Home > NRC Library > ADAMS Public Documents
FOIA/PA-2003-0388 - Resp 2 - Partial.
Accession Number: ML040090490
Date Released: Tuesday, December 16, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML040090450 - FOIA/PA-2003-0388 - Resp 2 - Partial. (16 page(s), 12/8/2003)
- ML012570441 - Indian Point 2 Operating License Transfer; follow-up. (4 page(s), 9/14/2001)
- ML012740454 - IR 05000247/2001-008, Indian Point, Unit 2, Inspection on 07/01/2001- 08/18/2001 related to nuclear powerplant. maintenance operability evaluations, and cross-cutting issues. Non-cited violations noted. (31 page(s), 9/30/2001)
- ML012880481 - 10/15/2001 Response Letter Addressed to Mr. Fred Dacimo Re Indian Point 2 - NRC Inspection Schedule. (5 page(s), 10/15/2001)
- ML013460400 - Indian Point Units 1 & 2, Revision to Emergency Plan Procedures. (99 page(s), 11/19/2001)
- ML013510045 - Communications Summary for Final Significance Determination & Notice of Violation (NRC Inspection Report 05000247/2000-006). (21 page(s), 12/5/2001)
- ML020430500 - Licensees' Response to Riverkeeper, Inc.'s Section 2.206 Request for Emergency Shutdown of indian Point Units 2 and 3. (44 page(s), 2/11/2002)
- ML020950191 - Preliminary root cause investigation form Con-Ed SL1 Investigation & LER (22 page(s), 3/21/2002)
- ML020950207 - E-mail from D. Silk to B. Holian, P. Eselgroth, R. Conte, R. Crlenjak & S. Barber Subject: Fwd DPV re: Restart of Indian Point (2 page(s), 3/1/2002)
- ML020990196 - Indian Point Units 1 & 2 Revision to Emergency Plan Procedures. (128 page(s), 4/4/2002)
- ML021330367 - Transmittal of revised emergency plan implementing procedures TOC (revised 04/11/2002), IP-1023 (Revision 18), IP-1027 (Revision 16) & IP-1050 (Revision 3) for Indian Point Nuclear Generating Station. (103 page(s), 5/7/2002)
- ML021340261 - Proposed Director's Decision Under 10 CFR 2.206. (24 page(s), 5/16/2002)
- ML021500603 - Entergy Revision to Emergency Plan Implementing Procedures. (63 page(s), 5/24/2002)
- ML021630556 - IR 05000247-02-03, on 3/31-5/11/2002, Entergy Nuclear Operations, Inc.; Indian Point 2 Nuclear Power Plant. Initiating Events, Barrier Integrity, Emergency Preparedness, and Cross Cutting Issues. (28 page(s), 6/12/2002)
- ML021840383 - Indian Point Units 1 & 2 Revision to Emergency Plan Procedures. (175 page(s), 6/28/2002)
- ML022130098 - Revised EPIPs, including TOC, rev. 11 to IP-1024 & rev. 6 to IP-1030. (79 page(s), 7/11/2002)
- ML022280410 - Indian Point Nuclear Generating - Revised Emergency Plan Implementing Procedures. (60 page(s), 8/5/2002)
- ML022480383 - Indian Point Emergency Planning Docunment Update. (158 page(s), 8/26/2002)
- ML022600095 - 09/04/2002 Summary of Regulatory Performance Meeting with Entergy Nuclear Operations, Inc., (ENO), re: ENO's Performance Improvement Efforts. (3 page(s), 9/16/2002)
- ML022630099 - 2002/11/18-G20010508 - Alex Matthiessen Ltr. re Director's Decision Under 10 CFR Section 2.206 Petition for Emergency Shutdown of Indian Point Units 1, 2, & 3. (35 page(s), 11/18/2002)
- ML022740215 - Indian Point Units 1, 2 & 3 Combined Emergency Plan. Changes integrated & upgraded Units 1 & 2 plan with Unit 3 plan in combined site emergency plan for Indian Point Energy Center. (2 page(s), 9/26/2002)
- ML022970027 - Entergy Nuclear, Indian Point Nuclear Generating Station, Unit 2 Emergency Plan Implementing Procedures Document Update. (134 page(s), 10/10/2002)
- ML023090512 - IR 05000247-02-012, on 09/23/2002 - 09/27-2002, Indian Point Energy Center; Emergency Preparedness Exercise Evaluation. (12 page(s), 11/5/2002)
- ML023100502 - IR 05000247-02-006, on 8/11-9/28/2002, Entergy Nuclear Operations, Inc.; Indian Point 2 Nuclear Power Plant. Mitigating Systems. Non-Cited Violations Noted. (21 page(s), 11/6/2002)
- ML030060360 - Issuance of Order for Compensatory Measures Related to Access Authorization. (134 page(s), 1/7/2003)
