Home > NRC Library > ADAMS Public Documents
FOIA/PA-2001-0256 - Resp 2 - Partial.
Accession Number: ML012060339
Date Released: Monday, July 30, 2001
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML012050495 - FOIA/PA-2001-0256 - Resp 2 - Partial. (8 page(s), 7/20/2001)
- ML012050521 - Status report for Region I actions regarding prep of response to Con Ed Denial of NOV. (5 page(s), 1/30/2001)
- ML012050523 - Steam Generator. (2 page(s), 1/25/2001)
- ML012050527 - Forward response to IP-2 1997 S/G Inspection Issue - 2.206. (2 page(s), 6/1/2001)
- ML012050530 - Forward modified IP2 SBTR Panel Record. (1 page(s), 3/12/2001)
- ML012050532 - Forward modified IP2 SGTR Panel Record. (1 page(s), 3/12/2001)
- ML012050535 - Forward modified IP2 SGTR Panel Record. (1 page(s), 3/12/2001)
- ML012050537 - Forward amended ARB form regarding IP2 S/G inspection issue. (1 page(s), 2/28/2001)
- ML012050541 - Forward IP-2 S/G ARB Form. (1 page(s), 2/27/2001)
- ML012050553 - Forward information regarding IP2- FYI. (1 page(s), 2/20/2001)
- ML012060013 - Forward amended IP-2 SGTR Panel Record. (1 page(s), 3/13/2001)
- ML012060015 - Request a copy of the final ARB close-out note. (1 page(s), 2/27/2001)
- ML012060017 - Forward information regarding 02-27-01 meeting concerning IP-2 S/G ARB. (1 page(s), 2/26/2001)
- ML012060018 - Forward information on IP2. (1 page(s), 2/22/2001)
- ML012060029 - Forward information regarding ARB of IP-2 1997 S/G Inspection Issue. (1 page(s), 2/22/2001)
- ML012060032 - Forwards seven considerations regarding ARB. (1 page(s), 1/9/2001)
- ML012060034 - Forward information regarding IP-2 S/G Inspection Issue. (1 page(s), 1/9/2001)
- ML012060039 - Forward imformation regarding IP-2 S/G Inspection Issue. (1 page(s), 1/5/2001)
- ML012060040 - Forward information regarding conference call on IP-2 SG issues. (1 page(s), 1/4/2001)
- ML012060042 - Forward information regarding repanel for IP-2 SG Issue. (1 page(s), 12/19/2000)
- ML012060052 - Forward Information regarding RI-2000-A-XXXX. (1 page(s), 11/14/2000)
- ML012060055 - Inform of TA Brief meeting next week. (21 page(s), 8/18/2000)
- ML012060060 - Inform of meeting with staff on IP-2. (1 page(s), 7/17/2000)
- ML012060061 - Summary of the Indian Point Unit 2 Special Team Inspection of the February 15, 2000, Steam Generator Tube Failure Event . (2 page(s), 8/25/2000)
- ML012060144 - Indian Point 2 Response to Violation. (8 page(s), 1/29/2001)
- ML012060148 - Forward information discuss earlier regarding C-3 (TS). (2 page(s), 3/25/2000)
- ML012060158 - Regulatory Conference for Indian Point 2 Steam Generator Special Inspection. (20 page(s), 7/20/2001)
- ML012060162 - Steam Generator Tube Inservice Surveillance. (9 page(s), 7/20/2001)
- ML012060169 - NRC IP-2 Restart. (10 page(s), 7/20/2001)
- ML012060172 - Summary to the Indian Point Unit 2 Special Steam Generator Team Preliminary Red Inspection Finding. (3 page(s), 7/20/2001)
- ML012060175 - Steam Generator Special Inspection - Communication Plan Questions & Answers for Indian Point 2. (8 page(s), 7/20/2001)
- ML012060178 - Quick Look at Indian Point 2 Inservice Inspection. (2 page(s), 7/20/2001)
