Home > NRC Library > ADAMS Public Documents
FOIA/PA-2003-0018 - Resp 3 - Partial.
Accession Number: ML031050347
Date Released: Tuesday, April 8, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML031040102 - FOIA/PA-2003-0018 - Resp 3 - Partial. (6 page(s), 3/31/2003)
- ML031040105 - Notes on telecon with authors of GSI-191 study. (2 page(s), 3/31/2003)
- ML031040108 - Computations on failure pressure of as-found cavity FENOC Cavity Analysis with handwritten notes. (1 page(s), 3/31/2003)
- ML031040111 - Handwritten notes on Industry history of RCS pressure transients (ORNL search results of SCSS databases). (2 page(s), 3/31/2003)
- ML031040116 - Handwritten notes & computations on B&W plant operating histories. (6 page(s), 3/31/2003)
- ML031040121 - E-mail from Steven Long to Douglas Pickett re Davis-Besse risk assessment telecon. (2 page(s), 4/23/2002)
- ML031040126 - Slides: Root Cause Analysis of Reactor Pressure Vessel Head Degradation at Davis-Besse Nuclear Power Station by FENOC. (45 page(s), 5/7/2002)
- ML031040127 - Davis-Besse 0350 Panel Agenda for May 1, 2002 Meeting. (1 page(s), 5/1/2002)
- ML031040130 - E-mail from Steven Long to Michael Johnson re Definition of Davis-Besse Risk Question & Data Needs. (1 page(s), 5/7/2002)
- ML031040138 - E-mail from Douglas Pickett re Davis-Besse Tele-Conference scheduled for 2:00 p.m, 05/28/02. (7 page(s), 5/28/2002)
- ML031040142 - E-mail from Douglas Pickett re Davis-Besse Safety Significance Telecon. (2 page(s), 5/29/2002)
- ML031040164 - Slides: MRP Update to ACRS Materials Subcommittee with attached handwritten notes by S. Long, NRR. (29 page(s), 6/5/2002)
- ML031040172 - E-mail from Douglas Pickett re Davis -Besse Telecon. (2 page(s), 6/20/2002)
- ML031040173 - E-mail from Steven Long re Meetings. (1 page(s), 7/8/2002)
- ML031040177 - E-mail from Steven Young to Dwight Snowberger re Conference Call. (2 page(s), 7/8/2002)
- ML031040179 - E-mail from Steven Long re Conference Call Time Change. (2 page(s), 7/9/2002)
- ML031040150 - Handwritten comment on Preliminary FENOC submission titled Responses to NRC Staff Comments & Questions on Davis-Besse Safety Significance Assessment (SIA-W-DB-01Q-301). (38 page(s), 7/13/2002)
- ML031040176 - E-mail from Steven Long to Micheal Johnson re Davis-Besse SDP Status Slides - Revised. (1 page(s), 7/17/2002)
- ML031040182 - E-mail from Jim Dyer re Davis-Besse SDP Status Update. (4 page(s), 7/19/2002)
- ML031040191 - Status of SDP Risk Assessment for License Performance Deficiency that resulted in cavity in Davis-Besse RPB head with attachment Regulatory Guide 1.174. (26 page(s), 7/25/2002)
- ML031040194 - E-mail from Steven Long to Douglas Pickett re Details for Discussion with FENOC this week. (2 page(s), 7/30/2002)
- ML031040195 - E-mail from Steven Long re First-draft D-B SDP. (1 page(s), 8/8/2002)
- ML031040197 - E-mail from Steven Long to Mark Kirk re current Draft of Preliminary SDP for Davis-Besse. (1 page(s), 8/12/2002)
- ML031040199 - E-mail from Steven Long to Micheal Johnson re As-Is Draft Davis-Besse SDP. (1 page(s), 8/14/2002)
- ML031040200 - E-mail Steven Long to Laura Collins re Highly Predecisional D-B SDP. (1 page(s), 8/14/2002)