- ML030160882 - Press Release-03-009: Initial NRC Reaction to Witt Report. (1 page(s), 1/16/2003)
- ML030410385 - Plant Service Lists Attachment to Order - Reactor Vessel Head and Nozzle Inspection. (68 page(s), 2/11/2003)
- ML030560391 - Strategic Teaming & Resource Sharing Comments & Concerns Related to Review of Emergency Preparedness at Indian Point & Millstone, Draft Dated January 10, 2003. (5 page(s), 2/19/2003)
- ML030590018 - LTR-03-0099 - Rep. Joseph Picciano Ltr. re: Radiological Emergency Preparedness Program - Indian Point Energy Center. (8 page(s), 2/21/2003)
- ML030770065 - IR 05000247-03-005, 05000286-03-003, on 12/11/02 - 12/13/02; 12/16/02 - 12/18/02; 01/13/03 - 01/16/03; 01/27/03 - 01/31/03; Indian Point Nuclear Generating Station; Special Inspection, Procedure 93812. (12 page(s), 3/17/2003)
- ML030770089 - IR 05000247-03-006 & 05000286-03-004, on 02/14/2003, Indian Point Energy Center; Temporary Instruction 2515/148, "Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures". (5 page(s), 3/17/2003)
- ML030800531 - 04/07/2003, Notice of Meeting with Entergy Nuclear Operations, Inc. (Indian Point) re: NRC Annual Assessment of safety performance at Indian Point Nuclear Generating Station. (6 page(s), 3/21/2003)
- ML030870904 - IR 05000247-03-004, on 01/27/03 - 02/14/03, Entergy Nuclear Operations, Inc., Indian Point 2, Safety System Design and Performance Capability. (21 page(s), 3/28/2003)
- ML030910625 - EA-03-039, Addressee List, (Order Issued by Program Office or OE for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel). (17 page(s), 4/29/2003)
- ML030940198 - Issuance of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel. (22 page(s), 4/29/2003)
- ML030970464 - 04/07/2003, Cancellation of Notice of Meeting with Entergy Nuclear Operations, Inc. re: NRC Annual Assessment of safety performance at Indian Point Nuclear Generating Station. (5 page(s), 4/7/2003)
- ML031010532 - 04/28/2003, Revised Notice of Meeting with Entergy Nuclear Operations, Inc. re: NRC Annual Assessment of safety performance at Indian Point Nuclear Generating Station. (6 page(s), 4/11/2003)
- ML031190622 - Emergency Plan Implementing Procedures Update. (7 page(s), 4/2/2003)
- ML031220048 - 2003/04/23-G20030216 - Robert D. Snook Ltr Ltr. re: 2.206 - Entergy Nuclear Operations, Inc. Request of Emergency Plans at Indian Point Energy Center Units 2 & 3 (121 page(s), 4/23/2003)
- ML031250103 - LTR-03-0261 - R. Paulison Ltr. re: Update to Offsite Emergency Response Planning & Preparedness Issues Identified for Indian Point Plant (7 page(s), 4/22/2003)
- ML031290100 - 04/28/2003, Summary of Annual Assessment Meeting with Entergy Nuclear Operations, Inc. (3 page(s), 5/8/2003)
- ML031330355 - Transmittal of Discussion Papers by Entergy Nuclear Operations, Inc. to Demonstrate there is no Basis for FEMA to Retract its Long-Standing "Reasonable Assurance"... (3 page(s), 5/1/2003)
- ML031330361 - Discussion Papers by Entergy Nuclear Operations, Inc. to Demonstrate there is no Basis for FEMA to Retract its Long-Standing "Reasonable Assurance" Meeting Minutes Through Dissenting Opinion on Commissioner Asselstine. (118 page(s), 5/1/2003)
- ML031340032 - IR 05000247-03-003, on December 29, 2002 - March 29, 2003, Entergy Nuclear Operations, Inc.; Indian Point 2 Nuclear Power Plant; Maintenance Risk Assessment/Emergent Work, Post Maintenance Testing; and Radioactive Material Processing and Transportation. (46 page(s), 5/13/2003)
- ML031340319 - Response to State of Connecticut's "Petition" for Withdrawal of FEMA's Approval of Indian Point Radiological Emergency Preparedness Plan. (35 page(s), 5/7/2003)
- ML031390345 - Indian Point Unit 2 Emergency Plan Implementing Procedures Update. (43 page(s), 5/6/2003)