- ML012060180 - Inform that the committees of New York State Assembly are holding hearings to examine safety concern of recent steam generator tube failure at Indian Point 2. (4 page(s), 3/2/2000)
- ML012060030 - Forward EDO Highlight Input for 03-02-2000 for Indian Point Unit 2. (1 page(s), 7/20/2001)
- ML012060038 - Status of Steam Generator Inspection Program. (3 page(s), 4/11/2000)
- ML012060049 - Westinghouse Presentation to Con Edison on the Status of Steam Generator Conditioning Monitoring and Operational Assessments of the Indian Point Unit 2 Steam Generators. (3 page(s), 4/14/2000)
- ML012060054 - Forward IP-2 Steam Generators. (1 page(s), 7/20/2001)
- ML012060094 - Support of IP2 Onsite Review. (1 page(s), 4/20/2000)
- ML012060095 - Informs of 04-20-00 call regarding IP2 SG. (1 page(s), 4/21/2000)
- ML012060104 - Informs of 04-24-00 call regarding IP2 SG. (1 page(s), 4/24/2000)
- ML012060106 - Inform of IP2 SG Meeting. (1 page(s), 5/4/2000)
- ML012060122 - Indian Point 2 Generation Station - NRC Inspection Report No. 05000247/2000-06. (27 page(s), 7/14/2000)
- ML012060133 - NRC Integrated Inspection Report 50-247/97-07 and Notice of Violation. (49 page(s), 7/16/1997)
- ML012060137 - Forward NRR comments. (1 page(s), 7/18/2000)
- ML012060142 - Forwards comments on Q' and A's regarding IP2 Special inspection. (1 page(s), 7/26/2000)
- ML012060145 - Preliminary results of NRC special inspection steam generator tube failure. (3 page(s), 7/27/2000)
- ML012060151 - Forward W 4 loop for Indian Point Unit 2. (3 page(s), 7/20/2001)
- ML012060156 - Forward IP2 SGTR Analysis. (1 page(s), 8/7/2000)
- ML012060161 - Forward input on inspection report. (1 page(s), 6/16/2000)
- ML012060167 - Indian Point 2 - Steam Generator Special Inspection - Communication Plan Questions & Answers. (9 page(s), 7/20/2001)
- ML012060176 - Forward 6-20-00 telconf regarding IP2 on material properties used in U bend burst pressure analyses for prediction of burst pressures. (1 page(s), 6/26/2000)
- ML012060183 - Forward information regarding ARB of IP2 1997 S/G inspection Issue. (1 page(s), 2/20/2001)
- ML012060027 - Forward Westinghouse information on 1997 IP2 SG Inspections. (1 page(s), 2/1/2001)
- ML012060033 - Special Inspection Plan Indian Point 2. (3 page(s), 6/5/2000)
- ML012060105 - Forward Pre-Meeting Agenda for Indian Point Unit 2 ECT Inspection Results Regulatory Conference. (8 page(s), 9/20/2000)
- ML012060107 - E-mail from M. Modes to D. Lew re Summary of S/G Eddy Current Performance Issues. (1 page(s), 3/30/2000)
- ML012060114 - Significance Determination Risk Assessment for Indian Point Unit 2 Steam Generator Inspection Findings - Review of Licensee response to Initial Significance Determination & Final Staff Analysis. (11 page(s), 7/20/2001)
- ML012060116 - Memo from S. Long to R. Barrett re Risk Assessment for Condition of Indian Point Unit 2 Steam Generator Tubes During Operational Cycle 14. (7 page(s), 7/20/2001)
- ML012060120 - Significance Determination Risk Assessment for Indian Point Unit 2 Steam Generator Inspection Findings - Review of Licensee Response to Initial Significance Determination & Final Staff Analysis. (11 page(s), 7/20/2001)
