone to Adam Wilson and Others Re: today's Training Session with Properties and Attachment Titled Writing Assignment. (14 page(s), 10/25/2006)
- ML072110371 - Assignment - Documenting Findings. (7 page(s), 11/13/2006)
- ML072130392 - Notes on Slide Presentation Titled Documenting Findings Presented by Ann Marie Stone. (15 page(s), 11/16/2006)
- ML072110374 - Slide Presentation, DRS Engineering Seminar. (11 page(s), 5/31/2007)
- ML072110382 - NRC Presentation Titled, "SRAs Present." (45 page(s), 7/25/2007)
- ML072110384 - USNRC Presentation Titled "SRA Update." (7 page(s), 7/25/2007)
- ML072110386 - USNRC Presentation Titled, "Significance Determination Process Training". (3 page(s), 2/19/2004)
- ML072110388 - USNRC Presentation Titled, "Region I Utility Group - Reactor Oversight Process Training". (28 page(s), 9/15/2005)
- ML072110392 - USNRC Presentation Titled, "SRA Training Topics". (11 page(s), 10/11/2006)
- ML072110395 - USNRC Presentation Titled, "SDP Update and Ultimate Heat Sink Technical Issues". (3 page(s), 7/25/2007)
- ML072110399 - Slides from Reactor Safety SDP Region III Counterpart Meeting Presented by Mike Franovich, NRR and Pete Wilson, NRR. (42 page(s), 7/25/2007)
- ML072110404 - Slides from Exercises 1 thru 6 from the Generic Risk-Informed Inspection Notebook. (90 page(s), 7/25/2007)
- ML072110426 - Exercise Solutions from the Generic Risk Informed Inspection Notebook. (85 page(s), 7/25/2007)
- ML072110430 - SDP Phase 2 Exercise. (1 page(s), 7/25/2007)
- ML072110433 - Questions from 1 through 8. (4 page(s), 7/25/2007)
- ML072110438 - Significance Determination Process Flow (Chart). (6 page(s), 7/25/2007)
- ML072110442 - BWR Sample Problem Loss of Inventory. (3 page(s), 7/25/2007)
- ML072110446 - Significance Determination Process Flow. (7 page(s), 7/25/2007)
- ML072110450 - Reactor Oversight, Slides. (14 page(s), 7/25/2007)
- ML072110470 - The Official SRA Users' Manual. (8 page(s), 7/25/2007)
- ML072110476 - "Best Practices" for Managing SDP Timeliness. (12 page(s), 8/8/2006)
- ML072110478 - PG 0803 - Managing Implementation of the Significance Determination Process. (12 page(s), 8/30/2006)
- ML072110482 - Significance Determination Process Refresher Training. (3 page(s), 10/31/2006)
- ML072110487 - Memo to Stuart Richards from Dwight Chamberlain re Comments on Proposed Changes to IMC 0609, Appendix A, "Determining the Significance of Reactor Inspection Findings for At-Power Situations." (4 page(s), 2/5/2007)
- ML072120286 - FOIA/PA-2007-0180 - Resp 2 - Partial. (3 page(s), 7/26/2007)
- ML072130088 - Manual: "Probabilistic Risk Assessment (PRA) Technology and Regulatory Perspectives (P-111)" Volume 1. (800 page(s), 11/1/2005)
- ML072120289 - Manual: "Probabilistic Risk Assessment (PRA) Technology and Regulatory Perspectives (P-111)" Volume 2. (3 page(s), 11/1/2005)
- ML072120294 - SDP Introduction: "Issue Screening _ Appendix B". (3 page(s), 11/2/2006)
- ML072120296 - SDP Introduction: "Significance Determination Process (SDP)" Presentation. (37 page(s), 4/9/2007)
- ML072120297 - SDP Introduction: "Significance Determination Process (SDP)" Presentation. (37 page(s), 4/11/2007)
- ML072120301 - SDP Introduction: "AFW Issue". (2 page(s), 3/7/2007)
- ML072120304 - SDP Introduction: "AFW Issue Summary. (2 page(s), 4/9/2007)
- ML072120305 - SDP Introduction: "Counting Rule Worksheet". (1 page(s), 4/9/2007)
- ML072120307 - SDP Exercise 1: "SDP Exercise 1". (12 page(s), 3/6/2007)
