31 December 2018
|
No NRC notices published. |
28 December 2018
Notices |
Exemptions: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station |
Pages 67365 – 67368 [FR DOC # 2018–28202] |
PDF | TEXT | DETAILS |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station |
Pages 67368 – 67372 [FR DOC # 2018–28203] |
PDF | TEXT | DETAILS |
27 December 2018
Rules and Regulations |
List of Approved Spent Fuel Storage Casks: TN Americas LLC Standardized Advanced NUHOMS® System, Certificate of Compliance No. 1029, Amendment No. 4 |
Pages 66585 – 66590 [FR DOC # 2018–27949] |
PDF | TEXT | DETAILS |
Proposed Rules |
List of Approved Spent Fuel Storage Casks: TN Americas LLC Standardized Advanced NUHOMS® System, Certificate of Compliance No. 1029, Amendment No. 4 |
Pages 66644 – 66646 [FR DOC # 2018–27950] |
PDF | TEXT | DETAILS |
Notices |
Sunshine Act Meetings |
Pages 66765 – 66765 [FR DOC # 2018–28050] |
PDF | TEXT | DETAILS |
License Renewals: |
Entergy Operations, Inc.; River Bend Station, Unit 1 |
Pages 66766 – 66766 [FR DOC # 2018–28129] |
PDF | TEXT | DETAILS |
26 December 2018
Rules and Regulations |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: TN Americas LLC, Standardized NUHOMS® System, Certificate of Compliance No. 1004, Renewed Amendment No. 15 |
Pages 66079 – 66080 [FR DOC # 2018–27810] |
PDF | TEXT | DETAILS |
Notices |
Guidance: |
Spent Fuel Heat Generation in an Independent Spent Fuel Storage Installation |
Pages 66317 – 66318 [FR DOC # 2018–27931] |
PDF | TEXT | DETAILS |
License Amendments; Applications: |
Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4 |
Pages 66318 – 66323 [FR DOC # 2018–27844] |
PDF | TEXT | DETAILS |
License Renewal Applications: |
Pacific Gas & Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation; Renewal of Special Nuclear Materials License |
Pages 66314 – 66316 [FR DOC # 2018–27832] |
PDF | TEXT | DETAILS |
Meetings: |
Revised 660th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) |
Pages 66316 – 66317 [FR DOC # 2018–27846] |
PDF | TEXT | DETAILS |
21 December 2018
Notices |
Guidance: |
Instructions for Completing NRC's Uniform Low-Level Radioactive Waste Manifest |
Pages 65759 – 65760 [FR DOC # 2018–27630] |
PDF | TEXT | DETAILS |
Meetings: |
Entergy Nuclear Operations, Inc.; Pilgrim Nuclear Power Station |
Pages 65760 – 65761 [FR DOC # 2018–27724] |
PDF | TEXT | DETAILS |
20 December 2018
Rules and Regulations |
Clarification of the Requirements for Reactor Pressure Vessel Upper Head Bare Metal Visual Examinations |
Pages 65283 – 65283 [FR DOC # 2018–27517] |
PDF | TEXT | DETAILS |
Notices |
Environmental Impact Statements; Availability, etc.: |
Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 |
Pages 65367 – 65369 [FR DOC # 2018–27547] |
PDF | TEXT | DETAILS |
Establishment of Atomic Safety and Licensing Board: |
Establishment of Atomic Safety and Licensing Board: Andres Paez |
Pages 65369 – 65369 [FR DOC # 2018–27529] |
PDF | TEXT | DETAILS |
19 December 2018
Rules and Regulations |
Update to Fees for Search and Review of Agency Records by NRC Personnel |
Pages 65075 – 65077 [FR DOC # 2018–27434] |
PDF | TEXT | DETAILS |
List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 6 |
Pages 65077 – 65077 [FR DOC # 2018–27436] |
PDF | TEXT | DETAILS |
Proposed Rules |
Update to Fees for Search and Review of Agency Records by NRC Personnel |
Pages 65110 – 65111 [FR DOC # 2018–27168] |
PDF | TEXT | DETAILS |
Notices |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on NuScale |
Pages 65184 – 65184 [FR DOC # 2018–27418] |
PDF | TEXT | DETAILS |
18 December 2018
Rules and Regulations |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: NAC International Multi-Purpose Canister Storage System, Certificate of Compliance No. 1025, Amendment Nos. 7 and 8 |
Pages 64729 – 64734 [FR DOC # 2018–27284] |
PDF | TEXT | DETAILS |
Proposed Rules |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: NAC International Multi-Purpose Canister Storage System, Certificate of Compliance No. 1025, Amendment Nos. 7 and 8 |
Pages 64750 – 64752 [FR DOC # 2018–27286] |
PDF | TEXT | DETAILS |
Notices |
Environmental Assessments; Availability, etc.: |
Waste Control Specialists LLC |
Pages 64902 – 64904 [FR DOC # 2018–27323] |
PDF | TEXT | DETAILS |
Establishment of Atomic Safety and Licensing Board: |
Establishment of Atomic Safety and Licensing Board: Exelon Generation Company, LLC |
Pages 64902 – 64902 [FR DOC # 2018–27276] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 64889 – 64902 [FR DOC # 2018–26968] |
PDF | TEXT | DETAILS |
17 December 2018
Notices |
Sunshine Act Meetings |
Pages 64606 – 64607 [FR DOC # 2018–27400] |
PDF | TEXT | DETAILS |
License Applications: |
Virginia Electric and Power Company; Dominion Energy Virginia; Surry Power Station, Unit Nos. 1 and 2 |
Pages 64606 – 64606 [FR DOC # 2018–27215] |
PDF | TEXT | DETAILS |
14 December 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Requests to Agreement States for Information |
Pages 64373 – 64374 [FR DOC # 2018–27164] |
PDF | TEXT | DETAILS |
13 December 2018
|
No NRC notices published. |
12 December 2018
Proposed Rules |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Multipurpose Canister Cask System, Certificate of Compliance No. 1014, Amendment Nos. 11 and 12 |
Pages 63814 – 63817 [FR DOC # 2018–26878] |
PDF | TEXT | DETAILS |
Rules and Regulations |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: Holtec International HI-STORM 100 Multipurpose Canister Cask System, Certificate of Compliance No. 1014, Amendment Nos. 11 and 12 |
Pages 63794 – 63799 [FR DOC # 2018–26877] |
PDF | TEXT | DETAILS |
11 December 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: NRC Form 748, National Source Tracking Transaction Report |
Pages 63686 – 63687 [FR DOC # 2018–26747] |
PDF | TEXT | DETAILS |
Information Collection: Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3, of the Near Term Task Force Review of Insights From the Fukushima Dai-ichi Event |
Pages 63687 – 63688 [FR DOC # 2018–26746] |
PDF | TEXT | DETAILS |
License Terminations: |
Sacramento Municipal Utility District; Rancho Seco Nuclear Generating Station; Correction |
Pages 63688 – 63689 [FR DOC # 2018–26744] |
PDF | TEXT | DETAILS |
10 December 2018
Notices |
Sunshine Act Meetings |
Pages 63543 – 63544 [FR DOC # 2018–26820] |
PDF | TEXT | DETAILS |
Charter Renewals: |
Advisory Committee on Reactor Safeguards; Charter Renewal |
Pages 63544 – 63545 [FR DOC # 2018–26592] |
PDF | TEXT | DETAILS |
License Applications; Renewals: |
Virginia Electric and Power Company; Dominion Energy Virginia; Surry Power Station, Unit Nos. 1 and 2 |
Pages 63541 – 63543 [FR DOC # 2018–26614] |
PDF | TEXT | DETAILS |
License Transfer Applications: |
Oyster Creek Nuclear Generating Station; Consideration of Approval of Transfer of License and Conforming Amendment |
Pages 63544 – 63544 [FR DOC # 2018–26615] |
PDF | TEXT | DETAILS |
07 December 2018
Notices |
Meetings: |
Advisory Committee on Reactor Safeguards; Procedures for Meetings |
Pages 63189 – 63190 [FR DOC # 2018–26506] |
PDF | TEXT | DETAILS |
06 December 2018
|
No NRC notices published. |
04 December 2018
Notices |
Sunshine Act Meetings |
Pages 62609 – 62609 [FR DOC # 2018–26454] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 62617 – 62617 [FR DOC # 2018–25452] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 62618 – 62626 [FR DOC # 2018–25728] |
PDF | TEXT | DETAILS |
Guidance: |
Fuel Cycle Safety, Safeguards, and Environmental Review Interim Staff Guidance |
Pages 62617 – 62618 [FR DOC # 2018–26225] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Planning and Procedures |
Pages 62626 – 62626 [FR DOC # 2018–26226] |
PDF | TEXT | DETAILS |
03 December 2018
|
No NRC notices published. |
 |
30 November 2018
Notices |
Performance Review Boards for Senior Executive Service; Revision |
Pages 61685 – 61685 [FR DOC # 2018–26018] |
PDF | TEXT | DETAILS |
29 November 2018
|
No NRC notices published. |
28 November 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Operators' Licenses |
Pages 61169 – 61170 [FR DOC # 2018–25936] |
PDF | TEXT | DETAILS |
Information Collection: Domestic Licensing of Source Material |
Pages 61170 – 61171 [FR DOC # 2018–25935] |
PDF | TEXT | DETAILS |
Information Collection: NRC Form 531, "Request for Taxpayer Identification Number" |
Pages 61171 – 61172 [FR DOC # 2018–25937] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Calvert Cliffs Independent Spent Fuel Storage Installation; James A. FitzPatrick Nuclear Power Plant; Nine Mile Point Nuclear Station, Units 1 and 2 |
Pages 61172 – 61174 [FR DOC # 2018–25930] |
PDF | TEXT | DETAILS |
27 November 2018
|
No NRC notices published. |
26 November 2018
Notices |
Environmental Impact Statements; Availability, etc.: |
Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3 |
Pages 60507 – 60508 [FR DOC # 2018–25695] |
PDF | TEXT | DETAILS |
Meetings: |
Omaha Public Power District, Fort Calhoun Station, Unit No. 1, Partial Site Release |
Pages 60508 – 60509 [FR DOC # 2018–25666] |
PDF | TEXT | DETAILS |
23 November 2018
Notices |
