NRC Federal Register Notices – 2021
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
The following links to non-NRC servers and websites are provided solely as a reference for the convenience of users. NRC cannot guarantee the authenticity of documents or the validity of information obtained at these non-NRC websites. See our Site Disclaimer for more information.
| Dec | Nov | Oct | Sep | Aug | Jul | Jun | May | Apr | Mar | Feb | Jan |
29 December 2021 | |||
| Notice | Entergy Operations, Inc; Waterford Steam Electric Station; Unit 3 | [FR DOC# 2021-28279] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessment and Finding of No Significant Impact of Morris Operation Decommissioning Funding Plans | [FR DOC# 2021-28278] | PDF | TEXT | DETAILS |
| Notice | Revision of Fees for the Criminal History Program: Fee Recovery for Fiscal Year 2022 | [FR DOC# 2021-28262] | PDF | TEXT | DETAILS |
28 December 2021 | |||
| Notice | 692nd Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-28188] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Form 798, Request for a Medical Exception to the COVID-19 Vaccination Requirement | [FR DOC# 2021-28145] | PDF | TEXT | DETAILS |
| Notice | Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant Units 3 and 4 | [FR DOC# 2021-28129] | PDF | TEXT | DETAILS |
| Proposed Rule | Access Authorization Fees | [FR DOC# 2021-28117] | PDF | TEXT | DETAILS |
| Rule | Access Authorization Fees | [FR DOC# 2021-28116] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-27415] | PDF | TEXT | DETAILS |
27 December 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-28146] | PDF | TEXT | DETAILS |
22 December 2021 | |||
| Notice | Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants | [FR DOC# 2021-27688] | PDF | TEXT | DETAILS |
| Notice | Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release | [FR DOC# 2021-27667] | PDF | TEXT | DETAILS |
21 December 2021 | |||
| Notice | Exelon Generation Company, LLC; R.E. Ginna Nuclear Power Plant | [FR DOC# 2021-27574] | PDF | TEXT | DETAILS |
| Notice | Control of Heavy Loads at Nuclear Facilities | [FR DOC# 2021-27550] | PDF | TEXT | DETAILS |
20 December 2021 | |||
| Notice | Holtec Decommissioning International, LLC; Palisades Nuclear Plant | [FR DOC# 2021-27491] | PDF | TEXT | DETAILS |
17 December 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-27471] | PDF | TEXT | DETAILS |
| Notice | Monitoring Criteria and Methods To Calculate Occupational Radiation Doses | [FR DOC# 2021-27302] | PDF | TEXT | DETAILS |
16 December 2021 | |||
| Notice | In the Matter of Entergy Nuclear Operations, Inc., Entergy Nuclear Palisades, LLC, Holtec International and Holtec Decommissioning International, LLC, Big Rock Point Plant and Palisades Nuclear Plant | [FR DOC# 2021-27274] | PDF | TEXT | DETAILS |
15 December 2021 | |||
| Notice | Geologic and Geotechnical Site Characterization Investigations for Nuclear Power Plants | [FR DOC# 2021-27115] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC, TN-32 Dry Storage Cask, Certificate of Compliance No. 1021, Renewal of Initial Certificate and Amendment No. 1 | [FR DOC# 2021-27059] | PDF | TEXT | DETAILS |
14 December 2021 | |||
| Notice | Safety Review of Light-Water Power-Reactor Construction Permit Applications | [FR DOC# 2021-27035] | PDF | TEXT | DETAILS |
| Notice | Dow Corning Corporation; Building DC-3 | [FR DOC# 2021-26962] | PDF | TEXT | DETAILS |
| Notice | Termination of Operating Licenses for the General Atomics TRIGA Reactor Facility | [FR DOC# 2021-26961] | PDF | TEXT | DETAILS |
10 December 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-26920] | PDF | TEXT | DETAILS |
| Proposed Rule | Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors | [FR DOC# 2021-26877] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Form 7, Application for NRC Export/Import License Amendment, Renewal, or Consent Request(s) | [FR DOC# 2021-26767] | PDF | TEXT | DETAILS |
9 December 2021 | |||
| Notice | Information Collection: NRC Online Form, Request for Alternatives | [FR DOC# 2021-26646] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC, TN-68 Dry Storage Cask, Certificate of Compliance No. 1027, Renewal of Initial Certificate and Amendment No. 1 | [FR DOC# 2021-26628] | PDF | TEXT | DETAILS |
| Proposed Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC, TN-68 Dry Storage Cask, Certificate of Compliance No. 1027, Renewal of Initial Certificate and Amendment No. 1 | [FR DOC# 2021-26627] | PDF | TEXT | DETAILS |
8 December 2021 | |||
| Notice | Information Collection: NRC Insider Threat Program for Licensees and Others Requiring Access to Classified Information | [FR DOC# 2021-26594] | PDF | TEXT | DETAILS |
6 December 2021 | |||
| Notice | Draft Programmatic Agreement Between the U.S. Nuclear Regulatory Commission, U.S. Environmental Protection Agency, Navajo Nation Tribal Historic Preservation Office, New Mexico State Historic Preservation Office, Bureau of Indian Affairs, and United Nuclear Corporation Regarding the United Nuclear Corporation Mill Site and Northeast Church Rock Mine Site Located in McKinley County, New Mexico | [FR DOC# 2021-26408] | PDF | TEXT | DETAILS |
| Notice | Issuance of Exemption in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-26407] | PDF | TEXT | DETAILS |
3 December 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-26423] | PDF | TEXT | DETAILS |
| Notice | NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 | [FR DOC# 2021-26230] | PDF | TEXT | DETAILS |
1 December 2021 | |||
| Notice | Kairos Power, LLC | [FR DOC# 2021-26119] | PDF | TEXT | DETAILS |
| Notice | Advisory Committee on the Medical Uses of Isotopes: Meeting Notice | [FR DOC# 2021-26111] | PDF | TEXT | DETAILS |
30 November 2021 | |||
| Notice | Target Fragilities for Equipment Vulnerable to High Energy Arcing Faults | [FR DOC# 2021-26018] | PDF | TEXT | DETAILS |
| Notice | Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2 | [FR DOC# 2021-25980] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-25907] | PDF | TEXT | DETAILS |
| Rule | Miscellaneous Corrections | [FR DOC# 2021-24472] | PDF | TEXT | DETAILS |
29 November 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-26015] | PDF | TEXT | DETAILS |
| Notice | Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant Units 3 and 4 | [FR DOC# 2021-25952] | PDF | TEXT | DETAILS |
| Notice | Entergy Nuclear Operations, Inc., Palisades Nuclear Plant | [FR DOC# 2021-25948] | PDF | TEXT | DETAILS |
| Proposed Rule | Reporting Requirements for Nonemergency Events at Nuclear Power Plants | [FR DOC# 2021-25928] | PDF | TEXT | DETAILS |
| Notice | SHINE Medical Technologies, LLC; SHINE Medical Isotope Production Facility | [FR DOC# 2021-25911] | PDF | TEXT | DETAILS |
| Notice | Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3 | [FR DOC# 2021-25887] | PDF | TEXT | DETAILS |
| Notice | Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant Units 3 and 4 | [FR DOC# 2021-25876] | PDF | TEXT | DETAILS |
26 November 2021 | |||
| Notice | Evaluations of Explosions Postulated To Occur at Nearby Facilities and on Transportation Routes Near Nuclear Power Plants | [FR DOC# 2021-25836] | PDF | TEXT | DETAILS |
| Notice | Holtec Decommissioning International, LLC, Palisades Nuclear Plant | [FR DOC# 2021-25830] | PDF | TEXT | DETAILS |
24 November 2021 | |||
| Rule | List of Approved Spent Fuel Storage Casks: Holtec International HI-STAR 100 Cask System, Certificate of Compliance No. 1008, Renewal of Initial Certificate and Amendment Nos. 1, 2, and 3 | [FR DOC# 2021-25630] | PDF | TEXT | DETAILS |
| Notice | In the Matter of Arizona Public Service Company, Salt River Project Agricultural Improvement and Power District Public Service Company of New Mexico, Palo Verde Nuclear Generating Station, Units 1 and 2 and Independent Spent Fuel Storage Installation | [FR DOC# 2021-25621] | PDF | TEXT | DETAILS |
23 November 2021 | |||