- ML031410674 - Transmittal of Emergency Plan Implementing Procedures IP-EP-130, Revision 0, IP-EP-115, Revision 1, & Revised Table of Contents for Indian Point Nuclear Generating Station. (73 page(s), 3/13/2003)
- ML031430254 - Transmittal of Discussion Papers by Entergy Nuclear Operations, Inc. to Demonstrate there is no Basis for FEMA to Retract its Long-Standing "Reasonable Assurance" Finding.. Executive Summary Through Training/Exercises to be Completed. (171 page(s), 5/1/2003)
- ML031610958 - 2003/06/03-Supplement to Section 2.206 Request for Review of Indian Point Energy Center Units 2 & 3. (27 page(s), 6/3/2003)
- ML031681413 - Indian Point, Unit 2, Revision 3 to IP-EP-115, "Emergency Plan Forms." (65 page(s), 6/3/2003)
- ML031700473 - Indian Point, Emergency Planning Document Update. (26 page(s), 6/9/2003)
- ML031740470 - Indian Point Units 2 and 3, 2.206 Acknowledgement Letter, Entergy Nuclear Operations, Inc. Travers Request of Emergency Plans. (9 page(s), 7/3/2003)
- ML031890427 - Transcript of Telephone Conference on 06/19/2003 on 2.206 Petition on Emergency Planning. Pages 1-27. (29 page(s), 6/19/2003)
- ML031910435 - Indian Point, Emergency Plan Implementing Procedure. (15 page(s), 7/2/2003)
- ML031950451 - Indian Point Unit 2 - FEMA Exercise Report - Exercise Date 9/24/02. (154 page(s), 2/21/2003)
- ML032100504 - Transmittal of Revised Emergency Plan Implementing Procedures, Revision 0 to IP-EP-430, Personnel Accountability. (28 page(s), 7/22/2003)
- ML032100573 - Transmittal of Revision 20 of Indian Point Unit 2 Emergency Plan Implementing Procedure IP-1023, Operations Support Center. (62 page(s), 7/23/2003)
- ML032120521 - LTR-03-0488 - R. David Paulison, FEMA, Ltr transmitting the Federal Management Agency's determination of reasonable assurance that the off-site preparedness for the Indian Point Energy Center is adequate (4 page(s), 7/25/2003)
- ML032170114 - Transmittal of Indian Point Energy Center Emergency Plan Implementing Procedures Update. (67 page(s), 7/11/2003)
- ML012760485 - Feeder to Indian Point 3 Integrated Inspection Report No. 50-286/01-008 (5 page(s), 10/3/2001)
- ML012960441 - Feeder to Indian Point 3 Integrated Inspection Report No. 50-286/01-009 (5 page(s), 10/23/2001)
- ML013130735 - IR 05000286/2001-008, Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant. Resident inspection on 08/19/2001 - 09/29/2001 of areas related to gaseous and liquid effluents, radioactive material processing. No violations noted. (26 page(s), 11/9/2001)
- ML013650345 - IR 05000286/2001-009, Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant. Resident Inspection on 09/30-11/17/2001, related to radiation safety, emergency preparedness. Two noncited violations noted. (26 page(s), 12/31/2001)
- ML020440199 - IR 05000247/2001-011, on 11/18 - 12/29/2001, Entergy Nuclear Operations, Inc.; Indian Point 2 Nuclear Power Plant. Personnel Performance During Non-Routine Plant Events, Licensed Operator Requalification, and Cross-Cutting Issues. (33 page(s), 2/12/2002)
- ML021350146 - IR 05000247/2002-002, Indian Point 2 Nuclear Power Plant, Inspection on 02/10 - 03/30/2002, Related to Maintenance Risk Assessment and Cross Cutting Issues. Non-Cited Vilations Noted. (35 page(s), 5/14/2002)
- ML021340702 - IR 05000286/2002-002, on 02/17- 03/30/2002, Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant. Resident inspection report. No violations noted. (24 page(s), 5/14/2002)
- ML021790556 - IR 05000286-02-003, on 3/31-05/18//2002, Entergy Nuclear Northeast , Indian Point 3 Nuclear Power Plant. Resident Inspection report. (24 page(s), 6/28/2002)
- ML022120096 - IR 05000286-02-004, on 05/19 - 06/29/2002, Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant. Resident Inspection report. (28 page(s), 7/30/2002)
- ML022380396 - 2002 Indian Point 3 Mid-Cycle Performance Review and Inspection Plan. (6 page(s), 8/26/2002)