Sunshine Act Meetings |
Pages 59424 – 59425 [FR DOC # 2018–25701] |
PDF | TEXT | DETAILS |
Establishment of Atomic Safety and Licensing Board: |
Establishment of Atomic Safety and Licensing Board: Interim Storage Partners LLC |
Pages 59424 – 59424 [FR DOC # 2018–25453] |
PDF | TEXT | DETAILS |
21 November 2018
Rules and Regulations |
Miscellaneous Corrections-Organizational Changes |
Pages 58721 – 58724 [FR DOC # 2018–25378] |
PDF | TEXT | DETAILS |
Notices |
Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the Wyoming Department of Environmental Quality |
Pages 58787 – 587880 [FR DOC # 2018–25367] |
PDF | TEXT | DETAILS |
20 November 2018
Rules and Regulations |
Miscellaneous Corrections |
Pages 58463 – 58466 [FR DOC # 2018–25181] |
PDF | TEXT | DETAILS |
Proposed Rules |
Elimination of Immediate Notification Requirements for Non-Emergency Events |
Pages 58509 – 58510 [FR DOC # 2018–25273] |
PDF | TEXT | DETAILS |
Notices |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 58607 – 58626 [FR DOC # 2018–24894] |
PDF | TEXT | DETAILS |
Meetings: |
659th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) |
Pages 58606 – 58607 [FR DOC # 2018–25250] |
PDF | TEXT | DETAILS |
19 November 2018
|
No NRC notices published. |
16 November 2018
Regulatory Agenda |
Semiannual Regulatory Agenda: |
Unified Agenda of Federal Regulatory and Deregulatory Actions |
Pages 58164 – 58166 [FR DOC # 2018–23931] |
PDF | TEXT | DETAILS |
Notices |
Proposed Revisions to SRPs 2.3.3, Onsite Meteorological Measurements Program; 2.4.6, Tsunami Hazards; and 2.4.9, Channel Migration or Diversion |
Pages 57751 – 57752 [FR DOC # 2018–25052] |
PDF | TEXT | DETAILS |
Sunshine Act Meetings |
Pages 57752 – 57753 [FR DOC # 2018–25209] |
PDF | TEXT | DETAILS |
Proposed Revisions to SRP 2.5.3, Surface Deformation |
Pages 57753 – 57754 [FR DOC # 2018–25064] |
PDF | TEXT | DETAILS |
15 November 2018
|
No NRC notices published. |
14 November 2018
Notices |
Sunshine Act Meetings |
Pages 56876 – 56876 [FR DOC # 2018–24948] |
PDF | TEXT | DETAILS |
Information Collection: NRC Form 171, "Duplication Request" |
Pages 56884 – 56885 [FR DOC # 2018–24771] |
PDF | TEXT | DETAILS |
Information Collection: Form 790, Classification Record |
Pages 56885 – 56886 [FR DOC # 2018–24772] |
PDF | TEXT | DETAILS |
Environmental Impact Statements; Availability, etc.: |
Entergy Operations, Inc., River Bend Station, Unit 1 |
Pages 56880 – 56881 [FR DOC # 2018–24813] |
PDF | TEXT | DETAILS |
Exemptions: |
ZionSolutions, LLC; Zion Nuclear Power Station, Units 1 and 2; Independent Spent Fuel Storage Installation |
Pages 56881 – 56883 [FR DOC # 2018–24726] |
PDF | TEXT | DETAILS |
License Amendments: |
Watts Bar Nuclear Plant, Unit 2 |
Pages 56876 – 56879 [FR DOC # 2018–24814] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS); Subcommittee on Regulatory Policies and Practices |
Pages 56879 – 56880 [FR DOC # 2018–24749] |
PDF | TEXT | DETAILS |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS); Subcommittee on Plant License Renewal |
Pages 56883 – 56883 [FR DOC # 2018–24751] |
PDF | TEXT | DETAILS |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS); Subcommittee on Thermal-Hydraulic Phenomena |
Pages 56884 – 56884 [FR DOC # 2018–24750] |
PDF | TEXT | DETAILS |
13 November 2018
Notices |
Exemptions: |
Exemption; Issuance: Northwest Medical Isotopes, LLC; Medical Radioisotope Production Facility |
Pages 56379 – 56380 [FR DOC # 2018–24312] |
PDF | TEXT | DETAILS |
09 November 2018
Proposed Rules |
American Society of Mechanical Engineers 2015-2017 Code Editions Incorporation by Reference |
Pages 56156 – 56196 [FR DOC # 2018–24076] |
PDF | TEXT | DETAILS |
08 November 2018
|
No NRC notices published. |
07 November 2018
Rules and Regulations |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: TN Americas LLC, Standardized NUHOMS® System, Certificate of Compliance No. 1004, Renewed Amendment No. 15 |
Pages 55601 – 55606 [FR DOC # 2018–24255] |
PDF | TEXT | DETAILS |
Proposed Rules |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: TN Americas LLC, Standardized NUHOMS® System, Certificate of Compliance No. 1004, Renewed Amendment No. 15 |
Pages 55643 – 55646 [FR DOC # 2018–24256] |
PDF | TEXT | DETAILS |
Notices |
License Amendment Applications: |
U.S. Army Ranges With Davy Crockett Depleted Uranium |
Pages 55759 – 55761 [FR DOC # 2018–24277] |
PDF | TEXT | DETAILS |
06 November 2018
Notices |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 55561 – 55568 [FR DOC # 2018–22576] |
PDF | TEXT | DETAILS |
Sunshine Act Meetings |
Pages 55579 – 55579 [FR DOC # 2018–24324] |
PDF | TEXT | DETAILS |
Charter Establishments: |
Establishment of Atomic Safety and Licensing Board: Holtec International |
Pages 55578 – 55579 [FR DOC # 2018–24193] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 55568 – 55578 [FR DOC # 2018–23782] |
PDF | TEXT | DETAILS |
05 November 2018
Notices |
Report on Changes to Low-Level Waste Burial Charges |
Pages 55409 – 55409 [FR DOC # 2018–24079] |
PDF | TEXT | DETAILS |
02 November 2018
Proposed Rules |
Categorization of the Licensee Fee Category for Full-Cost Recovery |
Pages 55113 – 55114 [FR DOC # 2018–24002] |
PDF | TEXT | DETAILS |
Notices |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Planning and Procedures |
Pages 55208 – 55209 [FR DOC # 2018–23986] |
PDF | TEXT | DETAILS |
01 November 2018
Notices |
Exemptions and Combined Licenses: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4, Equipment Survivability Assessment |
Pages 54951 – 54952 [FR DOC # 2018–23869] |
PDF | TEXT | DETAILS |
Exemptions: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Exemptions |
Pages 54948 – 54951 [FR DOC # 2018–23840] |
PDF | TEXT | DETAILS |
License Renewals; Applications: |
Virginia Electric and Power Company; Dominion Energy Virginia; Surry Power Station, Units 1 and 2 |
Pages 54948 – 54948 [FR DOC # 2018–23841] |
PDF | TEXT | DETAILS |
 |
31 October 2018
Proposed Rules |
List of Approved Spent Fuel Storage Casks: NAC International NAC-UMS® ; Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 6 |
Pages 54684 – 54684 [FR DOC # 2018–22913] |
PDF | TEXT | DETAILS |
Notices |
Environmental Assessments; Availability, etc.: |
Honeywell, International, Inc.; Metropolis Works Uranium Conversion Facility |
Pages 54787 – 54789 [FR DOC # 2018–23781] |
PDF | TEXT | DETAILS |
License Applications: |
Perma-Fix Northwest Richland, Inc.; Correction |
Pages 54787 – 54787 [FR DOC # 2018–23828] |
PDF | TEXT | DETAILS |
30 October 2018
Notices |
Instructions for Completing NRC's Uniform Low-Level Radioactive Waste Manifest |
Pages 54620 – 54621 [FR DOC # 2018–23694] |
PDF | TEXT | DETAILS |
Sunshine Act Meetings |
Pages 54621 – 54622 [FR DOC # 2018–23764] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Changes to Tier 2* Departure Evaluation Process |
Pages 54622 – 54623 [FR DOC # 2018–23627] |
PDF | TEXT | DETAILS |
Meetings: |
Revised 658th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) |
Pages 54623 – 54624 [FR DOC # 2018–23619] |
PDF | TEXT | DETAILS |
29 October 2018
Notices |
Training and Experience Requirements for Different Categories of Radiopharmaceuticals |
Pages 54380 – 54382 [FR DOC # 2018–23521] |
PDF | TEXT | DETAILS |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material |
Pages 54382 – 54383 [FR DOC # 2018–23493] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Water Remediation Technology, LLC |
Pages 54378 – 54380 [FR DOC # 2018–23509] |
PDF | TEXT | DETAILS |
26 October 2018
|
No NRC notices published. |
25 October 2018
Notices |
Exemptions: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station |
Pages 53914 – 53917 [FR DOC # 2018–23300] |
PDF | TEXT | DETAILS |
24 October 2018
Notices |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Fire Protection System Nonsafety Cable Spray Removal |
Pages 53665 – 53666 [FR DOC # 2018–23191] |
PDF | TEXT | DETAILS |
License Applications: |
Perma-Fix Northwest Richland, Inc. |
Pages 53666 – 53669 [FR DOC # 2018–23164] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Future Plant Designs |
Pages 53666 – 53666 [FR DOC # 2018–23169] |
PDF | TEXT | DETAILS |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Plant License Renewal |
Pages 53669 – 53669 [FR DOC # 2018–23170] |
PDF | TEXT | DETAILS |
23 October 2018
Notices |
Sunshine Act Meetings |
Pages 53521 – 53521 [FR DOC # 2018–23253] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 53509 – 53520 [FR DOC # 2018–22654] |
PDF | TEXT | DETAILS |
Hearings: |
Atomic Safety and Licensing Board Panel |
Pages 53521 – 53522 [FR DOC # 2018–23085] |
PDF | TEXT | DETAILS |
Meetings: |
658th Meeting of the Advisory Committee on Reactor Safeguards (ACRS) |
Pages 53520 – 53521 [FR DOC # 2018–23043] |
PDF | TEXT | DETAILS |
22 October 2018
Rules and Regulations |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: NAC International NAC–UMS® Universal Storage System, Certificate of Compliance; No. 1015, Amendment No. 6 |
Pages 53159 – 53163 [FR DOC # 2018–22912] |
PDF | TEXT | DETAILS |
Proposed Rules |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: NAC International NAC–UMS® ; Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 6 |