| Notice | Sigma-Aldrich Company, Fort Mims Site | [FR DOC# 2021-25551] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Requests to Agreement States and Non-Agreement States for Information | [FR DOC# 2021-25473] | PDF | TEXT | DETAILS |
| Proposed Rule | Guidance for Implementation of 10 CFR 50.59, “Changes, Tests and Experiments,” at Non-Power Production or Utilization Facilities | [FR DOC# 2021-25260] | PDF | TEXT | DETAILS |
22 November 2021 | |||
| Notice | In the Matter of Exelon Generation Company, LLC; Exelon Corporation; Exelon FitzPatrick, LLC; Nine Mile Point Nuclear Station, LLC; R.E. Ginna Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, LLC; Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 1, 2, and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 1, 2, and 3; Quad Cities Nuclear Power Station, Units 1 and 2; R.E. Ginna Nuclear Power Plant; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Three Mile Island Nuclear Station, Unit 1; Zion Nuclear Power Station, Units 1 and 2; and the Associated Independent Spent Fuel Storage Installations | [FR DOC# 2021-25406] | PDF | TEXT | DETAILS |
19 November 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-25462] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Nuclear Material Events Database (NMED) for the Collection of Event Report, Response, Analyses, and Follow-Up Data on Events Involving the Use of Atomic Energy Act (AEA) Radioactive Byproduct Material | [FR DOC# 2021-25264] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Physical Protection of Plants and Materials | [FR DOC# 2021-25261] | PDF | TEXT | DETAILS |
17 November 2021 | |||
| Rule | Extending the Duration of the AP1000 Design Certification | [FR DOC# 2021-25074] | PDF | TEXT | DETAILS |
16 November 2021 | |||
| Notice | New York State Energy Research and Development Authority; Irradiated Nuclear Fuel Processing Plant; Western New York Nuclear Service Center | [FR DOC# 2021-24950] | PDF | TEXT | DETAILS |
15 November 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-25008] | PDF | TEXT | DETAILS |
12 November 2021 | |||
| Rule | Controlled Unclassified Information Program | [FR DOC# 2021-24543] | PDF | TEXT | DETAILS |
10 November 2021 | |||
| Notice | Information Collection: Facility Security Clearance and Safeguarding of National Security Information and Restricted Data | [FR DOC# 2021-24524] | PDF | TEXT | DETAILS |
9 November 2021 | |||
| Notice | 691st Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-24453] | PDF | TEXT | DETAILS |
| Notice | NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2 | [FR DOC# 2021-24407] | PDF | TEXT | DETAILS |
8 November 2021 | |||
| Notice | Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance | [FR DOC# 2021-24389] | PDF | TEXT | DETAILS |
| Proposed Rule | Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors | [FR DOC# 2021-24329] | PDF | TEXT | DETAILS |
5 November 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-24406] | PDF | TEXT | DETAILS |
| Notice | Privacy Act of 1974; Systems of Records | [FR DOC# 2021-24283] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC, TN-32 Dry Storage Cask, Certificate of Compliance No. 1021, Renewal of Initial Certificate and Amendment No. 1 | [FR DOC# 2021-24216] | PDF | TEXT | DETAILS |
| Proposed Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC, TN-32 Dry Storage Cask, Certificate of Compliance No. 1021, Renewal of Initial Certificate and Amendment No. 1 | [FR DOC# 2021-24211] | PDF | TEXT | DETAILS |
4 November 2021 | |||
| Notice | New York State Energy Research and Development Authority; Irradiated Nuclear Fuel Processing Plant; Western New York State Nuclear Service Center | [FR DOC# 2021-24118] | PDF | TEXT | DETAILS |
3 November 2021 | |||
| Notice | Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Issuance of Amendment and Exemption Changes to Tier 1 Information Regarding Invessel Components | [FR DOC# 2021-23942] | PDF | TEXT | DETAILS |
2 November 2021 | |||
| Notice | Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2 | [FR DOC# 2021-23843] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-23783] | PDF | TEXT | DETAILS |
1 November 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-23900] | PDF | TEXT | DETAILS |
| Notice | Performance Review Boards for Senior Executive Service | [FR DOC# 2021-23713] | PDF | TEXT | DETAILS |
29 October 2021 | |||
| Notice | Kairos Power, LLC; Receipt of Construction Permit Application | [FR DOC# 2021-23568] | PDF | TEXT | DETAILS |
| Proposed Rule | Reporting Requirements for Nonemergency Events at Nuclear Power Plants | [FR DOC# 2021-23550] | PDF | TEXT | DETAILS |
28 October 2021 | |||
| Notice | Armed Forces Radiobiology Research Institute | [FR DOC# 2021-23467] | PDF | TEXT | DETAILS |
27 October 2021 | |||
| Notice | In the Matter of Arizona Public Service Company; Salt River Project Agricultural Improvement and Power District; Public Service Company of New Mexico; Palo Verde Nuclear Generating Station, Units 1 and 2; and Independent Spent Fuel Storage Installation | [FR DOC# 2021-23346] | PDF | TEXT | DETAILS |
26 October 2021 | |||
| Notice | Issuance of Exemption in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-23315] | PDF | TEXT | DETAILS |
22 October 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-23247] | PDF | TEXT | DETAILS |
| Notice | Duke Energy Carolinas, LLC; Establishment of Atomic Safety and Licensing Board 1 | [FR DOC# 2021-23109] | PDF | TEXT | DETAILS |
| Notice | Holtec Decommissioning International, LLC; Pilgrim Nuclear Power Station; Exemption From Certain Low-Level Waste Shipment Tracking Requirements | [FR DOC# 2021-23088] | PDF | TEXT | DETAILS |
| Notice | Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Florida Power & Light Co.; St. Lucie Plant Units 1 and 2 | [FR DOC# 2021-23073] | PDF | TEXT | DETAILS |
21 October 2021 | |||
| Notice | Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2 | [FR DOC# 2021-22912] | PDF | TEXT | DETAILS |
18 October 2021 | |||
| Notice | Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility; and US Ecology, Inc.; Idaho Resource Conservation and Recovery Act Subtitle C Hazardous Disposal Facility Located Near Grand View, Idaho | [FR DOC# 2021-22645] | PDF | TEXT | DETAILS |
15 October 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-22678] | PDF | TEXT | DETAILS |
12 October 2021 | |||
| Rule | Extending the Duration of the AP1000 Design Certification | [FR DOC# C1-2021-20226] | PDF | TEXT | DETAILS |
| Notice | Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility; and US Ecology, Inc.; Idaho Resource Conservation and Recovery Act Subtitle C Hazardous Disposal Facility Located Near Grand View, Idaho | [FR DOC# 2021-22154] | PDF | TEXT | DETAILS |
| Notice | Kewaunee Power Station and Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of License and Conforming Amendment | [FR DOC# 2021-22093] | PDF | TEXT | DETAILS |
8 October 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-22156] | PDF | TEXT | DETAILS |
| Notice | 690th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-22071] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants | [FR DOC# 2021-22020] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Form 531, Request for Taxpayer Identification Number | [FR DOC# 2021-22016] | PDF | TEXT | DETAILS |
| Notice | Duke Energy Carolinas, LLC; Establishment of Atomic Safety and Licensing Board | [FR DOC# 2021-21978] | PDF | TEXT | DETAILS |
7 October 2021 | |||
| Notice | Environmental Assessment and Finding of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-21957] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC NUHOMS® EOS Dry Spent Fuel Storage System, Certificate of Compliance No. 1042, Amendment No. 2 | [FR DOC# 2021-21859] | PDF | TEXT | DETAILS |
6 October 2021 | |||
| Rule | Updates on the Export of Deuterium | [FR DOC# 2021-21548] | PDF | TEXT | DETAILS |
5 October 2021 | |||