- ML012060126 - Draft Significance Determination Risk Assessment for Indian Point Unit 2 Steam Generator Inspection Findings - Review of Licensee Response to Initial Significance Determination & Final Staff Analysis. (8 page(s), 10/29/2000)
- ML012060131 - Indian Point Unit 2 SGT Failure Risk Perspective. (3 page(s), 7/20/2001)
- ML012060136 - SGTF Final Risk Assessment. (3 page(s), 7/20/2001)
- ML012060141 - Significance Determination Risk Assessment for Indian Point Unit 2 Hypothetical Case Loss of Safeguards Electrical Bus 6A Coincident with Steam Generator Tube Rupture. (20 page(s), 9/21/2000)
- ML012060165 - Draft memo from G. Barber to A. Blough re Use of NRC Region I Supplement "Revised Reactor Oversight Program Preliminary Evaluation of Indian Point Unit 2" during May 2000 Senior Management Meeting to Provide Additional, Preliminary Assessment. (19 page(s), 4/24/2000)
- ML012060210 - IP-2 February 2000 AIT. (10 page(s), 7/20/2001)
- ML012060241 - Draft Significance Determination Risk Assessment for Indian Point Unit 2 Steam Generator Inspection Findings - Review of Licensee Response to Initial Significance Determination & Final Staff Analysis. (12 page(s), 10/29/2000)
- ML012060245 - E-mail from D. Gaynor to J. Trapp re IP2 Risk Assessment. (1 page(s), 2/24/2001)
- ML012060249 - Initiating Event Assessment. (5 page(s), 2/17/2000)
- ML012060261 - E-mail from J. Harold to S. Black & W. Ruland re Con Ed Phone Call on 02/23/2000 re Con Ed's Steam Generator Inspection/recovery Plan & Interpretation of TS 3.1.F.2.a.(2). (9 page(s), 2/23/2000)
- ML012060263 - E-mail from T. Shedlosky to B. Holian, I. Jung, J. Trapp, & P. Eselgroth re Indian Point Unit 2 SGTR - Licensee Preliminary Risk Estimate. (1 page(s), 2/17/2000)
- ML012060227 - Significance Determination Risk Assessment for Indian Point Unit 2 Hypothetical Case Loss of Safeguards Electrical Bus 6A Coincident with Steam Generator Tube Rupture. (36 page(s), 9/21/2000)
- ML012060246 - Consolidated Edison Company of New York 09/26/2000 NRC Regulatory Conference presentation slides "Indian Point 2." (28 page(s), 9/26/2000)
- ML012060256 - Risk Significance. (1 page(s), 7/20/2001)
- ML012060259 - Draft Significance Determination Risk Assessment for Indian Point Unit 2 Steam Generator Inspection Findings - Review of Licensee Response to Initial Significance Determination & Final Staff Analysis. (9 page(s), 10/23/2000)
- ML012060189 - Significance Determination Risk Assessment for Indian Point Unit 2 Steam Generator Inspection Findings - Review of Licensee Response to Initial Significance Determination & Final Staff Analysis. (11 page(s), 10/24/2000)
- ML012060193 - Significance Determination Risk Assessment for Indian Point Unit 2 Steam Generator Inspection Findings - Review of Licensee Response to Initial Significance Determination & Final Staff Analysis. (10 page(s), 7/20/2001)
- ML012060204 - Indian Point 2 Model - Steam Generator Tube Rupture Sequences. (11 page(s), 7/20/2001)
- ML012060221 - Indian Point 2 Model - Steam Generator Tube Rupture Sequences. (9 page(s), 7/20/2001)
- ML012060224 - Containment Design Perspectives. (1 page(s), 7/20/2001)
- ML012060230 - Containment Design Perspectives. (1 page(s), 7/20/2001)