Pages 53191 – 53193 [FR DOC # 2018–22913] |
PDF | TEXT | DETAILS |
Notices |
Exemptions: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station Request for Exemptions Regarding Emergency Planning Requirements |
Pages 53317 – 53321 [FR DOC # 2018–22986] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Containment Sump Level Instrumentation |
Pages 53315 – 53317 [FR DOC # 2018–22983] |
PDF | TEXT | DETAILS |
Inspections, Tests, Analyses, and Acceptance Criteria: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria |
Pages 53321 – 53322 [FR DOC # 2018–22985] |
PDF | TEXT | DETAILS |
19 October 2018
Notices |
Performance Review Boards for Senior Executive Service |
Pages 53118 – 53119 [FR DOC # 2018–22844] |
PDF | TEXT | DETAILS |
Direct Transfers of Licenses; Applications: |
Oyster Creek Nuclear Generating Station; Consideration of Approval of Transfer of License and Conforming Amendment |
Pages 53119 – 53122 [FR DOC # 2018–22831] |
PDF | TEXT | DETAILS |
Environmental Impact Statements; Availability, etc.: |
Interim Storage Partners LLC's Consolidated Interim Storage Facility |
Pages 53115 – 53116 [FR DOC # 2018–22810] |
PDF | TEXT | DETAILS |
License Transfers: |
In the Matter of Entergy Nuclear Vermont Yankee, LLC; Entergy Nuclear Operations, Inc.; NorthStar Vermont Yankee LLC; NorthStar Nuclear Decommissioning Company, LLC; Vermont Yankee Nuclear Power Station |
Pages 53116 – 53118 [FR DOC # 2018–22768] |
PDF | TEXT | DETAILS |
18 October 2018
|
No NRC notices published. |
17 October 2018
Notices |
Exemptions: |
NorthStar Group Services, Inc.; Vermont Yankee Nuclear Power Station |
Pages 52573 – 52575 [FR DOC # 2018–22649] |
PDF | TEXT | DETAILS |
Guidance: |
Environmental Dosimetry-Performance Specifications, Testing, and Data Analysis |
Pages 52576 – 52577 [FR DOC # 2018–22550] |
PDF | TEXT | DETAILS |
16 October 2018
|
No NRC notices published. |
15 October 2018
|
No NRC notices published. |
12 October 2018
Notices |
Sunshine Act Meetings |
Pages 51711 – 51712 [FR DOC # 2018–22406] |
PDF | TEXT | DETAILS |
Regulatory Guide; Applications: |
Regulatory Guide 1.206—Applications for Nuclear Power Plants |
Pages 51712 – 51713 [FR DOC # 2018–22262] |
PDF | TEXT | DETAILS |
11 October 2018
Rules and Regulations |
Standard Design Approvals: |
Korea Electric Power Corporation; Korea Hydro & Nuclear Power Co., Ltd. Advanced Power Reactor 1400 |
Pages 51304 – 51304 [FR DOC # 2018–22116] |
PDF | TEXT | DETAILS |
Notices |
License Transfers: |
Renewed Operating License No. NPF–12; Combined License Nos. NPF–93 and NPF–94; and the General License for the Independent Spent Fuel Storage Installation (ISFSI); In the Matter of Dominion Energy, Inc., and SCANA Corporation Virgil C. Summer Nuclear Station (VCSNS), Units 1, 2, and 3, and the ISFSI |
Pages 51506 – 51509 [FR DOC # 2018–22159] |
PDF | TEXT | DETAILS |
La Crosse Boiling Water Reactor; Consideration of Approval of Transfer of License and Conforming Amendment |
Pages 51509 – 51512 [FR DOC # 2018–22100] |
PDF | TEXT | DETAILS |
10 October 2018
Notices |
Dry Storage and Transportation of High Burnup Spent Nuclear Fuel |
Pages 50965 – 50966 [FR DOC # 2018–21974] |
PDF | TEXT | DETAILS |
Sunshine Act Meetings |
Pages 50966 – 50966 [FR DOC # 2018–22066] |
PDF | TEXT | DETAILS |
Information Collection: Submission for the Office of Management and Budget (OMB) Review; Comment Request |
Pages 50969 – 50970 [FR DOC # 2018–21988] |
PDF | TEXT | DETAILS |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: NRC Form 396, "Certification of Medical Examination by Facility Licensee" |
Pages 50963 – 50964 [FR DOC # 2018–21976] |
PDF | TEXT | DETAILS |
Information Collection: NRC Form 398, "Personal Qualification Statement-Licensee." |
Pages 50970 – 50971 [FR DOC # 2018–21993] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
NorthStar Group Services, Inc. on Behalf of Entergy Nuclear Vermont Yankee, LLC; Vermont Yankee Nuclear Power Station |
Pages 50966 – 50969 [FR DOC # 2018–21914] |
PDF | TEXT | DETAILS |
License Applications; Amendments: |
NexEra Energy Duane Arnold, LLC; Duane Arnold Energy Center |
Pages 50964 – 50965 [FR DOC # 2018–21913] |
PDF | TEXT | DETAILS |
Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 |
Pages 50971 – 50975 [FR DOC # 2018–22016] |
PDF | TEXT | DETAILS |
09 October 2018
Proposed Rules |
Agency Procedures for Responding to Adverse Court Decisions and Addressing Funding Shortfalls |
Pages 50533 – 50536 [FR DOC # 2018–21804] |
PDF | TEXT | DETAILS |
Notices |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and Updates to Tier 1 Table 2.5.2-3 |
Pages 50700 – 50702 [FR DOC # 2018–21912] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 50691 – 50700 [FR DOC # 2018–21669] |
PDF | TEXT | DETAILS |
05 October 2018
|
No NRC notices published. |
04 October 2018
Notices |
License Terminations: |
Westinghouse Electric Company, LLC; Hematite Site |
Pages 50123 – 50124 [FR DOC # 2018–21583] |
PDF | TEXT | DETAILS |
03 October 2018
Notices |
Guidance: |
Nuclear Criticality Safety Standards for Nuclear Materials Outside Reactor Cores |
Pages 49956 – 49956 [FR DOC # 2018–21534] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Regulatory Policies and Practices |
Pages 49955 – 49956 [FR DOC # 2018–21530] |
PDF | TEXT | DETAILS |
02 October 2018
Notices |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information |
Pages 49587 – 49594 [FR DOC # 2018–20182] |
PDF | TEXT | DETAILS |
Sunshine Act Meetings |
Pages 49596 – 49596 [FR DOC # 2018–21527] |
PDF | TEXT | DETAILS |
Confirmatory Orders: |
In the Matter of Harman International Industries, Inc.; Confirmatory Order |
Pages 49583 – 49587 [FR DOC # 2018–21397] |
PDF | TEXT | DETAILS |
License Renewals: |
Power Resources Inc.; Smith Ranch Highland |
Pages 49594 – 49596 [FR DOC # 2018–21429] |
PDF | TEXT | DETAILS |
01 October 2018
Notices |
Use of Listserv for Decommissioning and Uranium Recovery Site Correspondence |
Pages 49434 – 49434 [FR DOC # 2018–21299] |
PDF | TEXT | DETAILS |
 |
28 September 2018
Notices |
Proposed Revisions to Standard Review Plan Section 2.5.3, Surface Deformation |
Pages 49139 – 49141 [FR DOC # 2018–21165] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Structural Analysis |
Pages 49138 – 49139 [FR DOC # 2018–21120] |
PDF | TEXT | DETAILS |
Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: |
Proposed Revisions to Standard Review Plan Section 2.4.6, Tsunami Hazards; Section 2.4.9, Channel Migration or Diversion; and Section 2.3.3, Onsite Meteorological Measurements Program |
Pages 49132 – 49138 [FR DOC # 2018–21140] |
PDF | TEXT | DETAILS |
Rules and Regulations |
State of Wyoming: Discontinuance of Certain Commission Regulatory Authority Within the State; Notice of Agreement Between the NRC and the State of Wyoming |
Pages 48905 – 48908 [FR DOC # 2018–21229] |
PDF | TEXT | DETAILS |
27 September 2018
Notices |
Meetings: |
In the Matter of Crow Butte Resources, Inc. (Marsland Expansion Area); Amended Notice of Hearing (Correcting Facsimile Transmission Number in Notice of Evidentiary Hearing and Opportunity To Provide Oral, Written, and Audio-Recorded Limited Appearance Statements) |
Pages 48874 – 48875 [FR DOC # 2018–21008] |
PDF | TEXT | DETAILS |
26 September 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Cooperation With States at Commercial Nuclear Power Plants and Other Nuclear Production and Utilization Facilities, Policy Statement |
Pages 48658 – 48659 [FR DOC # 2018–20934] |
PDF | TEXT | DETAILS |
Guidance: |
Monitoring the Effectiveness of Maintenance at Nuclear Power Plants |
Pages 48659 – 48660 [FR DOC # 2018–20864] |
PDF | TEXT | DETAILS |
License Applications; Amendments: |
NexEra Energy Duane Arnold, LLC: Duane Arnold Energy Center |
Pages 48657 – 48658 [FR DOC # 2018–20933] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Planning and Procedures |
Pages 48656 – 48656 [FR DOC # 2018–20852] |
PDF | TEXT | DETAILS |
Revised Meeting of the Advisory Committee on Reactor Safeguards (ACRS) |
Pages 48657 – 48657 [FR DOC # 2018–20927] |
PDF | TEXT | DETAILS |
25 September 2018
Notices |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 48463 – 48470 [FR DOC # 2018–20333] |
PDF | TEXT | DETAILS |
Sunshine Act Meetings |
Pages 48470 – 48471 [FR DOC # 2018–20888] |
PDF | TEXT | DETAILS |
Regulatory Guidance and Technical Basis on the Alternate Pressurized Thermal Shock Rule |
Pages 48471 – 48472 [FR DOC # 2018–20827] |
PDF | TEXT | DETAILS |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: NRC Form 361, Reactor Plant Event Notification Worksheet; NRC Form 361A, Fuel Cycle and Materials Event Notification Worksheet; NRC Form 361N, Non-Power Reactor Event Notification Worksheet |
Pages 48472 – 48473 [FR DOC # 2018–20792] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Cameco Resources; Smith Ranch-Highland Uranium Project |
Pages 48461 – 48463 [FR DOC # 2018–20793] |
PDF | TEXT | DETAILS |
Requests for Comments: |
Proposed Revisions to Standard Review Plan Section 14.3.3, Piping Systems and Components-Inspections, Tests, Analyses, and Acceptance Criteria |