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas, LLC, Standardized Advanced NUHOMS® Horizontal Modular Storage System Certificate of Compliance No. 1029, Renewal of Initial Certificate and Amendment Nos. 1, 3, and 4 | [FR DOC# 2021-21796] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-21334] | PDF | TEXT | DETAILS |
| Notice | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information | [FR DOC# 2021-20848] | PDF | TEXT | DETAILS |
4 October 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-21632] | PDF | TEXT | DETAILS |
1 October 2021 | |||
| Notice | Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2 | [FR DOC# 2021-21437] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2 | [FR DOC# 2021-21436] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2 and Independent Spent Fuel Storage Installation | [FR DOC# 2021-21435] | PDF | TEXT | DETAILS |
| Proposed Rule | List of Approved Spent Fuel Storage Casks: Holtec International HI-STAR 100 Cask System, Certificate of Compliance No. 1008, Renewal of Initial Certificate and Amendment Nos. 1, 2, and 3 | [FR DOC# 2021-21428] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: Holtec International HI-STAR 100 Cask System, Certificate of Compliance No. 1008, Renewal of Initial Certificate and Amendment Nos. 1, 2, and 3 | [FR DOC# 2021-21427] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3 | [FR DOC# 2021-21400] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 1, 2, and 3 | [FR DOC# 2021-21399] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 1, 2, and 3 and Independent Spent Fuel Storage Installation | [FR DOC# 2021-21398] | PDF | TEXT | DETAILS |
| Notice | Oregon State University | [FR DOC# 2021-21359] | PDF | TEXT | DETAILS |
| Notice | Order Suspending General License Authority To Export Radioactive Material and Deuterium to China General Nuclear (CGN), CGN Subsidiaries, or Related Entities | [FR DOC# 2021-21342] | PDF | TEXT | DETAILS |
30 September 2021 | |||
| Notice | Acceptability of ASME Code Section XI, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants, for Non-Light Water Reactors | [FR DOC# 2021-21295] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 8 | [FR DOC# 2021-21063] | PDF | TEXT | DETAILS |
29 September 2021 | |||
| Notice | Florida Power & Light Company; NextEra Energy; St. Lucie Plant, Units Nos. 1 and 2 | [FR DOC# 2021-21168] | PDF | TEXT | DETAILS |
28 September 2021 | |||
| Notice | Westinghouse Electric Company, LLC, Columbia Fuel Fabrication Facility | [FR DOC# 2021-21053] | PDF | TEXT | DETAILS |
27 September 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-20986] | PDF | TEXT | DETAILS |
24 September 2021 | |||
| Notice | 689th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-20751] | PDF | TEXT | DETAILS |
23 September 2021 | |||
| Notice | Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance | [FR DOC# 2021-20631] | PDF | TEXT | DETAILS |
| Notice | SHINE Medical Technologies, LLC; SHINE Medical Isotope Production Facility | [FR DOC# 2021-20622] | PDF | TEXT | DETAILS |
| Notice | Preparing Probabilistic Fracture Mechanics Submittals | [FR DOC# 2021-20566] | PDF | TEXT | DETAILS |
| Notice | Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste | [FR DOC# 2021-20565] | PDF | TEXT | DETAILS |
| Notice | NRC's Full Draft Strategic Plan for Fiscal Years 2022 Through 2026 | [FR DOC# 2021-20542] | PDF | TEXT | DETAILS |
22 September 2021 | |||
| Notice | Information Collection: NRC Insider Threat Program for Licensees and Others Requiring Access to Classified Information | [FR DOC# 2021-20475] | PDF | TEXT | DETAILS |
| Proposed Rule | Extending the Duration of the AP1000 Design Certification | [FR DOC# 2021-20227] | PDF | TEXT | DETAILS |
| Rule | Extending the Duration of the AP1000 Design Certification | [FR DOC# 2021-20226] | PDF | TEXT | DETAILS |
17 September 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-20296] | PDF | TEXT | DETAILS |
| Notice | Operator Licensing Examination Standards for Power Reactors | [FR DOC# 2021-20171] | PDF | TEXT | DETAILS |
| Notice | Interim Storage Partners, LLC; WCS Consolidated Interim Storage Facility; Issuance of Materials License and Record of Decision | [FR DOC# 2021-20092] | PDF | TEXT | DETAILS |
15 September 2021 | |||
| Notice | Perma-Fix Northwest Richland, Inc. | [FR DOC# 2021-19841] | PDF | TEXT | DETAILS |
| Notice | Perma-Fix Northwest Richland, Inc. | [FR DOC# 2021-19840] | PDF | TEXT | DETAILS |
| Notice | Issuance of Exemption in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-19824] | PDF | TEXT | DETAILS |
13 September 2021 | |||
| Notice | Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America | [FR DOC# 2021-19636] | PDF | TEXT | DETAILS |
| Notice | Safety-Related Steel Structures and Steel-Plate Composite Walls for Other Than Reactor Vessels and Containments | [FR DOC# 2021-19621] | PDF | TEXT | DETAILS |
10 September 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-19719] | PDF | TEXT | DETAILS |
| Notice | Systematic Assessment for How the NRC Addresses Environmental Justice in Its Programs, Policies, and Activities | [FR DOC# 2021-19549] | PDF | TEXT | DETAILS |
9 September 2021 | |||
| Notice | NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Post-Shutdown Decommissioning Activities Report | [FR DOC# 2021-19417] | PDF | TEXT | DETAILS |
8 September 2021 | |||
| Notice | Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria | [FR DOC# 2021-19306] | PDF | TEXT | DETAILS |
| Notice | Seeks Qualified Candidates for the Advisory Committee on Reactor Safeguards | [FR DOC# 2021-19179] | PDF | TEXT | DETAILS |
7 September 2021 | |||
| Notice | In the Matter of LaCrosseSolutions, LLC; La Crosse Boiling Water Reactor | [FR DOC# 2021-19343] | PDF | TEXT | DETAILS |
| Notice | In the Matter of ZionSolutions, LLC and Exelon Generation Company, LLC; Zion Nuclear Power Station, Units 1 and 2 | [FR DOC# 2021-19342] | PDF | TEXT | DETAILS |
| Notice | Safety-Related Steel Structures and Steel-Plate Composite Walls for Other Than Reactor Vessels and Containments | [FR DOC# 2021-19178] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-18934] | PDF | TEXT | DETAILS |
| Notice | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information | [FR DOC# 2021-17612] | PDF | TEXT | DETAILS |
3 September 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-19241] | PDF | TEXT | DETAILS |
| Notice | Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant, Units 3 and 4 | [FR DOC# 2021-19133] | PDF | TEXT | DETAILS |
30 August 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-18680] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company, LLC, Byron Station, Unit Nos. 1 and 2 | [FR DOC# 2021-18601] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company, LLC, Dresden Nuclear Power Station, Units 2 and 3 | [FR DOC# 2021-18600] | PDF | TEXT | DETAILS |
27 August 2021 | |||
| Notice | Advisory Committee on the Medical Uses of Isotopes: Meeting Notice | [FR DOC# 2021-18514] | PDF | TEXT | DETAILS |
26 August 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-18445] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Form 7, Application for NRC Export/Import License, Amendment, Renewal or Consent Request(s) | [FR DOC# 2021-18363] | PDF | TEXT | DETAILS |
25 August 2021 | |||
| Notice | Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos. 1 and 2 | [FR DOC# 2021-18255] | PDF | TEXT | DETAILS |
24 August 2021 | |||
| Rule | Miscellaneous Corrections; Correction | [FR DOC# 2021-18156] | PDF | TEXT | DETAILS |
| Proposed Rule | NuScale Small Modular Reactor Design Certification | [FR DOC# 2021-18071] | PDF | TEXT | DETAILS |
23 August 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-18150] | PDF | TEXT | DETAILS |