- ML072120311 - SDP Exercise 1: "Background Memo _ NRC Inspection Report 50-382/03-04. (25 page(s), 4/17/2003)
- ML072120314 - SDP Exercise 1: "Issue Description". (3 page(s), 4/11/2007)
- ML072120316 - SDP Exercise 1: "LP", Course: 504P. (6 page(s), 10/15/2004)
- ML072120327 - SDP Exercise 1: "SDP Phase 1 Screening Worksheet for Initialing Events, Mitigation Systems, and Barriers Cornerstones" Tables. (7 page(s), 12/1/2004)
- ML072120317 - SDP Exercise 1: "SDP Phase 1 Screening Worksheet for Initialing Events, Mitigation Systems, and Barriers Cornerstones" Tables. (6 page(s), 2/28/2007)
- ML072120320 - SDP Exercise 2: "Issue Description". (2 page(s), 4/11/2007)
- ML072120322 - SDP Exercise 2: "Issue Screening _Appendix B" 612B". (1 page(s), 4/11/2007)
- ML072120329 - SDP Exercise 2: "SDP Phase 1 Screening Worksheet for Initiating Events, Mitigation Systems, and Barriers Cornerstones" PORV 609A. (5 page(s), 3/23/2007)
- ML072120331 - SDP Exercise 2: "SDP Phase 1 Screening Worksheet for Initiating Events, Mitigation Systems, and Barriers Cornerstones" 609A. (5 page(s), 3/23/2007)
- ML072120332 - SDP Handout: "Significance Determination Process (SDP)" Presentation. (40 page(s), 3/2/2006)
- ML072120344 - SDP Handout: Exercise 1. (2 page(s), 11/1/2006)
- ML072120345 - SDP Handout: Exercise 2. (2 page(s), 11/1/2006)
- ML072120348 - SDP Handout: "SDP Phase 1 Screening Worksheet for Initiating Events, Mitigation Systems, and Barriers Cornerstones." Generic BWR Worksheets. (24 page(s), 11/22/2005)
- ML072120349 - SDP Handout: "SDP Phase 1 Screening Worksheet for Initiating Events, Mitigation Systems, and Barriers Cornerstones." Generic BWR Worksheets Answers. (30 page(s), 11/22/2005)
- ML072120352 - SDP Handout: "Example of Minor Issues _ Appendix E". (23 page(s), 6/22/2006)
- ML072120353 - SDP Handout: "Action Matrix _ Exhibit 4". (2 page(s), 6/22/2006)
- ML072120357 - SDP Handout: "Issue Screening _ Appendix B". (2 page(s), 9/30/2005)
- ML072120359 - SDP Handout: "Issue Screening _Appendix B". (13 page(s), 9/30/2005)
- ML072120360 - SDP Handout: "Determining the Significance of Reactor Inspection Findings for At-Power Situations _ Appendix A". (31 page(s), 11/22/2005)
- ML072150408 - FOIA/PA-2007-0180 Resp 3 - Partial. (2 page(s), 7/27/2007)
- ML072150410 - Fire Protection SDP - Application Training for New Analysis Procedure. (159 page(s), 7/27/2007)
- ML072150412 - Fire Protection SDP Application Training for New Analysis Procedure, Revision August 2004 - Introduction and Module 1. (14 page(s), 8/31/2004)
- ML072150414 - Module 2: Concepts and Terminology. (55 page(s), 7/27/2007)
- ML072150416 - Module 2b - Fire Scenarios. (14 page(s), 7/27/2007)
- ML072150418 - Module 3: Process Overview. (7 page(s), 7/27/2007)
- ML072150419 - Module 4: Phase 1 Details. (39 page(s), 7/27/2007)
- ML072150420 - Module 5: Phase 2 Details, Steps 2.1-2.4. (69 page(s), 7/27/2007)
- ML072150422 - Module 5B - Phase 2 Details Continued, Steps 2.5-2.9. (52 page(s), 7/27/2007)
- ML072150425 - Module 6D: Flexibility. (7 page(s), 7/27/2007)
- ML072180257 - FOIA/PA-2007-0180 Resp 4 - Final. (4 page(s), 7/30/2007)
- ML072180261 - Detailed Discussion of Aspects in Shutdown SDP. (4 page(s), 7/30/2007)
- ML072180262 - Risk-Informed Inspection Notebook for Generic BWR Nuclear Power Plant, GE, BWR-3 With Mark I Containment. (56 page(s), 5/2/2002)
- ML072180263 - PRA Technology and Regulatory Perspectives (P-111) Syllabus. (62 page(s), 3/31/2001)
- ML072180265 - AFW Issue Worksheet Solution. (10 page(s), 11/2/2006)