- ML031040201 - E-mail from Steven Long to Gary Demoss re Current Drafts of D-B SDP. (1 page(s), 8/20/2002)
- ML031040204 - E-mail from Steven Long to Michael Marshall re Working Meeting on PRV Top Head PFM. (1 page(s), 8/22/2002)
- ML031040209 - E-mail from M Leisure to John Hopkins re NRC Request: Re Cavity Mold, with attached handwritten notes and computations by S. Long, NRR. (4 page(s), 8/23/2002)
- ML031040211 - E-mail from Micheal Johnson to Steven Long re ET Slides. (1 page(s), 9/9/2002)
- ML031040213 - E-mail from Micheal Johnson re ET Update-Davis-Besse Risk Assessment. (2 page(s), 9/10/2002)
- ML031040220 - E-mail from Steven Long to Micheal Johnson re Revisions to slides for EDO Briefing. (1 page(s), 9/11/2002)
- ML031040221 - E-mail from Steven Long to Mark Kirk re Deputy EDO Briefing. (1 page(s), 9/16/2002)
- ML031040223 - E-mail from Steven Long to Sonia Burgess re Draft TIA Response. (1 page(s), 9/20/2002)
- ML031040229 - E-mail from Steven Long to John Grobe re Draft TIA Response. (1 page(s), 10/17/2002)
- ML031040231 - E-mail from Mark Kirk to Steven Long re Some Comments. (1 page(s), 8/12/2002)
- ML031040241 - E-mail from Ellis Merschoff to Brain Sheron re Davis Besse Reactor head Degradation SDP. (1 page(s), 8/31/2002)
- ML031050313 - Memo from Mark Kirk to N Chokshi re Status of ORNL Calculations of Burst Pressure for Cavities that Larger than Cavity Found at Davis-Besse. (5 page(s), 8/5/2002)
- ML031040253 - Letter to NRC from Guy Campbell re Responses to Requests for Additional Information Concerning NRC Bulletin 2001-01, "Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles." (37 page(s), 10/30/2001)
- ML031040262 - E-Mail from Ellis Merschoff to Brain Sheron re Food for Thought-Davis-Besse. (1 page(s), 8/20/2002)
- ML031040275 - E-Mail from Ellis Merschoff to Jim Dyer re Food for Thought-Davis-Besse. (1 page(s), 8/23/2002)
- ML031040276 - E-Mail from Mark Kirk to Steven Long re Probabilistic Calculations for Davis-Besse. (2 page(s), 5/31/2002)
- ML031040283 - E-mail Edwin Hackett to Art Howell re Info & Proxy. (1 page(s), 7/21/2002)
- ML031040290 - Letter from NRC from Guy Campbell re Transmittal of Davis-Besse Nuclear Power Station Risk Assessment of Control Rod Drive Mechanism Nozzle Cracks with handwritten notes. (18 page(s), 11/1/2001)
- ML031040196 - Letter to Jim Dyer from Howard Bergendahl re Confirmatory Action Letter Response - Root Cause Analysis Report with handwritten notes. (181 page(s), 4/18/2002)
- ML031040202 - Letter to J Dyer from Howard Bergandahl re Safety Significance Assessment of Davis-Besse Nuclear Power Station Unit 1 Reactor Pressure Vessel Head Degradation with handwritten notes. (31 page(s), 4/8/2002)
- ML031040205 - E-Mail from Sonia Burgess to Christine Lipa re Draft TIA Response. (3 page(s), 9/23/2002)
- ML031040222 - E-Mail from Mark Kirk to Steven Long re Failure Model for DB. (32 page(s), 7/3/2002)
- ML031040235 - ORNL/NRC/LTR-, "Stochastic Failure Model for Davis-Besse RVP Head." (44 page(s), 8/31/2002)
- ML031040251 - ORNL/NRC/LTR-, "Stochastic Failure Model for Davis-Besse RVP Head." (52 page(s), 9/30/2002)