| Proposed Rule | Categorical Exclusions from Environmental Review | [FR DOC# 2021-18058] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Facility Security Clearance and Safeguarding of National Security Information and Restricted Data | [FR DOC# 2021-17961] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Requests to Agreement States and Non-Agreement States for Information | [FR DOC# 2021-17956] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants | [FR DOC# 2021-17955] | PDF | TEXT | DETAILS |
20 August 2021 | |||
| Notice | Acceptability of ASME Code Section III, Division 5, High Temperature Reactors | [FR DOC# 2021-17916] | PDF | TEXT | DETAILS |
18 August 2021 | |||
| Notice | Site Characterization Investigations for Nuclear Power Plants | [FR DOC# 2021-17686] | PDF | TEXT | DETAILS |
17 August 2021 | |||
| Notice | Use of ARCON Methodology for Calculation of Accident-Related Offsite Atmospheric Dispersion Factors | [FR DOC# 2021-17596] | PDF | TEXT | DETAILS |
| Proposed Rule | Linear No-Threshold Model and Standards for Protection Against Radiation | [FR DOC# 2021-17475] | PDF | TEXT | DETAILS |
16 August 2021 | |||
| Notice | 688th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-17444] | PDF | TEXT | DETAILS |
| Notice | Florida Power and Light Company; NextEra Energy; St. Lucie Plant, Units 1 and 2 | [FR DOC# 2021-17416] | PDF | TEXT | DETAILS |
13 August 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-17453] | PDF | TEXT | DETAILS |
| Rule | Revision of Fee Schedules; Fee Recovery for Fiscal Year 2021 | [FR DOC# 2021-17399] | PDF | TEXT | DETAILS |
| Proposed Rule | List of Approved Spent Fuel Storage Casks: TN Americas, LLC, Standardized Advanced NUHOMS® Horizontal Modular Storage System, Certificate of Compliance No. 1029, Renewal of Initial Certificate and Amendment Nos. 1, 3, and 4 | [FR DOC# 2021-17194] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas, LLC, Standardized Advanced NUHOMS® Horizontal Modular Storage System, Certificate of Compliance No. 1029, Renewal of Initial Certificate and Amendment Nos. 1, 3, and 4 | [FR DOC# 2021-17193] | PDF | TEXT | DETAILS |
12 August 2021 | |||
| Proposed Rule | Elimination of Immediate Notification Requirements for Nonemergency Events | [FR DOC# 2021-17244] | PDF | TEXT | DETAILS |
| Proposed Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC; NUHOMS® EOS Dry Spent Fuel Storage System, Certificate of Compliance No. 1042, Amendment No. 2 | [FR DOC# 2021-17228] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC NUHOMS® EOS Dry Spent Fuel Storage System, Certificate of Compliance No. 1042, Amendment No. 2 | [FR DOC# 2021-17227] | PDF | TEXT | DETAILS |
| Rule | Advanced Boiling Water Reactor (ABWR) Design Certification Renewal | [FR DOC# 2021-17115] | PDF | TEXT | DETAILS |
11 August 2021 | |||
| Notice | Southern Nuclear Operating Company; Joseph M. Farley Nuclear Plant, Units 1 and 2; Vogtle Electric Generating Plant, Units 1 and 2 | [FR DOC# 2021-17116] | PDF | TEXT | DETAILS |
| Notice | Issuance of Exemption in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-17105] | PDF | TEXT | DETAILS |
10 August 2021 | |||
| Notice | Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Duke Energy Carolina, LLC; Duke Energy; Oconee Nuclear Station, Units 1, 2, and 3 | [FR DOC# 2021-17036] | PDF | TEXT | DETAILS |
| Notice | Systematic Assessment for How the NRC Addresses Environmental Justice in Its Programs, Policies, and Activities | [FR DOC# 2021-16970] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-16925] | PDF | TEXT | DETAILS |
| Proposed Rule | Protection of Digital Computer and Communication Systems and Networks | [FR DOC# 2021-16889] | PDF | TEXT | DETAILS |
9 August 2021 | |||
| Notice | Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 1 and 2 | [FR DOC# 2021-16899] | PDF | TEXT | DETAILS |
| Notice | NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Post-Shutdown Decommissioning Activities Report | [FR DOC# 2021-16898] | PDF | TEXT | DETAILS |
| Rule | Miscellaneous Corrections | [FR DOC# 2021-16662] | PDF | TEXT | DETAILS |
6 August 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-16962] | PDF | TEXT | DETAILS |
| Notice | Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility | [FR DOC# 2021-16595] | PDF | TEXT | DETAILS |
| Notice | Interim Storage Partners Consolidated Interim Storage Facility Project | [FR DOC# 2021-16553] | PDF | TEXT | DETAILS |
5 August 2021 | |||
| Notice | Information Collection: Financial Protection Requirements and Indemnity Agreements | [FR DOC# 2021-16765] | PDF | TEXT | DETAILS |
| Notice | Advisory Committee on the Medical Uses of Isotopes: Call for Nominations | [FR DOC# 2021-16706] | PDF | TEXT | DETAILS |
| Proposed Rule | List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 8 | [FR DOC# 2021-16703] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 8 | [FR DOC# 2021-16702] | PDF | TEXT | DETAILS |
4 August 2021 | |||
| Notice | University of Massachusetts Lowell; University of Massachusetts Lowell Research Reactor | [FR DOC# 2021-16590] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Standards for Protection Against Radiation | [FR DOC# 2021-16546] | PDF | TEXT | DETAILS |
| Notice | In the Matter of Cammenga and Associates, LLC ; Establishment of Atomic Safety and Licensing Board | [FR DOC# 2021-16543] | PDF | TEXT | DETAILS |
2 August 2021 | |||
| Notice | Seismic Design Classification for Nuclear Power Plants | [FR DOC# 2021-16343] | PDF | TEXT | DETAILS |
| Notice | Evaluations of Explosions Postulated To Occur at Nearby Facilities and on Transportation Routes Near Nuclear Power Plants | [FR DOC# 2021-16340] | PDF | TEXT | DETAILS |
30 July 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-16426] | PDF | TEXT | DETAILS |
| Proposed Rule | Unified Agenda of Federal Regulatory and Deregulatory Actions | [FR DOC# 2021-14887] | PDF | TEXT | DETAILS |
29 July 2021 | |||
| Rule | Spent Fuel Reprocessing | [FR DOC# 2021-16173] | PDF | TEXT | DETAILS |
28 July 2021 | |||
| Notice | Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release | [FR DOC# 2021-16096] | PDF | TEXT | DETAILS |
| Notice | Duke Energy Carolinas, LLC; Duke Energy; Oconee Nuclear Station, Units 1, 2, and 3 | [FR DOC# 2021-16011] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Tribal Participation in the Advance Notification Program | [FR DOC# 2021-16002] | PDF | TEXT | DETAILS |
| Notice | Information Collection: General Domestic Licenses for Byproduct Material | [FR DOC# 2021-16001] | PDF | TEXT | DETAILS |
27 July 2021 | |||
| Rule | Revisions to Reprocessing Plant Components for Export | [FR DOC# 2021-15922] | PDF | TEXT | DETAILS |
26 July 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-15894] | PDF | TEXT | DETAILS |
| Notice | Florida Power and Light Company; St. Lucie Plant, Unit No. 2 | [FR DOC# 2021-15823] | PDF | TEXT | DETAILS |
| Proposed Rule | Receipts-Based NRC Size Standards | [FR DOC# 2021-15506] | PDF | TEXT | DETAILS |
23 July 2021 | |||
| Rule | Advanced Manufacturing Technologies Subtask 2A | [FR DOC# 2021-15658] | PDF | TEXT | DETAILS |
21 July 2021 | |||
| Notice | Implementation of Aging Management Requirements for Spent Fuel Storage Renewals | [FR DOC# 2021-15442] | PDF | TEXT | DETAILS |
19 July 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-15334] | PDF | TEXT | DETAILS |
15 July 2021 | |||
| Notice | Holtec Decommissioning International, LLC; Indian Point Nuclear Generating, Unit Nos. 1, 2, and 3; Post-Shutdown Decommissioning Activities Report | [FR DOC# 2021-15068] | PDF | TEXT | DETAILS |
13 July 2021 | |||
| Notice | Virginia Electric Power Company; North Anna Power Station, Units 1 and 2 | [FR DOC# 2021-14767] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-14642] | PDF | TEXT | DETAILS |
12 July 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-14784] | PDF | TEXT | DETAILS |
| Notice | Advisory Committee on the Medical Uses of Isotopes: Reschedule of Public Meeting | [FR DOC# 2021-14709] | PDF | TEXT | DETAILS |
9 July 2021 | |||
| Notice | Systematic Assessment for How the NRC Addresses Environmental Justice in Its Programs, Policies, and Activities | [FR DOC# 2021-14673] | PDF | TEXT | DETAILS |