Pages 48473 – 48474 [FR DOC # 2018–20826] |
PDF | TEXT | DETAILS |
24 September 2018
Rules and Regulations |
Inflation Adjustments to the Price-Anderson Act Financial Protection Regulations |
Pages 48202 – 48203 [FR DOC # 2018–20650] |
PDF | TEXT | DETAILS |
Notices |
Applications: |
Zion Nuclear Power Station, Units 1 and 2: Zion Solutions, LLC |
Pages 48343 – 48346 [FR DOC # 2018–20645] |
PDF | TEXT | DETAILS |
Guidance: |
Preparation of Environmental Reports for Nuclear Power Stations |
Pages 48346 – 48346 [FR DOC # 2018–20699] |
PDF | TEXT | DETAILS |
21 September 2018
|
No NRC notices published. |
20 September 2018
Notices |
Proposed Revisions to Branch Technical Position 5-3: Fracture Toughness Requirements |
Pages 47647 – 47648 [FR DOC # 2018–20451] |
PDF | TEXT | DETAILS |
Guidance: |
Protection Against Malevolent Use of Vehicles at Nuclear Power Plants |
Pages 47648 – 47648 [FR DOC # 2018–20476] |
PDF | TEXT | DETAILS |
License Renewals: |
Entergy Nuclear Operations, Inc.: Indian Point Nuclear Generating Unit Nos. 2 and 3 |
Pages 47650 – 47650 [FR DOC # 2018–20450] |
PDF | TEXT | DETAILS |
19 September 2018
Notices |
Sunshine Act Meetings |
Pages 47379 – 47379 [FR DOC # 2018–20439] |
PDF | TEXT | DETAILS |
License Amendments; Applications: |
Vogtle Electric Generating Plant, Units 3 and 4 |
Pages 47372 – 47375 [FR DOC # 2018–20322] |
PDF | TEXT | DETAILS |
Vogtle Electric Generating Plant, Units 3 and 4 |
Pages 47375 – 47379 [FR DOC # 2018–20324] |
PDF | TEXT | DETAILS |
18 September 2018
Notices |
Exemptions: |
Xcel Energy, Monticello Nuclear Generating Plant; Independent Spent Fuel Storage Installation |
Pages 47192 – 47203 [FR DOC # 2018–20283] |
PDF | TEXT | DETAILS |
License Amendment Application: |
Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Unit No. 1 |
Pages 47203 – 47207 [FR DOC # 2018–20211] |
PDF | TEXT | DETAILS |
17 September 2018
|
No NRC notices published. |
14 September 2018
Notices |
Environmental Assessments; Availability, etc.: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station |
Pages 46763 – 46766 [FR DOC # 2018–19976] |
PDF | TEXT | DETAILS |
13 September 2018
Notices |
Environmental Impact Statements; Availability, etc.: |
Interim Storage Partners LLC's Consolidated Interim Spent Fuel Storage Facility; Correction |
Pages 46525 – 46525 [FR DOC # 2018–19928] |
PDF | TEXT | DETAILS |
Guidance: |
Weld Residual Stress Finite Element Analysis Validation |
Pages 46524 – 46525 [FR DOC # 2018–19941] |
PDF | TEXT | DETAILS |
12 September 2018
Notices |
Disposition of Information Related to the Time Period That Safety-Related Structures, Systems, or Components Are Installed |
Pages 46199 – 46199 [FR DOC # 2018–19800] |
PDF | TEXT | DETAILS |
Information Collection: NRC Form 7, Application for NRC Export/Import License, Amendment, Renewal or Consent Request(s) |
Pages 46199 – 46200 [FR DOC # 2018–19859] |
PDF | TEXT | DETAILS |
Exemptions: |
FirstEnergy Nuclear Operating Company (FENOC) and FirstEnergy Nuclear Generation, LLC, Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit No. 1, Perry Nuclear Power Plant, Unit No. 1 |
Pages 46196 – 46198 [FR DOC # 2018–19848] |
PDF | TEXT | DETAILS |
Guidance: |
Guidance About Administrative Licensing Procedures |
Pages 46198 – 46199 [FR DOC # 2018–19755] |
PDF | TEXT | DETAILS |
11 September 2018
Notices |
Proposed Revisions to Standard Review Plan Section 13.6, Physical Security |
Pages 45992 – 45993 [FR DOC # 2018–19684 |
PDF | TEXT | DETAILS |
Proposed Revisions to Standard Review Plan Section 13.4, Operational Programs |
Pages 45995 – 45996 [FR DOC # 2018–19685] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 45981 – 45992 [FR DOC # 2018–19419] |
PDF | TEXT | DETAILS |
Guidance: |
Dispositioning of Technical Specifications That Are Insufficient To Ensure Plant Safety |
Pages 45980 – 45981 [FR DOC # 2018–19677] |
PDF | TEXT | DETAILS |
License Termination: |
Sacramento Municipal Utility District; Rancho Seco Nuclear Generating Station |
Pages 45994 – 45995 [FR DOC # 2018–19602] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards Subcommittee on Plant License Renewal |
Pages 45993 – 45994 [FR DOC # 2018–19601] |
PDF | TEXT | DETAILS |
10 September 2018
Notices |
Sunshine Act Meetings |
Pages 45694 – 45694 [FR DOC # 2018–19652] |
PDF | TEXT | DETAILS |
Information Collection: Nuclear Material Events Database (NMED) for the Collection of Event Report, Response, Analyses, and Follow-Up Data on Events Involving the Use of Atomic Energy Act (AEA) Radioactive Byproduct Material |
Pages 45695 – 45696 [FR DOC # 2018–19472 |
PDF | TEXT | DETAILS |
Environmental Impact Statements; Availability, etc.: |
Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3 |
Pages 45692 – 45694 [FR DOC # 2018–19462] |
PDF | TEXT | DETAILS |
Indirect Transfer of License: |
In the Matter of Dominion Energy, Inc., and SCANA Corporation Virgil C. Summer Nuclear Station (VCSNS), Units 1, 2, and 3, and the ISFSI |
Pages 45687 – 45688 [FR DOC # 2018–19578] |
PDF | TEXT | DETAILS |
Licenses; Amendment: |
Virgil C. Summer Nuclear Station, Unit No. 1 |
Pages 45688 &ndash 45692 [FR DOC # 2018–19583] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards Subcommittee on Plant License Renewal |
Pages 45694 – 45694 [FR DOC # 2018–19591] |
PDF | TEXT | DETAILS |
07 September 2018
Proposed Rules |
Draft Regulatory Issue Summary: |
Identifying and Reporting Human Performance Incidents |
Pages 45359 – 45359 [FR DOC # 2018–19369] |
PDF | TEXT | DETAILS |
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: NRC Form 664, General Licensee Registration |
Pages 45471 – 45472 [FR DOC # 2018–19417] |
PDF | TEXT | DETAILS |
06 September 2018
Notices |
Interim Storage Partner's Waste Control Specialists Consolidated Interim Storage Facility |
Pages 45288 – 45288 [FR DOC # 2018–18758] |
PDF | TEXT | DETAILS |
License Renewal Applications: |
Exelon Generation Company, LLC: Peach Bottom Atomic Power Station, Units 2 and 3 |
Pages 45285 – 45287 [FR DOC # 2018–19246] |
PDF | TEXT | DETAILS |
05 September 2018
Notices |
Sunshine Act Meetings |
Pages 45147 – 45148 [FR DOC # 2018–19368] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Planning and Procedures |
Pages 45147 – 45147 [FR DOC # 2018–19198] |
PDF | TEXT | DETAILS |
04 September 2018
Notices |
Environmental Assessments; Availability, etc.: |
FirstEnergy Nuclear Operating Company; FirstEnergy Nuclear Generation, LLC; Davis-Besse Nuclear Power Station, Unit No. 1 |
Pages 44914 – 44916 [FR DOC # 2018–19121] |
PDF | TEXT | DETAILS |
FirstEnergy Nuclear Operating Company; FirstEnergy Nuclear Generation, LLC; Beaver Valley Power Station, Units 1 and 2 |
Pages 44923 – 44925 [FR DOC # 2018–19120] |
PDF | TEXT | DETAILS |
FirstEnergy Nuclear Operating Company; FirstEnergy Nuclear Generation Company, LLC; Perry Nuclear Power Plant, Unit No. 1 |
Pages 44927 – 44929 [FR DOC # 2018–19122] |
PDF | TEXT | DETAILS |
Environmental Impact Statements; Availability, etc.: |
Interim Storage Partners LLC's Consolidated Interim Spent Fuel Storage Facility |
Pages 44922 – 44923 [FR DOC # 2018–19058] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 44916 – 44922 [FR DOC # 2018–18067] |
PDF | TEXT | DETAILS |
Protective Order Templates: |
Protective Order Templates for Hearings on Conformance With the Acceptance Criteria in Combined Licenses |
Pages 44925 – 44927 [FR DOC # 2018–19023] |
PDF | TEXT | DETAILS |
 |
31 August 2018
Notices |
Interim Storage Partner's Waste Control Specialists Consolidated Interim Storage Facility |
Pages 44680 – 44680 [FR DOC # 2018–18758] |
PDF | TEXT | DETAILS |
License Amendment; Applications: |
Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2 |
Pages 44677 – 44680 [FR DOC # 2018–18922] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards |
Pages 44675 – 44676 [FR DOC # 2018–18933] |
PDF | TEXT | DETAILS |
Petitions: |
First Energy Corp.; First Energy Solutions; FirstEnergy Nuclear Generation; FirstEnergy Nuclear Operating Company |
Pages 44676 – 44677 [FR DOC # 2018–18923] |
PDF | TEXT | DETAILS |
30 August 2018
Proposed Rules |
Use of Electronic Signatures by Medical Licensees on Internal Documents |
Pages 44247 – 44247 [FR DOC # 2018–18816] |
PDF | TEXT | DETAILS |
Notices |
Combined Licenses: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; ITAAC for Pneumatic Testing of VES Air Lines |
Pages 44308 – 44309 [FR DOC # 2018–18846] |
PDF | TEXT | DETAILS |
29 August 2018
Notices |
Environmental Assessments; Availability, etc.: |
Target Fabrication Portion of the Northwest Medical Isotopes Radioisotope Production Facility |
Pages 44068 – 44070 [FR DOC # 2018–18757] |
PDF | TEXT | DETAILS |
License Applications: |
Interim Storage Partner's Waste Control Specialists Consolidated Interim Storage Facility |
Pages 44070 – 44075 [FR DOC # 2018–18758] |
PDF | TEXT | DETAILS |
28 August 2018
Notices |
Sunshine Act Meetings |
Pages 43900 – 43901 [FR DOC # 2018–18660] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined; Licenses Involving No Significant Hazards Considerations |
