Control of Heavy Loads (Generic Letter 80-113)
GL80113 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 December 22, 1980 TO ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPERATING LICENSES AND HOLDERS OF CONSTRUCTION PERMITS* Gentlemen: Subject: Control of Heavy Loads In January 1978, the NRC published NUREG-0410 entitled, "NRC PRogram for the Resolution of Generic Issues RElated to Nuclear Power Plants - Report to Congress." As part of this program, the Task Action Plan for Unresolved Safety Issue Task No. A-36, "Control of Heavy Loads Near Spent Fuel," was issued. We have completed our review of load handling operations at nuclear power plants. A report describing the results of this review has been issued as NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants - Resolution of TAP A-36." This report contains several recommendations to be implemented by all licensees and applicants to ensure the safe handling of heavy loads. The purpose of this letter is to request that you review your controls for the handling of heavy loads to determine the extent to which the guidelines of Enclosure 1 are presently satisfied at your facility, and to identify the changes and modifications that would be required in order to fully satisfy these guidelines. To expedite your compliance with this request, we have enclosed the following: NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" (Enclosure 1). Staff Position - Interim Actions for Control of Heavy Loads (Enclosure 2). Request for Additional Information on Control of Heavy Loads (Enclosure 3). * With the exception of licensees for Indian Point 2 and 3, Zion 1 and 2 and Three Mile Island 1 (These were previously sent a letter) . - 2 - December 22, 1980 You are requested to implement the interim actions described in Enclosure 2 as soon as possible but no later than 90 days from the date of this letter. In order to enable the NRC to determine whether operating licenses should be modified (10 CFR 50.54 (f)), operating reactor licensees are requested to provide the following: 1. Submit a report documenting the results of your review and the required changes and modifications. This report should include the information identified in Sections 2.1 through 2.4 of Enclosure 3, on how the guidelines of NUREG-0612 will be satisfied. This report should be submitted in two parts according to the following schedule: - Submit the Section 2.1 information within six months from the date of this letter. - Submit the Sections 2.2, 2.3 and 2.4 information within nine months. 2. Furnish confirmation within six months that implementation of those changes and modifications you find are necessary will commence as soon as possible without waiting staff review, so that all such changes, beyond the above interim actions, will be completed within two years of submittal of Section 2.4 for the above report. 3. Furnish justification within six months for any changes or modifications that would be required to fully satisfy the guidelines of Enclosure 1 which you believe are not necessary. The criteria in NUREG-0612 are also applicable to applicants for operating licenses. Such applicants are expected to provide the information requested by item 1 above and to meet the same schedule of implementation as indicated in 2 above. Any item for which the implementation date is prior to the expected date of issuance of an operating license will be considered to be a prerequisite to obtaining that license. For any date that cannot be met, furnish a proposed revised date, justification for the delay, and any planned compensating safety actions during the interim. . - 3 - This request for information was approved by GAO under a blanket clearance number ROO72 which expires November 30, 1983. Comments on burden and duplication may be directed to the U.S. General Accounting Office, Regulatory Reports Review, Room 5106, 441 G Street, N.W., Washington, D.C. 20548. Sincerely, Darrell G. Eisenhut, Director Division of Licensing Enclosures: 1. NUREG-0612 2. Staff Position 3. Request for Additional Information cc: w/o Enclosure (1) Service List
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021