7 July 2021 | |||
| Notice | Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2 | [FR DOC# 2021-14456] | PDF | TEXT | DETAILS |
| Notice | Replacement Energy Cost Estimates for Nuclear Power Plants: 2020-2030 | [FR DOC# 2021-14364] | PDF | TEXT | DETAILS |
6 July 2021 | |||
| Notice | In the Matter of NorthStar Nuclear Decommissioning Company, LLC, NorthStar Vermont Yankee, LLC, ADP CR3, LLC, and Duke Energy Florida, LLC, Vermont Yankee Nuclear Power Station and Independent Spent Fuel Storage Installation, Crystal River Unit 3 Nuclear Generating Plant and Independent Spent Fuel Storage Installation | [FR DOC# 2021-14266] | PDF | TEXT | DETAILS |
| Notice | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information | [FR DOC# 2021-12277] | PDF | TEXT | DETAILS |
2 July 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-14306] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Online Form, Request for Alternatives | [FR DOC# 2021-14245] | PDF | TEXT | DETAILS |
1 July 2021 | |||
| Proposed Rule | NuScale Small Modular Reactor Design Certification | [FR DOC# 2021-13940] | PDF | TEXT | DETAILS |
| Proposed Rule | Advanced Boiling Water Reactor (ABWR) Design Certification Renewal | [FR DOC# 2021-13802] | PDF | TEXT | DETAILS |
| Rule | Advanced Boiling Water Reactor (ABWR) Design Certification Renewal | [FR DOC# 2021-13801] | PDF | TEXT | DETAILS |
30 June 2021 | |||
| Notice | Fuel Qualification for Advanced Reactors | [FR DOC# 2021-13955] | PDF | TEXT | DETAILS |
| Notice | PSEG Nuclear, LLC; Exelon Generation Company, LLC; Salem Nuclear Generating Station, Unit No. 2 | [FR DOC# 2021-13896] | PDF | TEXT | DETAILS |
| Notice | GE-Hitachi Nuclear Energy Americas, LLC; Morris Operation | [FR DOC# 2021-13891] | PDF | TEXT | DETAILS |
| Notice | Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-13887] | PDF | TEXT | DETAILS |
| Notice | Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing | [FR DOC# 2021-13883] | PDF | TEXT | DETAILS |
29 June 2021 | |||
| Notice | Palo Verde Nuclear Generating Station, Units 1 and 2 and Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of Licenses | [FR DOC# 2021-13778] | PDF | TEXT | DETAILS |
28 June 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-13775] | PDF | TEXT | DETAILS |
| Notice | Volcanic Hazards Assessment for Proposed Nuclear Power Reactor Sites | [FR DOC# 2021-13750] | PDF | TEXT | DETAILS |
| Notice | Information Collection: US NRC Acquisition Regulation | [FR DOC# 2021-13661] | PDF | TEXT | DETAILS |
25 June 2021 | |||
| Notice | Duke Energy Carolinas, LLC; Duke Energy; Oconee Nuclear Station, Units 1, 2, and 3 | [FR DOC# 2021-13560] | PDF | TEXT | DETAILS |
| Notice | Revisions to Uniform Low-Level Radioactive Waste Manifest Forms | [FR DOC# 2021-13543] | PDF | TEXT | DETAILS |
24 June 2021 | |||
| Notice | Information Collection: Physical Protection of Plants and Materials | [FR DOC# 2021-13475] | PDF | TEXT | DETAILS |
| Notice | Holtec Decommissioning International, LLC; Indian Point Nuclear Generating, Unit Nos. 1, 2, and 3; Post-Shutdown Decommissioning Activities Report | [FR DOC# 2021-13474] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Domestic Licensing of Production and Utilization Facilities | [FR DOC# 2021-13473] | PDF | TEXT | DETAILS |
| Notice | Use of Plant Parameter Envelope in Early Site Permit Applications | [FR DOC# 2021-13472] | PDF | TEXT | DETAILS |
23 June 2021 | |||
| Proposed Rule | Retrospective Review of Administrative Requirements | [FR DOC# 2021-13466] | PDF | TEXT | DETAILS |
17 June 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-12990] | PDF | TEXT | DETAILS |
| Notice | United Nuclear Corporation Church Rock Project | [FR DOC# 2021-12881] | PDF | TEXT | DETAILS |
| Notice | Advisory Committee on the Medical Uses of Isotopes: Meeting Notice | [FR DOC# 2021-12767] | PDF | TEXT | DETAILS |
16 June 2021 | |||
| Notice | Multi-Agency Radiation Survey and Site Investigation Manual, Revision 2 | [FR DOC# 2021-12654] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Voluntary Reporting of Planned New Reactor Applications | [FR DOC# 2021-12614] | PDF | TEXT | DETAILS |
| Rule | Revision of Fee Schedules; Fee Recovery for Fiscal Year 2021 | [FR DOC# 2021-12546] | PDF | TEXT | DETAILS |
15 June 2021 | |||
| Notice | 687th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-12502] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-12286] | PDF | TEXT | DETAILS |
14 June 2021 | |||
| Notice | American Centrifuge Operating, LLC; American Centrifuge Plant | [FR DOC# 2021-12356] | PDF | TEXT | DETAILS |
11 June 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-12449] | PDF | TEXT | DETAILS |
| Notice | Guidance for Implementation of Changes, Tests, and Experiments | [FR DOC# 2021-12280] | PDF | TEXT | DETAILS |
10 June 2021 | |||
| Notice | Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2 | [FR DOC# 2021-12165] | PDF | TEXT | DETAILS |
9 June 2021 | |||
| Notice | Defense Threat Reduction Agency, Ft. Belvoir, Virginia | [FR DOC# 2021-12070] | PDF | TEXT | DETAILS |
| Notice | Report to Congress on Abnormal Occurrences; Fiscal Year 2020 Dissemination of Information | [FR DOC# 2021-12046] | PDF | TEXT | DETAILS |
8 June 2021 | |||
| Notice | In the Matter of CampCo Incorporated | [FR DOC# 2021-12009] | PDF | TEXT | DETAILS |
7 June 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-12016] | PDF | TEXT | DETAILS |
3 June 2021 | |||
| Rule | Evidence-Building and Evaluation Policy Statement | [FR DOC# 2021-11637] | PDF | TEXT | DETAILS |
2 June 2021 | |||
| Notice | Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 1, 2, and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 1, 2, and 3; Quad Cities Nuclear Power Station, Units 1 and 2; R. E. Ginna Nuclear Power Plant; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Three Mile Island Nuclear Station, Unit 1; Zion Nuclear Power Station, Units 1 and 2; and the Associated Independent Spent Fuel Storage Installations; Consideration of Approval of Transfer of Licenses and Conforming Amendments | [FR DOC# 2021-11528] | PDF | TEXT | DETAILS |
1 June 2021 | |||
| Rule | Industrial Radiographic Operations and Training | [FR DOC# 2021-11436] | PDF | TEXT | DETAILS |
| Notice | Emergency Response Planning and Preparedness for Nuclear Power Reactors | [FR DOC# 2021-11434] | PDF | TEXT | DETAILS |
| Notice | In the Matter of Arizona Public Service Company, Public Service Company of New Mexico, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation | [FR DOC# 2021-11433] | PDF | TEXT | DETAILS |
| Notice | In the Matter of ZionSolutions, LLC and Exelon Generation Company, LLC; Zion Nuclear Power Station, Units 1 and 2 | [FR DOC# 2021-11390] | PDF | TEXT | DETAILS |
| Notice | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information | [FR DOC# 2021-11286] | PDF | TEXT | DETAILS |
28 May 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-11485] | PDF | TEXT | DETAILS |
| Notice | Fire Protection for Nuclear Power Plants | [FR DOC# 2021-11298] | PDF | TEXT | DETAILS |
| Notice | Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants | [FR DOC# 2021-11297] | PDF | TEXT | DETAILS |
26 May 2021 | |||
| Rule | List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Cask System Certificate of Compliance No. 1014, Amendment No. 15 | [FR DOC# 2021-11192] | PDF | TEXT | DETAILS |
25 May 2021 | |||
| Notice | Control of Heavy Loads at Nuclear Facilities | [FR DOC# 2021-10945] | PDF | TEXT | DETAILS |
| Notice | Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-10923] | PDF | TEXT | DETAILS |
24 May 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-10939] | PDF | TEXT | DETAILS |
21 May 2021 | |||
| Notice | Supplemental Guidance for Radiological Consequence Analyses Using Alternative Source Terms | [FR DOC# 2021-10748] | PDF | TEXT | DETAILS |
20 May 2021 | |||