- ML012060233 - Containment Design Perspectives. (1 page(s), 7/20/2001)
- ML012060242 - 0280 10.5-4. (1 page(s), 7/20/2001)
- ML012060244 - 0280 10.5-5. (1 page(s), 7/20/2001)
- ML012060248 - 0280 10.5-17. Figure 10.5-2 "Safety/Relief Valve Controls." (1 page(s), 7/20/2001)
- ML012060260 - Monte Carlo Analysis. (4 page(s), 7/20/2001)
- ML012060223 - Depth of Cracks. (5 page(s), 7/20/2001)
- ML012060225 - Indian Point Unit 2 SGTF Leak Rate Calculation. (1 page(s), 7/20/2001)
- ML012060240 - Presentation Slides from 08/30/2000 ACRS Briefing on Indian Point 2 Events. (23 page(s), 8/30/2000)
- ML012060282 - Facsimile to B. Holian transmitting Con Edison Calculation/Analysis, "Estimated Primary to Secondary Leakage During Tube Rupture Event." (21 page(s), 10/2/2000)
- ML012060290 - IP2 SGTL Risk Analysis. (7 page(s), 7/20/2001)
- ML012060305 - IP2 SGTL Risk Analysis. (5 page(s), 7/20/2001)
- ML012060311 - SDP Phase 1 screening worksheet. (3 page(s), 4/21/2000)
- ML012060309 - Pre-Meeting Agenda for 09/20/2000 Indian Point Unit 2 ECT Inspection Results Regulatory Conference. (11 page(s), 9/20/2000)
- ML012060312 - Risk Significance. (1 page(s), 7/20/2001)
- ML012060316 - Risk Significance. (1 page(s), 7/20/2001)
- ML012060319 - Risk Significance. (1 page(s), 7/20/2001)
- ML012060275 - Indian Point Unit 2 Steam Generator Tube Failure. (10 page(s), 2/15/2000)
- ML012060284 - Risk Assessment for IP2 SG Tube Degradation Leading to SG Tube Failure on February 14. 2000. (1 page(s), 2/14/2000)
- ML012060288 - Guess at Basis for Licensee's Disagreement. (1 page(s), 8/22/2000)
- ML012060293 - Risk Significance. (2 page(s), 7/20/2001)
- ML012060300 - Risk Significance. (1 page(s), 7/20/2001)
- ML012060308 - Risk Significance. (1 page(s), 7/20/2001)
- ML012060387 - Risk Assessment for Indian Point Unit 2 Hypothetical Case Loss of Safeguards Electrical Bus 6A Coincident with Steam Generator Tube Rupture. (2 page(s), 8/17/2000)
- ML012060393 - Event 1: Reactor Trip & Partial Loss of Vital Power August 31, 1999. Event 2: Steam Generator Tube Failure February 15, 2000. (11 page(s), 7/20/2001)
- ML012060395 - Risk Significance. (1 page(s), 7/20/2001)
- ML012060396 - Risk-Based Performance Indicator Milestones. (3 page(s), 7/20/2001)
- ML012060398 - Indian Point Unit 2 Steam Generator Tube Failure. (13 page(s), 2/15/2000)
- ML012060404 - IP2 SGTL Risk Analysis. (7 page(s), 7/20/2001)
- ML012060405 - E-mail to J. Trapp from D. Gaynor re follow up from SDP discussion. (1 page(s), 6/2/2000)
- ML012060281 - Indian Point Unit 2 Steam Generator Tube Failure. (13 page(s), 2/15/2000)
- ML012060283 - Speakers Notes Slides 10 & 11. (3 page(s), 7/20/2001)
- ML012060322 - E-mail from V. Ordaz to A. Madison, B. Bateman, D. Coe re IP2 SGTF PreCaucus/SERP Meeting on October 5, 2000. (2 page(s), 10/4/2000)
- ML012060328 - Region I comments on preliminary results of Phase 1 RBPI development. (2 page(s), 7/20/2001)
- ML012060330 - Risk Significance IP2 SGTF Actual Event Significance (CCDP). (1 page(s), 7/20/2001)
- ML012060332 - Indian Point Unit 2 SGT Failure Risk Perspective. (2 page(s), 7/20/2001)
- ML012060334 - Speakers Notes Slide 1 - Side 11. (12 page(s), 7/20/2001)