Pages 43901 – 43911 [FR DOC # 2018–18028] |
PDF | TEXT | DETAILS |
27 August 2018
|
No NRC notices published. |
24 August 2018
Notices |
Tribal Protocol Manual |
Pages 42944 – 42945 [FR DOC # 2018–18277] |
PDF | TEXT | DETAILS |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: NRC Form 244, "Registration Certificate-Use of Depleted Uranium Under General License" |
Pages 42946 – 42947 [FR DOC # 2018–18387] |
PDF | TEXT | DETAILS |
License Amendment Application; Withdrawal |
Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 2 |
Pages 42945 – 42946 [FR DOC # 2018–18352] |
PDF | TEXT | DETAILS |
23 August 2018
Proposed Rules |
Guidance: |
Cyber Security Programs for Nuclear Power Reactors |
Pages 42623 – 42624 [FR DOC # 2018–18231] |
PDF | TEXT | DETAILS |
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Requests to Agreement States for Information |
Pages 42712 – 42713 [FR DOC # 2018–18146] |
PDF | TEXT | DETAILS |
Information Collection: Requests to Non-Agreement States for Information |
Pages 42714 – 42715 [FR DOC # 2018–18145] |
PDF | TEXT | DETAILS |
Environmental Impact Statements; Availability, etc.: |
Entergy Operations, Inc; Waterford Steam Electric Station, Unit 3 |
Pages 42713 – 42714 [FR DOC # 2018–18173] |
PDF | TEXT | DETAILS |
22 August 2018
Notices |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on NuScale |
Pages 42530 – 42531 [FR DOC # 2018–18066] |
PDF | TEXT | DETAILS |
Special Nuclear Materials Licenses: |
Sacramento Municipal Utility District; Rancho Seco Independent Spent Fuel Storage Installation; Renewal of Special Nuclear Materials License |
Pages 42527 – 42530 [FR DOC # 2018–18068] |
PDF | TEXT | DETAILS |
21 August 2018
Notices |
Exemptions: |
Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station |
Pages 42320 – 42322 [FR DOC # 2018–17988] |
PDF | TEXT | DETAILS |
Guidance: |
Interim Staff Guidance for Decommissioning Funding Plans for Materials Licensees; Extension of Comment Period |
Pages 42319 – 42320 [FR DOC # 2018–17983] |
PDF | TEXT | DETAILS |
20 August 2018
|
No NRC notices published. |
17 August 2018
Notices |
Sunshine Act Meetings |
Pages 41113 – 41113 [FR DOC # 2018–17879] |
PDF | TEXT | DETAILS |
16 August 2018
Proposed Rules |
Approval of American Society of Mechanical Engineers' Code Cases |
Pages 40685 – 40703 [FR DOC # 2018–17650] |
PDF | TEXT | DETAILS |
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants |
Pages 40793 – 40794 [FR DOC # 2018–17613 |
PDF | TEXT | DETAILS |
15 August 2018
Notices |
License Amendment Applications: |
National Aeronautics & Space Administration; John H. Glenn Research Center |
Pages 40576 – 40577 [FR DOC # 2018–17486] |
PDF | TEXT | DETAILS |
14 August 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: NRC Form 171, "Duplication Request" |
Pages 40341 – 40342 [FR DOC # 2018–17455] |
PDF | TEXT | DETAILS |
Information Collection: General Domestic Licenses for Byproduct Material |
Pages 40356 – 40357 [FR DOC # 2018–17457 |
PDF | TEXT | DETAILS |
Information Collection: Physical Protection of Plants and Materials |
Pages 40358 – 40359 [FR DOC # 2018–17459] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 40342 – 40355 [FR DOC # 2018–17132] |
PDF | TEXT | DETAILS |
Charter Establishments: |
Establishment of Atomic Safety and Licensing Board; Florida Power & Light Company |
Pages 40360 – 40360 [FR DOC # 2018–17373] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Uranium One; Ludeman Satellite |
Pages 40357 – 40358 [FR DOC # 2018–17458] |
PDF | TEXT | DETAILS |
License Termination: |
Termination of Operating License for the Buffalo Materials Research Center Reactor |
Pages 40355 – 40356 [FR DOC # 2018–17456] |
PDF | TEXT | DETAILS |
13 August 2018
Notices |
Sunshine Act Meetings |
Pages 40090 – 40090 [FR DOC # 2018–17414] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station |
Pages 40092 – 40095 [FR DOC # 2018–17327] |
PDF | TEXT | DETAILS |
Guidance: |
Physical Security—Combined License and Operating Reactors |
Pages 40090 – 40091 [FR DOC # 2018–17328] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on NuScale |
Pages 40091 – 40091 [FR DOC # 2018–17329] |
PDF | TEXT | DETAILS |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Future Plant Designs |
Pages 40091 – 40092 [FR DOC # 2018–17233] |
PDF | TEXT | DETAILS |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee; on NuScale |
Pages 40092 – 40092 [FR DOC # 2018–17232] |
PDF | TEXT | DETAILS |
10 August 2018
Notices |
Director's Decision: |
Entergy Operations, Inc.; FirstEnergy Nuclear Operating Company; Vistra Operations Company, LLC; Duke Entergy Florida, Southern Nuclear Operating Company, Inc.; Dominion Nuclear Connecticut, Inc.; Virginia Electric and Power Company; Northern States Power Company-Minnesota; South Carolina Electric & Gas Company, Inc.; STP Nuclear Operating Company; Tennessee Valley Authority |
Pages 39790 – 39797 [FR DOC # 2018–17131] |
PDF | TEXT | DETAILS |
License Transfers: |
In the Matter of Entergy Arkansas, Inc. and Entergy Operations, Inc. Arkansas Nuclear One, Units 1 and 2, and Independent Spent Fuel Storage Installation Facility |
Pages 39789 – 39790 [FR DOC # 2018–17168] |
PDF | TEXT | DETAILS |
In the Matter of Entergy Louisiana, LLC and Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3, and Independent Spent Fuel Storage Installation Facility |
Pages 39797 – 39798 [FR DOC # 2018–17166] |
PDF | TEXT | DETAILS |
In the Matter of Entergy Louisiana, LLC and Entergy Operations, Inc., River Bend Station, Unit 1, and Independent Spent Fuel Storage Installation Facility |
Pages 39798 – 39799 [FR DOC # 2018–17167] |
PDF | TEXT | DETAILS |
Meetings: |
Notice of Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Plant Operations and Fire Protection |
Pages 39788 – 39788 [FR DOC # 2018–17120] |
PDF | TEXT | DETAILS |
Notice of Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Regulatory Policies & Practices |
Pages 39800 – 39800 [FR DOC # 2018–17119] |
PDF | TEXT | DETAILS |
09 August 2018
Notices |
Dry Storage and Transportation of High Burnup Spent Nuclear Fuel |
Pages 39475 – 39476 [FR DOC # 2018–16994] |
PDF | TEXT | DETAILS |
Exemptions and Combined License Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4 Ventilation System Changes |
Pages 39472 – 39474 [FR DOC # 2018–16996] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Tier 1 and Tier 2* Editorial and Consistency Changes |
Pages 39474 – 39475 [FR DOC # 2018–16995] |
PDF | TEXT | DETAILS |
License Amendment Applications: |
Homestake Mining Company of California; Grants Reclamation Project; Zeolite Water Treatment Systems |
Pages 39470 – 39472 [FR DOC # 2018–17037] |
PDF | TEXT | DETAILS |
Homestake Mining Company of California; Grants Reclamation Project; Groundwater Monitoring Plan |
Pages 39476 – 39479 [FR DOC # 2018–17039] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS); Subcommittee on Thermal-Hydraulic Phenomena |
Pages 39469 – 39470 [FR DOC # 2018–17009] |
PDF | TEXT | DETAILS |
08 August 2018
|
No NRC notices published. |
07 August 2018
Notices |
Sunshine Act Meeting Notice |
Pages 38727 – 38728 [FR DOC # 2018–16894] |
PDF | TEXT | DETAILS |
Digital Instrumentation and Controls-Interim Staff Guidance-06, "Licensing Process" |
Pages 38731 – 38732 [FR DOC # 2018–16810] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 38732 – 38738 [FR DOC # 2018–14915] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4, Ventilation System Changes |
Pages 38728 – 38729 [FR DOC # 2018–16831] |
PDF | TEXT | DETAILS |
Guidance: |
Radiation Safety Surveys at Medical Institutions |
Pages 38729 – 38730 [FR DOC # 2018–16830] |
PDF | TEXT | DETAILS |
Standard Format and Content of Physical Security Plans, Training and Qualifications Plans and Safeguards Contingency Plans for Nuclear Power Plants |
Pages 38730 – 38731 [FR DOC # 2018–16829] |
PDF | TEXT | DETAILS |
06 August 2018
|
No NRC notices published. |
03 August 2018
Notices |
Guidance: |
Program-Specific Guidance About Licenses Authorizing Distribution to General Licensees and Program-Specific Guidance About Special Nuclear Material of Less Than Critical Mass Licenses |
Pages 38184 – 38184 [FR DOC # 2018–16619] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards; Revised Notice of Meeting |
Pages 38184 – 38185 [FR DOC # 2018–16621] |
PDF | TEXT | DETAILS |
02 August 2018
Notices |
Hearings: |
Notice of Hearing (Notice of Evidentiary Hearing and Opportunity To Provide Oral, Written, and Audio-Recorded Limited Appearance Statements); In the Matter of Crow Butte Resources, Inc. (Marsland Expansion Area) |
Pages 37828 – 37830 [FR DOC # 2018–16546] |
PDF | TEXT | DETAILS |
Weapons at Atomic Safety and Licensing Board Proceeding: |
Notice (Regarding Weapons at Atomic Safety and Licensing Board Proceeding); In the Matter of Crow Butte Resources, Inc. (Marsland Expansion Area) |
Pages 37828 – 37828 [FR DOC # 2018–16545] |
PDF | TEXT | DETAILS |
01 August 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Standards for Protection Against Radiation |
Pages 37527 – 37528 [FR DOC # 2018–16390] |
PDF | TEXT | DETAILS |
