Inservice Inspection Programs for Prestressed Concrete Containment Structures (Generic Letter 80-101)
GL80101 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 November 25, 1980 TO OPERATING REACTORS WITH PRESTRESSED CONCRETE CONTAINMENT STRUCTURES Gentlemen: SUBJECT: Inservice Inspection Programs for Prestressed Concrete Containment Structures The Office of Standards Development is in the process of awarding a contract to Oak Ridge National Laboratories to compile and review the containment inservice inspection (ISI) records of all operating nuclear power plants with greased prestressing tendons. The purpose of this contract is to assess the data accumulated to date on the ISI of greased tendons in containments, and to determine the effectiveness of these programs. The contractor will review Regulatory Guides 1.35 and 1.35.1 and the relevant draft of the ASME Section XI Working Group on ISI of Concrete Pressure Components. In addition, the contractor is being asked to visit a few sites to observe the ISI of greased prestressing tendons. The contractor will then be asked to make recommendations to improve the existing programs. With this letter, we are requesting voluntary submissions of existing data, summaries and records of the ISI tests of containments with greased pre- stressing tendons, which should contain the following information: a. Sample size and method of sample selection, b. Procedure for lift-off testing, c. Procedure for testing of corrosion inhibiter (i.e., grease), d. Procedure for tendon material testing, e. Acceptance and rejection criteria used for the test program, and f. Repair, replacement and corrective actions. Information already reported to the NRC need not be included. We also welcome any comments, observations or suggestions you may consider relevant to this effort. In your response please indicate any ISI tests planned between December 1980 and June 1981 that our contractor could observe. . - 2 - November 25, 1980 The above information should be sent to, Chief, Structures and Components Standards Branch, Office of Standards Development, U.S. Nuclear Regulatory Commission, Washington. D.C. 20555 by December 31, 1980. For further information concerning this project, contact Hans Ashar at (301) 443-5997. Sincerely, Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Enclosure: List of plants with Prestressed Concrete Containment Structures . NUCLEAR POWERS PLANTS WITH PRESTRESSED CONCRETE CONTAINMENT STRUCTURES 1. Arkansas Nuclear 1 Arkansas Power & Light Co. 2. Calvert Cliffs 1 & 2 Baltimore Gas & Electric 3. Fort Calhoun 1 Omaha Public Power District 4. Ginna N.P.S. Rochester Gas & Electric 5. Millstone N.P. 2 Connecticut Light & Power Co. 6. Oconee N.S. 1, 2 & 3 Duke Power Company 7. Palisades Consumers Power Company 8. Point Beach 1 & 2 Wisconsin Electric & Power Wisconsin & Michigan Power 9. Rancho Seco 1 Sacramento Municipal Utility 10. Robinson. H.B. 2 Carolina Power & Light 11. Trojan Nuclear Plant Portland General Electric 12. Turkey Point 3 & 4 Florida Power & Light 13. Zion Station 1 & 2 Commonwealth Edison Company 14. Crystal River 3 Florida Power Company 15. J. M. Farley N. P. 1 & 2 Alabama Power Company
Page Last Reviewed/Updated Thursday, March 14, 2024
Page Last Reviewed/Updated Thursday, March 14, 2024