| Notice | Environmental Assessments and Findings of no Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-10596] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-10595] | PDF | TEXT | DETAILS |
19 May 2021 | |||
| Notice | Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants | [FR DOC# 2021-10548] | PDF | TEXT | DETAILS |
18 May 2021 | |||
| Notice | NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center | [FR DOC# 2021-10406] | PDF | TEXT | DETAILS |
| Notice | NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center | [FR DOC# 2021-10405] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-10374] | PDF | TEXT | DETAILS |
17 May 2021 | |||
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC Standardized NUHOMS® Horizontal Modular Storage System, Certificate of Compliance No. 1004, Renewed Amendment No. 17 | [FR DOC# 2021-10281] | PDF | TEXT | DETAILS |
14 May 2021 | |||
| Notice | Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Unit 4 | [FR DOC# 2021-10254] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessment and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-10241] | PDF | TEXT | DETAILS |
| Notice | SHINE Medical Technologies, LLC; SHINE Medical Isotope Production Facility | [FR DOC# 2021-09903] | PDF | TEXT | DETAILS |
12 May 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-10136] | PDF | TEXT | DETAILS |
| Proposed Rule | American Society of Mechanical Engineers 2019-2020 Code Editions; Correction | [FR DOC# 2021-09997] | PDF | TEXT | DETAILS |
10 May 2021 | |||
| Notice | Information Collection: Voluntary Reporting of Performance Indicators | [FR DOC# 2021-09825] | PDF | TEXT | DETAILS |
7 May 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-09875] | PDF | TEXT | DETAILS |
| Notice | Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants | [FR DOC# 2021-09728] | PDF | TEXT | DETAILS |
| Notice | Vermont Yankee and US Ecology Idaho Alternate Disposal Request | [FR DOC# 2021-09720] | PDF | TEXT | DETAILS |
| Notice | Virginia Electric and Power Company; Surry Power Station, Units 1 and 2 | [FR DOC# 2021-09719] | PDF | TEXT | DETAILS |
| Notice | 686th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-09718] | PDF | TEXT | DETAILS |
| Proposed Rule | Categorical Exclusions From Environmental Review | [FR DOC# 2021-09675] | PDF | TEXT | DETAILS |
6 May 2021 | |||
| Proposed Rule | Criteria To Return Retired Nuclear Power Reactors to Operations | [FR DOC# 2021-09607] | PDF | TEXT | DETAILS |
5 May 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-09381] | PDF | TEXT | DETAILS |
4 May 2021 | |||
| Notice | Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria | [FR DOC# 2021-09312] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-09293] | PDF | TEXT | DETAILS |
| Notice | Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of Licenses | [FR DOC# 2021-09279] | PDF | TEXT | DETAILS |
| Notice | Control of Heavy Loads at Nuclear Facilities | [FR DOC# 2021-09275] | PDF | TEXT | DETAILS |
| Notice | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information | [FR DOC# 2021-07669] | PDF | TEXT | DETAILS |
3 May 2021 | |||
| Notice | Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 1, 2, and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 1, 2, and 3; Quad Cities Nuclear Power Station, Units 1 and 2; R. E. Ginna Nuclear Power Plant; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Three Mile Island Nuclear Station, Unit 1; Zion Nuclear Power Station, Units 1 and 2; and the Associated Independent Spent Fuel Storage Installations; Consideration of Approval of Transfer of Licenses and Conforming Amendments | [FR DOC# 2021-09218] | PDF | TEXT | DETAILS |
30 April 2021 | |||
| Notice | Environmental Assessment and Finding of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-09044] | PDF | TEXT | DETAILS |
28 April 2021 | |||
| Notice | Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-08877] | PDF | TEXT | DETAILS |
26 April 2021 | |||
| Notice | Information Collection: Requests to Agreement States and Non-Agreement States for Information | [FR DOC# 2021-08653] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Criteria and Procedures for Emergency Access to Non-Federal and Regional Low-Level Waste Disposal Facilities | [FR DOC# 2021-08619] | PDF | TEXT | DETAILS |
23 April 2021 | |||
| Notice | Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspections of Piping | [FR DOC# 2021-08446] | PDF | TEXT | DETAILS |
22 April 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-08552] | PDF | TEXT | DETAILS |
21 April 2021 | |||
| Notice | Role of Artificial Intelligence Tools in U.S. Commercial Nuclear Power Operations | [FR DOC# 2021-08177] | PDF | TEXT | DETAILS |
| Notice | Advisory Committee on the Medical Uses of Isotopes: Meeting Notice | [FR DOC# 2021-08172] | PDF | TEXT | DETAILS |
20 April 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-08168] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Reactor Site Criteria | [FR DOC# 2021-08097] | PDF | TEXT | DETAILS |
| Notice | Exelon Generation Company LLC, R.E. Ginna Nuclear Power Plant | [FR DOC# 2021-08061] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-07632] | PDF | TEXT | DETAILS |
19 April 2021 | |||
| Notice | Exelon Generation Company, LLC; Nine Mile Point Nuclear Station, Unit 1 | [FR DOC# 2021-07975] | PDF | TEXT | DETAILS |
16 April 2021 | |||
| Notice | NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center | [FR DOC# 2021-07869] | PDF | TEXT | DETAILS |
| Notice | Regulatory Analysis Guidelines | [FR DOC# 2021-07815] | PDF | TEXT | DETAILS |
14 April 2021 | |||
| Notice | Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-07582] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-07577] | PDF | TEXT | DETAILS |
13 April 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-07583] | PDF | TEXT | DETAILS |
12 April 2021 | |||
| Notice | Information Collection: Licenses and Radiation Safety Requirements for Irradiators | [FR DOC# 2021-07409] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-07405] | PDF | TEXT | DETAILS |
9 April 2021 | |||
| Proposed Rule | Advance Tribal Notification of Certain Radioactive Material Shipments | [FR DOC# 2021-07281] | PDF | TEXT | DETAILS |
8 April 2021 | |||
| Notice | Integrated Human Event Analysis System for Event and Condition Assessment Method and Software Tool | [FR DOC# 2021-07214] | PDF | TEXT | DETAILS |
7 April 2021 | |||
| Notice | 685th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-07177] | PDF | TEXT | DETAILS |
| Notice | Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 1 and 2 | [FR DOC# 2021-07172] | PDF | TEXT | DETAILS |
| Notice | Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2 | [FR DOC# 2021-07130] | PDF | TEXT | DETAILS |
6 April 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-07147] | PDF | TEXT | DETAILS |
| Notice | Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing | [FR DOC# 2021-07088] | PDF | TEXT | DETAILS |
| Notice | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information | [FR DOC# 2021-05311] | PDF | TEXT | DETAILS |
5 April 2021 | |||
| Notice | Information Collection: Tribal Participation in the Advance Notification Program | [FR DOC# 2021-06936] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-06898] | PDF | TEXT | DETAILS |
2 April 2021 | |||
| Notice | NextEra Energy Point Beach, LLC; Establishment of Atomic Safety and Licensing Board | [FR DOC# 2021-06785] | PDF | TEXT | DETAILS |
| Notice | Vermont Yankee Nuclear Power Station; Consideration of Approval of Transfer of License | [FR DOC# 2021-06766] | PDF | TEXT | DETAILS |
| Notice | Crystal River Unit 3 Nuclear Generating Plant; Consideration of Approval of Transfer of License | [FR DOC# 2021-06765] | PDF | TEXT | DETAILS |
1 April 2021 | |||
| Notice | Information Collection: Financial Protection Requirements and Indemnity Agreements | [FR DOC# 2021-06752] | PDF | TEXT | DETAILS |