Information Collection: Request for Taxpayer Identification Number |
Pages 37528 – 37529 [FR DOC # 2018–16401] |
PDF | TEXT | DETAILS |
Information Collection: NRC Form 748, National Source Tracking Transaction Report |
Pages 37535 – 37536 [FR DOC # 2018–16391] |
PDF | TEXT | DETAILS |
Information Collection: Domestic Licensing of Source Material |
Pages 37537 – 37538 [FR DOC # 2018–16428] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
American Centrifuge Operating, LCC; Lead Cascade Facility |
Pages 37530 – 37532 [FR DOC # 2018–16404] |
PDF | TEXT | DETAILS |
Exemptions: |
LaCrosse Solutions, LLC; Dairyland Power Cooperative La Crosse Boiling Water Reactor |
Pages 37532 – 37535 [FR DOC # 2018–16393] |
PDF | TEXT | DETAILS |
Interim Staff Guidance: |
Interim Staff Guidance for Decommissioning Funding Plans for Materials Licensees |
Pages 37529 – 37530 [FR DOC # 2018–16392] |
PDF | TEXT | DETAILS |
License Renewals; Applications: |
Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Units 2 and 3 |
Pages 37529 – 37529 [FR DOC # 2018–16402] |
PDF | TEXT | DETAILS |
 |
31 July 2018
Notices |
Facility Operating and Combined Licenses: |
Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 36971 – 36980 [FR DOC # 2018–15682] |
PDF | TEXT | DETAILS |
30 July 2018
Notices |
Sunshine Act Meeting Notice |
Pages 36633 – 36634 [FR DOC # 2018–16278] |
PDF | TEXT | DETAILS |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: 10 CFR Part 95, Facility Security Clearance and Safeguarding of National Security Information and Restricted Data |
Pages 36633 - 36633 [FR DOC # 2018–16125] |
PDF | TEXT | DETAILS |
License Applications; Renewals: |
Water Remediation Technology, LLC |
Pages 36630 – 36633 [FR DOC # 2018–16188] |
PDF | TEXT | DETAILS |
Program-Specific Guidance: |
Program-Specific Guidance About Self-Shielded Irradiator Licenses and Program-Specific Guidance About Exempt Distribution Licenses |
Pages 36629 – 36630 [FR DOC # 2018–16239] |
PDF | TEXT | DETAILS |
27 July 2018
|
No NRC notices published. |
26 July 2018
|
No NRC notices published. |
25 July 2018
Notices |
Meetings: |
Advisory Committee on the Medical Uses of Isotopes: Meeting Notice |
Pages 35287 – 35287 [FR DOC # 2018–15884] |
PDF | TEXT | DETAILS |
24 July 2018
Notices |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Consistency and Clarification Changes to Annex Building, Auxiliary Building, and Basemat ITAAC |
Pages 35029 – 35031 [FR DOC # 2018–15783] |
PDF | TEXT | DETAILS |
23 July 2018
Notices |
Inspections, Tests, Analyses, and Acceptance Criteria: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria |
Pages 34890 – 34891 [FR DOC # 2018–15683] |
PDF | TEXT | DETAILS |
20 July 2018
Notices |
Sunshine Act Meeting Notice |
Pages 34618 – 34619 [FR DOC # 2018–15742] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant Operations and Fire Protection; Notice of Meeting |
Pages 34618 – 34618 [FR DOC # 2018–15539] |
PDF | TEXT | DETAILS |
19 July 2018
|
No NRC notices published. |
18 July 2018
Notices |
Environmental Assessments; Availability, etc.: |
Exelon Generation Company, LLC; Limerick Generating Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 1, 2, and 3 |
Pages 33961 – 33963 [FR DOC # 2018–15282] |
PDF | TEXT | DETAILS |
Termination of Licenses: |
Nuclear Innovation North America, LLC; South Texas Project, Units 3 and 4 |
Pages 33963 – 33964 [FR DOC # 2018–15302] |
PDF | TEXT | DETAILS |
17 July 2018
Notices |
Sunshine Act Meeting Notice |
Pages 33257 – 33257 [FR DOC # 2018–15286] |
PDF | TEXT | DETAILS |
Facility Operating Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 33263 – 33276 [FR DOC # 2018–14779] |
PDF | TEXT | DETAILS |
Staff Assessments of Proposed Agreements: |
State of Wyoming: NRC Staff Assessment of a Proposed Agreement Between the Nuclear Regulatory Commission and the State of Wyoming |
Pages 33257 – 33263 [FR DOC # 2018–14176] |
PDF | TEXT | DETAILS |
16 July 2018
Rules and Regulations |
Medical Use of Byproduct Material: |
Medical Use of Byproduct Material-Medical Event; Definitions and Training and Experience |
Pages 32759 – 32759 [FR DOC # 2018–14853] |
PDF | TEXT | DETAILS |
Medical Use of Byproduct Material-Medical Event Definitions, Training and Experience, and Clarifying Amendments |
Pages 33046 – 33112 [FR DOC # 2018–14852] |
PDF | TEXT | DETAILS |
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Criteria and Procedures for Emergency Access to Non-Federal and Regional Low-Level Waste Disposal Facilities |
Pages 32915 – 32916 [FR DOC # 2018–15081] |
PDF | TEXT | DETAILS |
Information Collection: 10 CFR Part 140, Financial Protection Requirements and Indemnity Agreements |
Pages 32918 – 32919 [FR DOC # 2018–15080] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Energy Northwest; Columbia Generating Station |
Pages 32916 – 32918 [FR DOC # 2018–15091] |
PDF | TEXT | DETAILS |
License Amendments: |
Watts Bar Nuclear Plant, Unit 1 |
Pages 32912 – 32915 [FR DOC # 2018–15100] |
PDF | TEXT | DETAILS |
License Applications: |
Holtec International's HI-STORE Consolidated Interim Storage Facility for Interim Storage of Spent Nuclear Fuel |
Pages 32919 – 32925 [FR DOC # 2018–15079] |
PDF | TEXT | DETAILS |
13 July 2018
Notices |
Proposed Revisions to Branch Technical Position 5-3; Fracture Toughness Requirements |
Pages 32690 – 32691 [FR DOC # 2018–15035] |
PDF | TEXT | DETAILS |
License Amendment Applications: |
Exelon Generation Company, LLC; James A. FitzPatrick Nuclear Power Plant |
Pages 32691 – 32696 [FR DOC # 2018–15009] |
PDF | TEXT | DETAILS |
License Renewals: |
Kennecott Uranium Company; Sweetwater Uranium Project |
Pages 32696 – 32697 [FR DOC # 2018–14855] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Plant Operations and Fire Protection; Notice of Meeting |
Pages 32697 – 32698 [FR DOC # 2018–15003] |
PDF | TEXT | DETAILS |
12 July 2018
|
No NRC notices published. |
11 July 2018
Notices |
Exemptions and Combined License Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to the Building Gap Between the Nuclear Island and Adjacent Buildings |
Pages 32156 – 32157 [FR DOC # 2018–14746] |
PDF | TEXT | DETAILS |
10 July 2018
Notices |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 31979 – 31979 [FR DOC # 2018–12919] |
PDF | TEXT | DETAILS |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 31981 – 31981 [FR DOC # 2018–13758] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4, Class 1E Motor-Operated Valve Terminal Voltage Testing |
Pages 31980 – 31981 [FR DOC # 2018–14698] |
PDF | TEXT | DETAILS |
Guidance: |
Program-Specific Guidance About Possession Licenses for Manufacturing and Distribution, Program-Specific Guidance About Well Logging, Tracer, and Field Flood Study Licenses, and Program-Specific Guidance About Possession Licenses for Production of Radioactive Material Using an Accelerator |
Pages 31979 – 31980 [FR DOC # 2018–14696] |
PDF | TEXT | DETAILS |
Proposed State Agreements |
State of Wyoming: NRC Staff Assessment of a Proposed Agreement Between the Nuclear Regulatory Commission and the State of Wyoming |
Pages 31981 – 31987 [FR DOC # 2018–14175] |
PDF | TEXT | DETAILS |
09 July 2018
|
No NRC notices published. |
06 July 2018
Notices |
Sunshine Act Meeting Notice |
Pages 31574 – 31574 [FR DOC # 2018–14635] |
PDF | TEXT | DETAILS |
License Transfers: |
Order Approving Indirect Transfer of Control of License: Westinghouse Electric Company, LLC |
Pages 31572 – 31574 [FR DOC # 2018–14489] |
PDF | TEXT | DETAILS |
05 July 2018
Notices |
Exemptions: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station |
Pages 31425 – 31429 [FR DOC # 2018–14391] |
PDF | TEXT | DETAILS |
Guidance: |
Dispositioning of Technical Specifications That Are Insufficient To Ensure Plant Safety |
Pages 31429 – 31430 [FR DOC # 2018–14379] |
PDF | TEXT | DETAILS |
03 July 2018
Notices |
Sunshine Act Meeting Notice |
Pages 31197 – 31198 [FR DOC # 2018–14471] |
PDF | TEXT | DETAILS |
Facility Operating Licenses and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 31180 – 31190 [FR DOC # 2018–13758] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 31190 – 31197 [FR DOC # 2018–12919] |
PDF | TEXT | DETAILS |
State Agreements: |
State of Wyoming: NRC Staff Assessment of a Proposed Agreement Between the Nuclear Regulatory Commission and the State of Wyoming |
Pages 31174 – 31180 [FR DOC # 2018–14174] |
PDF | TEXT | DETAILS |
02 July 2018
Notices |
Draft Letter to the Nuclear Energy Institute Regarding the Clarification of Regulatory Paths for Lead Test Assemblies |
Pages 30989 – 30990 [FR DOC # 2018–14121] |
PDF | TEXT | DETAILS |
License Amendments; Applications: |
Nebraska Public Power District; Cooper Nuclear Station |
Pages 30984 – 30989 [FR DOC # 2018–14201] |
PDF | TEXT | DETAILS |
Meetings: |
Revised Notice of Meeting: Advisory Committee on Reactor Safeguards |
Pages 30990 – 30991 [FR DOC # 2018–14202] |
PDF | TEXT | DETAILS |
 |
29 June 2018
Notices |
Environmental Assessments; Availability, etc.: |
Zion Solutions, LLC; Zion Nuclear Power Station, Units 1 and 2 |
Pages 30783 – 30785 [FR DOC # 2018–14004] |
PDF | TEXT | DETAILS |
