The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Regulatory Issue Summaries - 2000

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
RIS-00-25 Potential Deficiency in Qualification of Okonite Single-Conductor Electrical Control Cables -- 12/26/2000 --
RIS-00-24 Concerns about Offsite Power Voltage Inadequacies and Grid Reliability Challenges Due to Industry Deregulation -- 12/21/2000 --
RIS-00-23 Recent Changes to Uranium Recovery Policy -- 11/30/2000 --
RIS-00-22 Issues Stemming from NRC Staff Review of Recent Difficulties Experienced in Maintaining Steam Generator Tube Integrity -- 11/03/2000 --
RIS-00-21 Changes to the Unplanned Scram and Unplanned Scram with Loss of Normal Heat Removal Performance Indicators -- 10/31/2000 --
RIS-00-20 Importance of Industry Providing NRC Advance Notice of Intent to Pursue License Renewal W 81 FR 73448
10/25/2016
--
-- 11/14/2000 --
RIS-00-19 Partial Release of Reactor Site for Unrestricted Use Before NRC Approval of the License Termination Plan -- 10/24/2000 --
RIS-00-18 Guidance on Managing Quality Assurance Records in Electronic Media -- 10/23/2000 --
RIS-00-17 Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff -- 09/21/2000 --
RIS-00-16 Availability of the Reactor Vessel Integrity Database Version 2.0.1 -- 09/07/2000 --
RIS-00-15 Recommendations for Ensuring Continued Safe Plant Operation and Minimizing Requests for Enforcement Discretion During Extreme Weather Conditions -- 09/07/2000 --
RIS-00-14 Preparation and Scheduling of Operator Licensing Examinations W 81 FR 31969
05/20/2016
--
  09/06/2000
RIS-00-13 Annual Report on the Effectiveness of Training in the Nuclear Industry for Calendar Year 1999 -- 08/18/2000 --
RIS-00-12 Resolution of Generic Safety Issue B-55, "Improved Reliability of Target Rock Safety Relief Valves" -- 08/07/2000 --
RIS-00-11 NRC Emergency Telecommunications System S2 01/28/2021 --
S1 03/22/2001 --
-- 06/30/2000 --
RIS-00-10 Technical Information to Facilitate Public Access to the U. S. Nuclear Regulatory Commission's Agencywide Documents Access and Management System (ADAMS) ERRATA 08/07/2000 --
-- 06/30/2000 --
RIS-00-09 Standard Review Plan for Licensee Requests to Extend the Time Periods Established for Initiation of Decommissioning Activities -- 06/26/2000 --
RIS-00-08 Voluntary Submission of Performance Indicator Data 1 02/19/2009 --
-- 02/19/2009 --
RIS-00-07 Use of Risk-Informed Decisionmaking in License Amendment Reviews [superseded by RIS 2001-02] -- 03/28/2000 --
RIS-00-06 Consolidated Line Item Improvement Process For Adopting Standard Technical Specifications Changes for Power Reactors -- 03/20/2000 --
RIS-00-05 Resolution of Generic Safety Issue 165, Spring-Actuated Safety and Relief Valve Reliability -- 03/16/2000 --
RIS-00-04 Operating Reactor Licensing Action Estimates W 81 FR 73448
10/25/2016
--
-- 03/16/2000 --
RIS-00-03 Resolution of Generic Safety Issue 158: Performance of Safety-Related Power-Operated Valves Under Design Basis Conditions -- 03/15/2000 --
RIS-00-02 Closure of Generic Safety Issue 23, Reactor Coolant Pump Seal Failure -- 02/15/2000 --
RIS-00-01 Changes Concerning Foreign Ownership, Control, or Domination of Nuclear Reactor Licensees -- 02/01/2000 --

To top of page

Page Last Reviewed/Updated Thursday, March 25, 2021