| Notice | Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans | [FR DOC# 2021-06749] | PDF | TEXT | DETAILS |
| Notice | Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit 3 | [FR DOC# 2021-06686] | PDF | TEXT | DETAILS |
31 March 2021 | |||
| Proposed Rule | Measurement Standards Used at U.S. Nuclear Power Plants | [FR DOC# 2021-06432] | PDF | TEXT | DETAILS |
| Proposed Rule | Unified Agenda of Federal Regulatory and Deregulatory Actions+ | [FR DOC# 2021-04347] | PDF | TEXT | DETAILS |
29 March 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-06551] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Public Records | [FR DOC# 2021-06342] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Cask System, Certificate of Compliance No. 1014, Amendment No. 15 | [FR DOC# 2021-06330] | PDF | TEXT | DETAILS |
| Proposed Rule | List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Cask System, Certificate of Compliance No. 1014, Amendment No. 15 | [FR DOC# 2021-06329] | PDF | TEXT | DETAILS |
26 March 2021 | |||
| Notice | Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit 1 | [FR DOC# 2021-06328] | PDF | TEXT | DETAILS |
| Notice | Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility; and US Ecology, Inc.; Idaho Resource Conservation and Recovery Act Subtitle C Hazardous Disposal Facility Located Near Grand View, Idaho | [FR DOC# 2021-06301] | PDF | TEXT | DETAILS |
| Proposed Rule | American Society of Mechanical Engineers 2019-2020 Code Editions | [FR DOC# 2021-06085] | PDF | TEXT | DETAILS |
25 March 2021 | |||
| Notice | Department of the Navy; Environmental Assessment and Finding of No Significant Impact | [FR DOC# 2021-06134] | PDF | TEXT | DETAILS |
| Notice | Department of the Air Force; Environmental Assessment and Finding of No Significant Impact | [FR DOC# 2021-06133] | PDF | TEXT | DETAILS |
24 March 2021 | |||
| Proposed Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC Standardized NUHOMS® Horizontal Modular Storage System, Certificate of Compliance No. 1004, Renewed Amendment No. 17 | [FR DOC# 2021-06077] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: TN Americas LLC Standardized NUHOMS® Horizontal Modular Storage System, Certificate of Compliance No. 1004, Renewed Amendment No. 17 | [FR DOC# 2021-06076] | PDF | TEXT | DETAILS |
| Notice | Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2 | [FR DOC# 2021-06033] | PDF | TEXT | DETAILS |
23 March 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-06012] | PDF | TEXT | DETAILS |
| Notice | Information Collection: General Domestic Licenses for Byproduct Material | [FR DOC# 2021-05911] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-05248] | PDF | TEXT | DETAILS |
22 March 2021 | |||
| Notice | Exelon Generation Company, LLC; LaSalle County Station, Units 1 and 2 | [FR DOC# 2021-05833] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Standards for Protection Against Radiation | [FR DOC# 2021-05819] | PDF | TEXT | DETAILS |
19 March 2021 | |||
| Notice | Enhancing Participation in NRC Public Meetings | [FR DOC# 2021-05787] | PDF | TEXT | DETAILS |
| Notice | Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities | [FR DOC# 2021-05731] | PDF | TEXT | DETAILS |
| Notice | NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center | [FR DOC# 2021-05694] | PDF | TEXT | DETAILS |
| Notice | In the Matter of LaCrosseSolutions, LLC; La Crosse Boiling Water Reactor | [FR DOC# 2021-05681] | PDF | TEXT | DETAILS |
18 March 2021 | |||
| Proposed Rule | Alignment of Licensing Processes and Lessons Learned From New Reactor Licensing | [FR DOC# 2021-05570] | PDF | TEXT | DETAILS |
17 March 2021 | |||
| Notice | Information Collection: Fitness-for-Duty Programs | [FR DOC# 2021-05537] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Licensing Requirements for Land Disposal of Radioactive Waste | [FR DOC# 2021-05536] | PDF | TEXT | DETAILS |
| Notice | Emergency Response Planning and Preparedness for Nuclear Power Reactors | [FR DOC# 2021-05501] | PDF | TEXT | DETAILS |
16 March 2021 | |||
| Notice | Exelon Generation Company, LLC; TMI-2 Solutions, LLC; Three Mile Island Nuclear Station, Units 1 and 2 | [FR DOC# 2021-05396] | PDF | TEXT | DETAILS |
15 March 2021 | |||
| Notice | Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-05268] | PDF | TEXT | DETAILS |
12 March 2021 | |||
| Notice | Exelon Generation Company, LLC; LaSalle County Station, Units 1 and 2 | [FR DOC# 2021-05195] | PDF | TEXT | DETAILS |
11 March 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-05129] | PDF | TEXT | DETAILS |
| Notice | Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility; and US Ecology, Inc.; Idaho Resource Conservation and Recovery Act Subtitle C Hazardous Disposal Facility Located Near Grand View, Idaho | [FR DOC# 2021-05094] | PDF | TEXT | DETAILS |
10 March 2021 | |||
| Notice | New York State Energy Research and Development Authority; Irradiated Nuclear Fuel Processing Plant; Western New York State Nuclear Service Center | [FR DOC# 2021-05001] | PDF | TEXT | DETAILS |
| Notice | ADP CR3, LLC; Crystal River Unit 3 Nuclear Plant | [FR DOC# 2021-04997] | PDF | TEXT | DETAILS |
| Notice | Fresh and Spent Fuel Pool Criticality Analyses | [FR DOC# 2021-04955] | PDF | TEXT | DETAILS |
| Notice | 684th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-04952] | PDF | TEXT | DETAILS |
9 March 2021 | |||
| Notice | Information Collection: U.S .NRC Acquisition Regulation | [FR DOC# 2021-04865] | PDF | TEXT | DETAILS |
8 March 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-04894] | PDF | TEXT | DETAILS |
5 March 2021 | |||
| Notice | Design Review Guide for Instrumentation and Controls for Non-Light-Water Reactor Reviews | [FR DOC# 2021-04640] | PDF | TEXT | DETAILS |
| Notice | NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Post-Shutdown Decommissioning Activities Report | [FR DOC# 2021-04631] | PDF | TEXT | DETAILS |
2 March 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-04403] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste | [FR DOC# 2021-04202] | PDF | TEXT | DETAILS |
25 February 2021 | |||
| Notice | Changes to Subsequent License Renewal Guidance Documents | [FR DOC# 2021-03917] | PDF | TEXT | DETAILS |
| Notice | Guidance for Changes During Construction for New Nuclear Power Plants Licenses | [FR DOC# 2021-03865] | PDF | TEXT | DETAILS |
24 February 2021 | |||
| Notice | Online Portal for Requesting Evaluation of Proposed Alternatives | [FR DOC# 2021-03815] | PDF | TEXT | DETAILS |
| Notice | Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-03743] | PDF | TEXT | DETAILS |
23 February 2021 | |||
| Notice | Information Collection: Notices, Instructions and Reports to Workers: Inspection and Investigations | [FR DOC# 2021-03557] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Form 64, Travel Voucher | [FR DOC# 2021-03551] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-03107] | PDF | TEXT | DETAILS |
22 February 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-03529] | PDF | TEXT | DETAILS |
| Notice | Setpoints for Safety-Related Instrumentation | [FR DOC# 2021-03466] | PDF | TEXT | DETAILS |
| Notice | Design Limits, Loading Combinations, Materials, Construction and Testing of Concrete Containments | [FR DOC# 2021-03457] | PDF | TEXT | DETAILS |
| Notice | Final Revision to Branch Technical Position 7-19 Guidance for Evaluation of Defense in Depth and Diversity to Address Common-Cause Failure Due to Latent Design Defects in Digital Safety Systems; Correction | [FR DOC# 2021-03435] | PDF | TEXT | DETAILS |
| Proposed Rule | Revision of Fee Schedules; Fee Recovery for Fiscal Year 2021 | [FR DOC# 2021-03282] | PDF | TEXT | DETAILS |
19 February 2021 | |||
| Notice | Information Collection: Domestic Licensing of Production and Utilization Facilities | [FR DOC# 2021-03357] | PDF | TEXT | DETAILS |
18 February 2021 | |||
| Notice | Environmental Qualification of Certain Electrical Equipment Important to Safety for Nuclear Power Plants | [FR DOC# 2021-03220] | PDF | TEXT | DETAILS |