28 June 2018
Rules and Regulations |
Miscellaneous Corrections |
Pages 30285 – 30289 [FR DOC # 2018–13877] |
PDF | TEXT | DETAILS |
Notices |
Monitoring the Effectiveness of Maintenance at Nuclear Power Plants |
Pages 30469 – 30470 [FR DOC # 2018–13876] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Technical Specifications for Reactor Coolant System Vacuum Fill and Inspections, Tests, Analyses, and Acceptance Criteria for Containment Floodup |
Pages 30462 – 30464 [FR DOC # 2018–13892] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to Containment Cooling and Spent Fuel Pool Makeup Strategies |
Pages 30464 – 30465 [FR DOC # 2018–13860] |
PDF | TEXT | DETAILS |
License Amendments; Applications: |
Tennessee Valley Authority, Browns Ferry Nuclear Plant, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation; Sequoyah Nuclear Plant, Units 1 and 2, and Independent Spent Fuel Storage Installation; Watts Bar Nuclear Plant, Units 1 and 2, and Independent Spent Fuel Storage Installation |
Pages 30465 – 30469 [FR DOC # 2018–13874] |
PDF | TEXT | DETAILS |
27 June 2018
Notices |
License Amendment Applications: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Changes to Construction Fitness-for-Duty Commitments |
Pages 30199 – 30202 [FR DOC # 2018–13757] |
PDF | TEXT | DETAILS |
Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Unit Nos. 3 and 4 |
Pages 30195 – 30199 [FR DOC # 2018–13736] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting |
Pages 30195 – 30195 [FR DOC # 2018–13778] |
PDF | TEXT | DETAILS |
26 June 2018
Notices |
Sunshine Act Meeting Notice |
Pages 29835 – 29835 [FR DOC # 2018–13865] |
PDF | TEXT | DETAILS |
License Amendment; Applications: |
Duane Arnold Energy Center |
Pages 29834 – 29835 [FR DOC # 2018–13606] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards; Notice of Meeting |
Pages 29827 – 29828 [FR DOC # 2018–13624] |
PDF | TEXT | DETAILS |
Proposed State Agreements |
State of Wyoming: NRC Staff Assessment of a Proposed Agreement Between the Nuclear Regulatory Commission and the State of Wyoming |
Pages 29828 – 29834 [FR DOC # 2018–13626] |
PDF | TEXT | DETAILS |
25 June 2018
Rules and Regulations |
Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems |
Pages 29437 – 29438 [FR DOC # 2018–13570] |
PDF | TEXT | DETAILS |
Fee Schedules: |
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2018 |
Pages 29622 – 29657 [FR DOC # 2018–13320] |
PDF | TEXT | DETAILS |
Notices |
Guidance: |
Report to Congress on Abnormal Occurrences; Fiscal Year 2017 Dissemination of Information |
Pages 29579 – 29580 [FR DOC # 2018–13509] |
PDF | TEXT | DETAILS |
License Renewals: |
Pennsylvania State University |
Pages 29580 – 29581 [FR DOC # 2018–13547] |
PDF | TEXT | DETAILS |
22 June 2018
Notices |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 29144 – 29144 [FR DOC # 2018–12506] |
PDF | TEXT | DETAILS |
Atomic Safety and Licensing Board Reconstitution: |
Crow Butte Resources, Inc. (North Trend Expansion Project); Notice of Atomic Safety and Licensing Board Reconstitution |
Pages 29144 – 29144 [FR DOC # 2018–13387] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Improvements to Main Control Room Post-Accident Radiological Consequences |
Pages 29144 – 29145 [FR DOC # 2018–13404] |
PDF | TEXT | DETAILS |
21 June 2018
|
No NRC notices published. |
20 June 2018
|
No NRC notices published. |
19 June 2018
Notices |
Environmental Assessments; Availability, etc.: |
Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Byron Station, Units 1 and 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 1, 2, and 3; LaSalle County Station, Units 1 and 2; and Quad Cities Nuclear Power Station, Units 1 and 2 |
Pages 28468 – 28470 [FR DOC # 2018–13089] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 28456 – 28467 [FR DOC # 2018–12506] |
PDF | TEXT | DETAILS |
18 June 2018
Notices |
Sunshine Act Meeting Notice |
Pages 28269 – 28269 [FR DOC # 2018–13086] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Future Plant Designs; Notice of Meeting |
Pages 28268 – 28269 [FR DOC # 2018–12937] |
PDF | TEXT | DETAILS |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on Digital I&C Systems |
Pages 28269 – 28270 [FR DOC # 2018–13051] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on APR1400; Notice of Meeting |
Pages 28270 – 28270 [FR DOC # 2018–12936] |
PDF | TEXT | DETAILS |
15 June 2018
Notices |
Environmental Assessments; Availability, etc.: |
Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility |
Pages 28014 – 28015 [FR DOC # 2018–12841] |
PDF | TEXT | DETAILS |
14 June 2018
|
No NRC notices published. |
13 June 2018
Notices |
Exemptions: |
Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Units 1 and 2; Suspension of Security Measures in an Emergency or During Severe Weather |
Pages 27634 – 27638 [FR DOC # 2018–12652] |
PDF | TEXT | DETAILS |
12 June 2018
Notices |
Sunshine Act Meeting Notice |
Pages 27355 – 27355 [FR DOC # 2018–12654] |
PDF | TEXT | DETAILS |
11 June 2018
Proposed Rules |
Regulatory Agenda: |
Unified Agenda of Federal Regulatory and Deregulatory Actions |
Pages 27275 – 27278 [FR DOC # 2018–11244] |
PDF | TEXT | DETAILS |
Notices |
Meetings: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station; Post-Shutdown Decommissioning Activities Report |
Pages 27033 – 27034 [FR DOC # 2018–12429] |
PDF | TEXT | DETAILS |
08 June 2018
Proposed Rules |
Clarification of Export Reporting Requirements for Nuclear Facilities, Equipment, and Non-Nuclear Materials |
Pages 26611 – 26612 [FR DOC # 2018–12351] |
PDF | TEXT | DETAILS |
Notices |
Environmental Assessments; Availability, etc.: |
Kennecott Uranium Corporation; Sweetwater Uranium Project |
Pages 26708 – 26709 [FR DOC # 2018–12350] |
PDF | TEXT | DETAILS |
License Amendments; Applications: |
Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2 |
Pages 26709 – 26713 [FR DOC # 2018–12327] |
PDF | TEXT | DETAILS |
07 June 2018
Notices |
Draft Letter to the Nuclear Energy Institute Regarding the Clarification of Regulatory Paths for Lead Test Assemblies |
Pages 26503 – 26505 [FR DOC # 2018–12276] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Pacific Gas and Electric Company Diablo Canyon Independent Spent Fuel Storage Installation |
Pages 26501 – 26503 [FR DOC # 2018–12249] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on the Medical Uses of Isotopes: Meeting Notice |
Pages 26503 – 26503 [FR DOC # 2018–12269] |
PDF | TEXT | DETAILS |
06 June 2018
Notices |
Environmental Impact Statements; Availability, etc.: |
Entergy Operations, Inc.; River Bend Station, Unit 1 |
Pages 26310 – 26311 [FR DOC # 2018–12122] |
PDF | TEXT | DETAILS |
05 June 2018
Notices |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 26098 – 26109 [FR DOC # 2018–11843] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 26112 – 26119 [FR DOC # 2018–10982] |
PDF | TEXT | DETAILS |
Guidance: |
Guidelines for Evaluating the Effects of Light-Water Reactor Water Environments in Fatigue Analyses of Metal Components |
Pages 26110 – 26111 [FR DOC # 2018–11995] |
PDF | TEXT | DETAILS |
Effect of LWR Water Environments on the Fatigue Life of Reactor Materials |
Pages 26111 – 26112 [FR DOC # 2018–11996] |
PDF | TEXT | DETAILS |
Meetings: |
Meeting of the Advisory Committee on Reactor Safeguards (ACRS) Subcommittee on APR1400 |
Pages 26109 – 26109 [FR DOC # 2018–12022] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Nuscale; Notice of Meeting |
Pages 26109 – 26110 [FR DOC # 2018–12024] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting |
Pages 26112 – 26112 [FR DOC # 2018–12023] |
PDF | TEXT | DETAILS |
04 June 2018
Notices |
Sunshine Act Meeting Notice |
Pages 25722 – 25723 [FR DOC # 2018–12083] |
PDF | TEXT | DETAILS |
License Amendments: |
Duke Energy Progress, Inc., H.B. Robinson Steam Electric Plant, Unit No. 2, Independent Spent Fuel Storage Installation |
Pages 25721 – 25722 [FR DOC # 2018–11882] |
PDF | TEXT | DETAILS |
01 June 2018
|
No NRC notices published. |
 |
31 May 2018
|
No NRC notices published. |
30 May 2018
Notices |
Environmental Impact Statements; Availability, etc.: |
Early Site Permit Application; Tennessee Valley Authority; Clinch River Nuclear Site; Correction |
Pages 24832 – 24832 [FR DOC # 2018–11550] |
PDF | TEXT | DETAILS |
29 May 2018
Notices |
Draft Regulatory Guides: |
Standard Format and Content of Physical Security Plans, Training and Qualifications Plans, and Safeguards Contingency Plans for Nuclear Power Plants |
Pages 24510 – 24511 [FR DOC # 2018–11460] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4 Main Control Room Emergency Habitability System Changes |
Pages 24511 – 24513 [FR DOC # 2018–11459] |
PDF | TEXT | DETAILS |
Guidance: |
Instructions for Recording and Reporting Occupational Radiation Dose Data |
Pages 24513 – 24514 [FR DOC # 2018–11374] |
PDF | TEXT | DETAILS |
License Amendment; Applications: |
FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant, Unit No. 1 |
Pages 24514 – 24514 [FR DOC # 2018–11375] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards; Notice of Meeting |
Pages 24514 – 24515 [FR DOC # 2018–11413] |
