Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Change Notice 01-003

Issue Date: 02/05/01

NRC INSPECTION MANUAL IIPB

All Files in ZIP Format cn 01-003.zip


This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

DELETED: TRANSMITTED:
Number Date Number Date
1. IMC 0609, App. A 12/28/00 IMC 0609, App. A 02/05/01
2. TI 2515/133 03/15/96
3. TI 2515/136 09/30/97
4. TI 2515/137, Rev.1 03/09/98


TRAINING: No special training requirements have been identified for any documents issued with this change notice.
REMARKS:
IMC 0609, App. A (Significance Determination of Reactor Inspection Findings For At-Power Situations) has been revised to correct formatting problems with charts and tables, and to make minor editorial changes.
TI 2515/133 (Implementation of Revised 49 CFR Parts 100-179 and 10 CFR Part 71) is deleted. The inspection requirements for this TI have been completed.
TI 2515/136 (Operation of Dual Function Containment Isolation Valves) is deleted. The inspection requirements for this TI have been completed.
TI 2515/137, Rev. 1 (Inspection of Medium-Voltage and 480 Volt Air Circuit Breakers) is deleted. The inspection requirements for this TI have been completed.
DISTRIBUTION: Standard

END

Page Last Reviewed/Updated Thursday, July 02, 2015

Page Last Reviewed/Updated Thursday, July 02, 2015