16 February 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-03108] | PDF | TEXT | DETAILS |
12 February 2021 | |||
| Notice | 683rd Meeting of the Advisory Committee on Reactor Safeguards (ACRS) | [FR DOC# 2021-02884] | PDF | TEXT | DETAILS |
11 February 2021 | |||
| Notice | Energy Harbor Nuclear Corp.; Beaver Valley Power Station, Unit 1 | [FR DOC# 2021-02805] | PDF | TEXT | DETAILS |
| Notice | Service Contract Inventory | [FR DOC# 2021-02794] | PDF | TEXT | DETAILS |
10 February 2021 | |||
| Notice | Safety-Related Steel Structures and Steel-Plate Composite Walls for Other Than Reactor Vessels and Containments | [FR DOC# 2021-02720] | PDF | TEXT | DETAILS |
| Notice | Advisory Committee on the Medical Uses of Isotopes: Meeting Notice | [FR DOC# 2021-02688] | PDF | TEXT | DETAILS |
9 February 2021 | |||
| Rule | Criteria for Development of Evacuation Time Estimate Studies (NUREG/CR-7002, Revision 1) | [FR DOC# 2021-02584] | PDF | TEXT | DETAILS |
8 February 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-02672] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Form 354, Data Report on Spouse | [FR DOC# 2021-02510] | PDF | TEXT | DETAILS |
5 February 2021 | |||
| Notice | United Nuclear Corporation Church Rock Project | [FR DOC# 2021-02360] | PDF | TEXT | DETAILS |
4 February 2021 | |||
| Notice | Palisades Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments | [FR DOC# 2021-02357] | PDF | TEXT | DETAILS |
3 February 2021 | |||
| Notice | U.S. Department of Energy National Nuclear Security Administration | [FR DOC# 2021-02249] | PDF | TEXT | DETAILS |
| Notice | Report on Waste Burial Charges; Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities | [FR DOC# 2021-02189] | PDF | TEXT | DETAILS |
2 February 2021 | |||
| Proposed Rule | Items Containing Byproduct Material Incidental to Production | [FR DOC# 2021-02158] | PDF | TEXT | DETAILS |
| Notice | Advisory Committee on the Medical Uses of Isotopes: Call for Nominations | [FR DOC# 2021-02112] | PDF | TEXT | DETAILS |
| Notice | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information | [FR DOC# 2021-01310] | PDF | TEXT | DETAILS |
| Proposed Rule | Approval of American Society of Mechanical Engineers' Code Cases | [FR DOC# 2021-00890] | PDF | TEXT | DETAILS |
1 February 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-02175] | PDF | TEXT | DETAILS |
| Notice | Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 | [FR DOC# 2021-02001] | PDF | TEXT | DETAILS |
29 January 2021 | |||
| Notice | Final Revision to Branch Technical Position 7-19 Guidance for Evaluation of Defense in Depth and Diversity To Address Common-Cause Failure Due to Latent Design Defects in Digital Safety Systems | [FR DOC# 2021-01984] | PDF | TEXT | DETAILS |
| Notice | Notice of Consolidation Effort To Streamline the Review Process Pertaining to Staff Guidance for Spent Fuel Storage and Radioactive Material Transportation Packages | [FR DOC# 2021-01966] | PDF | TEXT | DETAILS |
| Proposed Rule | Alignment of Licensing Processes and Lessons Learned From New Reactor Licensing | [FR DOC# 2021-01860] | PDF | TEXT | DETAILS |
27 January 2021 | |||
| Notice | In the Matter of Tennessee Valley Authority Bellefonte Nuclear Plant, Units 1 and 2 | [FR DOC# 2021-01754] | PDF | TEXT | DETAILS |
| Notice | Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of Licenses | [FR DOC# 2021-01742] | PDF | TEXT | DETAILS |
26 January 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-01689] | PDF | TEXT | DETAILS |
| Notice | Monthly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations | [FR DOC# 2021-01494] | PDF | TEXT | DETAILS |
22 January 2021 | |||
| Notice | NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Units 1 and 2 | [FR DOC# 2021-01410] | PDF | TEXT | DETAILS |
| Notice | Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Westinghouse AP1000 Pressurized Water Reactors | [FR DOC# 2021-01406] | PDF | TEXT | DETAILS |
| Notice | Consolidated Decommissioning Guidance, Characterization, Survey, and Determination of Radiological Criteria | [FR DOC# 2021-01379] | PDF | TEXT | DETAILS |
21 January 2021 | |||
| Notice | Information Collection: Collection of Operator Simulator Training Data | [FR DOC# 2021-01203] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Domestic Licensing of Special Nuclear Material | [FR DOC# 2021-01201] | PDF | TEXT | DETAILS |
| Notice | An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications | [FR DOC# 2021-01154] | PDF | TEXT | DETAILS |
19 January 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-01225] | PDF | TEXT | DETAILS |
| Notice | Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency | [FR DOC# 2021-01091] | PDF | TEXT | DETAILS |
| Notice | Tennessee Valley Authority Bellefonte, Units 1 and 2 Environmental Assessment and Finding of No Significant Impact | [FR DOC# 2021-01050] | PDF | TEXT | DETAILS |
| Notice | Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized-Water Reactors | [FR DOC# 2021-01041] | PDF | TEXT | DETAILS |
| Notice | Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants | [FR DOC# 2021-00940] | PDF | TEXT | DETAILS |
15 January 2021 | |||
| Rule | Non-Substantive Amendments to Adjudicatory Proceeding Requirements | [FR DOC# 2021-00824] | PDF | TEXT | DETAILS |
| Rule | Adjustment of Civil Penalties for Inflation for Fiscal Year 2021 | [FR DOC# 2021-00127] | PDF | TEXT | DETAILS |
13 January 2021 | |||
| Notice | Sigma-Aldrich Company; Fort Mims Site | [FR DOC# C1-2020-28065] | PDF | TEXT | DETAILS |
| Rule | List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM UMAX Canister Storage System, Certificate of Compliance No. 1040, Amendment No. 4 | [FR DOC# 2021-00231] | PDF | TEXT | DETAILS |
12 January 2021 | |||
| Notice | Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Unit 3; Unit 3 Auxiliary Building Wall 11 Seismic Gap Requirements | [FR DOC# 2021-00410] | PDF | TEXT | DETAILS |
| Notice | Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit No. 2 | [FR DOC# 2021-00368] | PDF | TEXT | DETAILS |
| Notice | Fire Protection Program for Nuclear Power Plants During Decommissioning | [FR DOC# 2021-00334] | PDF | TEXT | DETAILS |
| Notice | Information Collection: NRC Form 483, “Registration Certificate-In Vitro Testing with Byproduct Material Under General License” | [FR DOC# 2021-00331] | PDF | TEXT | DETAILS |
11 January 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2021-00414] | PDF | TEXT | DETAILS |
| Notice | Holtec Decommissioning International, LLC | [FR DOC# 2021-00201] | PDF | TEXT | DETAILS |
8 January 2021 | |||
| Notice | Tennessee Valley Authority, Watts Bar Nuclear Plant, Unit 2 | [FR DOC# 2021-00153] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Public Records | [FR DOC# 2021-00111] | PDF | TEXT | DETAILS |
| Notice | Information Collection: Voluntary Reporting of Performance Indicators | [FR DOC# 2021-00077] | PDF | TEXT | DETAILS |
7 January 2021 | |||
| Notice | Information Collection: Voluntary Reporting of Planned New Reactor Applications; Withdrawal | [FR DOC# 2020-29320] | PDF | TEXT | DETAILS |
| Proposed Rule | Calculated Maximum Fuel Element Cladding Temperature | [FR DOC# 2020-29151] | PDF | TEXT | DETAILS |
6 January 2021 | |||
| Notice | Information Collection: NRC Form 446, “Request for Approval of Official Foreign Travel by Non-Government Personnel” | [FR DOC# 2020-29195] | PDF | TEXT | DETAILS |
5 January 2021 | |||
| Notice | Licensing Support Network Advisory Review Panel | [FR DOC# 2020-29170] | PDF | TEXT | DETAILS |
| Notice | Measuring, Evaluating, and Reporting Radioactive Material in Liquid and Gaseous Effluents and Solid Waste | [FR DOC# 2020-29154] | PDF | TEXT | DETAILS |
4 January 2021 | |||
| Notice | Sunshine Act Meetings | [FR DOC# 2020-29174] | PDF | TEXT | DETAILS |
Page Last Reviewed/Updated Wednesday, May 27, 2026
Page Last Reviewed/Updated Wednesday, May 27, 2026