- ML022410064 - 2002 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Unit 2. (8 page(s), 8/28/2002)
- ML030630118 - 2003 Annual Assessment Letter - Indian Point Nuclear Generating Unit 2 (Report 50-286/2003001). (7 page(s), 3/3/2003)
- ML030630823 - Memo 1/10/03, D.C. Cook, Re: DRS Input to DRP IR 05000315-02-009 and 05000316-02-009. (10 page(s), 1/10/2003)
- ML031330771 - IR 05000286-03-002, on 12/29/2002 - 03/29/2003, for Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant. Integrated resident inspection report. (40 page(s), 5/13/2003)
- ML032110555 - IR 05000247-03-007, on March 30, 2003 - June 28, 2003, Entergy Nuclear Operations, Inc.; Indian Point 2 Nuclear Power Plant; Operability Evaluations; and Problem Identification and Resolution Samples. (35 page(s), 7/30/2003)
- ML032160635 - IR 05000286-03-006, on 03/30/2003 - 06/28/03, Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant. Operability Evaluations; Refueling and Outage Activities; Event Follow-up. (55 page(s), 8/4/2003)
- ML033600096 - Slides - Emergency Planning - Indian Point Energy Center. (14 page(s), 4/30/2003)
- ML033600097 - Letter from Fred Dacimo, Entergy, to the NRC, providing revision to emergency plan procedures. (190 page(s), 10/1/2001)
- ML033600098 - Letter from Fred Dacimo to NRC, providing revision to emergency plan procedures. (160 page(s), 2/19/2002)
- ML033600099 - Emergency Plan for Indian Point, Unit Nos. 1 & 2, Revision 01-02. (206 page(s), 10/18/2001)
- ML033600100 - Emergency Planning Document Update. (187 page(s), 8/30/2002)
- ML033600101 - Draft Press Release, with handwritten notes. (2 page(s), 12/8/2003)
- ML033600102 - Draft Press Release, with handwritten notes. (3 page(s), 12/8/2003)
- ML033600110 - E-mail from John McGrath to Brian Holian re updated question. (3 page(s), 3/13/2003)
- ML033600113 - E-mail from William Dean to various addressees, regarding Briefing for Chairman. (1 page(s), 4/23/2003)
- ML033600116 - E-mail from Scott Morris to addressees, re Updated NRC Statement re: Indian Point & FEMA. (2 page(s), 6/19/2003)
- ML033600118 - Note re results of FEMA review of offsite emergency preparedness plans and procedures. (2 page(s), 6/24/2003)
- ML033600120 - Handwritten note to Maria, attaching e-mail from W. Dean to K. Jackson, with attached e-mail from John Jolicoeur to John Craig, regarding draft statement. (4 page(s), 6/30/2003)
- ML033600122 - E-mail from Kia Jackson to Christopher Jackson regarding Draft Statement re FEMA announcement. (4 page(s), 6/30/2003)
- ML033600123 - E-mail from Catherine Haney to Christopher re updated NRC statement re Indian Point & FEMA. (4 page(s), 6/30/2003)
- ML033600125 - Draft press release, with handwritten notes. (2 page(s), 7/1/2003)
- ML033600126 - Draft press release, with handwritten notes. (2 page(s), 7/1/2003)
- ML033600128 - E-mail from Christopher Jackson to Vicki Bolling and Maria Lopez-Otin re FEMA insert. (2 page(s), 7/2/2003)
- ML033600129 - Draft Press Release, with handwritten notes. (3 page(s), 7/2/2003)
- ML033600130 - Handwritten note, attaching e-mail from W. Beecher to Nils Diaz regarding draft press release, with attached draft release. (3 page(s), 7/15/2003)
- ML033600131 - Draft Press Release, with handwritten notes. (2 page(s), 7/3/2003)
- ML033600132 - E-mail from W. Beecher to Nils Diaz re draft press release with handwritten notes. (2 page(s), 7/3/2003)
- ML033600134 - E-mail from W. Beecher to various addressees, re press release on Indian Point. (2 page(s), 7/25/2003)
- ML033600136 - E-mail from Lawrence Chandler to Maria Lopez-Otin re Follow-up to FEMA's IP announcement. (1 page(s), 7/29/2003)
- ML033600140 - E-mail from Lawrence Chandler to Paul Lohaus regarding Pataki commitments search. (7 page(s), 7/30/2003)
- ML033600141 - E-mail from Lawrence Chandler to Roger Davis and Maria Lopez-Otin re Chairman's request. (1 page(s), 7/30/2003)