PDF | TEXT | DETAILS |
25 May 2018
Notices |
Sunshine Act Meetings |
Pages 24361 – 24361 [FR DOC # 2018–01361] |
PDF | TEXT | DETAILS |
24 May 2018
|
No NRC notices published. |
23 May 2018
|
No NRC notices published. |
22 May 2018
Notices |
U.S. Army Installation Command |
Pages 23742 – 23748 [FR DOC # 2018–10840] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Florida Power & Light Company: Turkey Point Nuclear Plant Units 3 and 4 |
Pages 23726 – 23728 [FR DOC # 2018–10806] |
PDF | TEXT | DETAILS |
Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3 |
Pages 23748 – 23749 [FR DOC # 2018–10831] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 23728 – 23742 [FR DOC # 2018–10565] |
PDF | TEXT | DETAILS |
21 May 2018
|
No NRC notices published. |
18 May 2018
Notices |
Sunshine Act Meetings |
Pages 23302 – 23302 [FR DOC # 2018–10769] |
PDF | TEXT | DETAILS |
17 May 2018
|
No NRC notices published. |
16 May 2018
Notices |
Environmental Impact Statements; Availability, etc.: |
Holtec International HI-STORE Consolidated Interim Storage Facility Project |
Pages 22714 – 22715 [FR DOC # 2018–10418] |
PDF | TEXT | DETAILS |
15 May 2018
Proposed Rules |
Cyber Security for Byproduct Materials Licensees |
Pages 22413 – 22414 [FR DOC # 2018–10358] |
PDF | TEXT | DETAILS |
Notices |
Revision of the NRC Enforcement Policy |
Pages 22535 – 22536 [FR DOC # 2018–10350] |
PDF | TEXT | DETAILS |
Construction Permits: |
Northwest Medical Isotopes, LLC; Medical Radioisotope Production Facility |
Pages 22532 – 22534 [FR DOC # 2018–10273] |
PDF | TEXT | DETAILS |
Export License Amendment and Renewal Application: |
Diversified Scientific Services, Inc. |
Pages 22534 – 22535 [FR DOC # 2018–10247] |
PDF | TEXT | DETAILS |
14 May 2018
Notices |
Sunshine Act Meeting Notice |
Pages 22294 – 22294 [FR DOC # 2018–10271] |
PDF | TEXT | DETAILS |
Draft Regulatory Guides: |
Standard Format and Content of Physical Security Plans, Training and Qualifications Plans and Safeguards Contingency Plans for Nuclear Power Plants |
Pages 22297 – 22299 [FR DOC # 2018–10156 |
PDF | TEXT | DETAILS |
License Transfers; Applications: |
Westinghouse Electric Company LLC; Consideration of Approval of Transfer of License |
Pages 22294 – 22297 [FR DOC # 2018–10177] |
PDF | TEXT | DETAILS |
11 May 2018
Notices |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS): Meeting of the ACRS Subcommittee on Power Uprates; Notice of Meeting |
Pages 22105 – 22105 [FR DOC # 2018–09996] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Digital I&C Systems; Notice of Meeting |
Pages 22106 – 22106 [FR DOC # 2018–10018] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Nuscale; Notice of Meeting |
Pages 22106 – 22106 [FR DOC # 2018–22106] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Thermal-Hydraulics Phenomena; Notice of Meeting |
Pages 22106 – 22107 [FR DOC # 2018–09999] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Regulatory Policies & Practices; Notice of Meeting |
Pages 22107 – 22107 [FR DOC # 2018–09998] |
PDF | TEXT | DETAILS |
10 May 2018
|
No NRC notices published. |
09 May 2018
Notices |
Exemptions: |
Northern States Power Company: Monticello Nuclear Generating Plant |
Pages 21310 – 21316 [FR DOC # 2018–09801] |
PDF | TEXT | DETAILS |
08 May 2018
Notices |
Relocation of Regulatory Issue Summary Notices in the Federal Register |
Pages 20858 – 20858 [FR DOC # 2018–09687] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 20858 – 20866 [FR DOC # 2018–09244] |
PDF | TEXT | DETAILS |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 20866 – 20872 [FR DOC # 2018–07705] |
PDF | TEXT | DETAILS |
07 May 2018
Notices |
Sunshine Act Meeting Notice |
Pages 20101 – 20102 [FR DOC # 2018–09826] |
PDF | TEXT | DETAILS |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: 10 CFR Part 95, Facility Security Clearance and Safeguarding of National Security Information and Restricted Data |
Pages 20102 – 20103 [FR DOC # 2018–09555] |
PDF | TEXT | DETAILS |
Guidance: |
Acceptance Sampling Procedures for Exempted and Generally Licensed Items Containing Byproduct Material |
Pages 20103 – 20103 [FR DOC # 2018–09591] |
PDF | TEXT | DETAILS |
04 May 2018
Rules and Regulations |
Modified Small Quantities Protocol |
Pages 19603 – 19614 [FR DOC # 2018–09462] |
PDF | TEXT | DETAILS |
Notices |
Sunshine Act Meeting Notice |
Pages 19842 – 19842 [FR DOC # 2018–09682] |
PDF | TEXT | DETAILS |
03 May 2018
Proposed Rules |
Review of Administrative Rules |
Pages 19464 – 19466 [FR DOC # 2018–09359] |
PDF | TEXT | DETAILS |
Notices |
Environmental Assessments; Availability, etc.: |
Crow Butte Resources, Inc.; Marsland Expansion Area |
Pages 19576 – 19577 [FR DOC # 2018–09382] |
PDF | TEXT | DETAILS |
Meetings: |
Bi-Weekly Public Information Sessions; National Industrial Security Program Operations Manual Insider Threat Program and Security Executive Agent Directive 3 |
Pages 19575 – 19575 [FR DOC # 2018–09349] |
PDF | TEXT | DETAILS |
02 May 2018
Notices |
Civil Monetary Penalties: |
In the Matter of Qal-Tek Associates, LLC |
Pages 19308 – 19310 [FR DOC # 2018–09229] |
PDF | TEXT | DETAILS |
License Renewals; Applications: |
Florida Power & Light Company; Turkey Point Nuclear Generating, Unit Nos. 3 and 4 |
Pages 19304 – 19306 [FR DOC # 2018–09279] |
PDF | TEXT | DETAILS |
License Terminations: |
Duke Energy Florida, LLC; Levy Nuclear Plant, Units 1 and 2 |
Pages 19306 – 19307 [FR DOC # 2018–09236] |
PDF | TEXT | DETAILS |
Petitions: |
Exelon Generation Company, LLC |
Pages 19302 – 19304 [FR DOC # 2018–09210] |
PDF | TEXT | DETAILS |
01 May 2018
Notices |
Sunshine Act Meeting Notice |
Pages 19120 – 19121 [FR DOC # 2018–09330] |
PDF | TEXT | DETAILS |
License Amendment; Applications: |
Centrus Energy Corp.; Proposed Decommissioning Plan |
Pages 19119 – 19120 [FR DOC # 2018–09084] |
PDF | TEXT | DETAILS |
 |
30 April 2018
|
No NRC notices published. |
27 April 2018
|
No NRC notices published. |
26 April 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: 10 CFR PART 62 Criteria and Procedures for Emergency Access to Non-Federal and Regional Low-Level Waste Disposal Facilities (3150-0143) |
Pages 18353 – 18354 [FR DOC # 2018–08713] |
PDF | TEXT | DETAILS |
Information Collection: NRC Form 7, "Application for NRC Export or Import License, Amendment, Renewal, or Consent Request(s)" |
Pages 18356 – 18357 [FR DOC # 2018–08712] |
PDF | TEXT | DETAILS |
Early Site Permit Applications: |
Early Site Permit Application: Tennessee Valley Authority; Clinch River Nuclear Site |
Pages 18354 – 18356 [FR DOC # 2018–08714] |
PDF | TEXT | DETAILS |
25 April 2018
Notices |
Combined Licenses: |
Florida Power & Light Company; Turkey Point Units 6 and 7 |
Pages 18091 – 18092 [FR DOC # 2018–08594] |
PDF | TEXT | DETAILS |
Guidance: |
Mitigation Strategies for Beyond-Design-Basis External Events |
Pages 18089 – 18090 [FR DOC # 2018–08601] |
PDF | TEXT | DETAILS |
Indemnity Agreements: |
Florida Power & Light Company; Turkey Point Units 6 and 7 |
Pages 18090 – 18091 [FR DOC # 2018–08593] |
PDF | TEXT | DETAILS |
24 April 2018
Notices |
Sunshine Act Meeting Notice |
Pages 17858 – 17858 [FR DOC # 2018–08634] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 17858 – 17867 [FR DOC # 2018–08070] |
PDF | TEXT | DETAILS |
Guidance: |
Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems |
Pages 17867 – 17868 [FR DOC # 2018–08493] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards Revised Notice of Meeting |
Pages 17868 – 17869 [FR DOC # 2018–08483] |
PDF | TEXT | DETAILS |
23 April 2018
Notices |
License Renewal Applications; Withdrawals: |
Pacific Gas & Electric Company; Diablo Canyon Power Plant, Unit Nos. 1 and 2; Withdrawal of License Renewal Application |
Pages 17688 – 17689 [FR DOC # 2018–08366] |
PDF | TEXT | DETAILS |
20 April 2018
|
No NRC notices published. |
19 April 2018
Notices |
Guidance: |
Program-Specific Guidance About Irradiator Licenses and Program-Specific Guidance About Academic, Research and Development, and Other Licenses of Limited Scope, Including Electron Capture Devices and X-Ray Fluorescence Analyzers |
Pages 17450 – 17451 [FR DOC # 2018–08190] |
PDF | TEXT | DETAILS |
18 April 2018
Notices |
License Renewals; Applications: |
Florida Power & Light Company; Turkey Point Nuclear Generating Unit Nos. 3 and 4 |
Pages 17196 – 17197 [FR DOC # 2018–08092] |
PDF | TEXT | DETAILS |
17 April 2018
Notices |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Reliability and Probabilistic Risk Assessment; Notice of Meeting |
Pages 16905 – 16906 [FR DOC # 2018–07938] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting |
Pages 16906 – 16906 [FR DOC # 2018–07937] |
PDF | TEXT | DETAILS |
16 April 2018
Notices |
Sunshine Act Meeting Notice |
Pages 16403 – 16403 [FR DOC # 2018–08035] |
PDF | TEXT | DETAILS |
Sunshine Act Meeting Notice |
Pages 16403 – 16403 [FR DOC # 2018–07939] |
PDF | TEXT | DETAILS |
13 April 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants |
Pages 16134 – 16135 [FR DOC # 2018–07729] |
PDF | TEXT | DETAILS |
Guidance: |
Supplementary Guidance Documents for Subsequent License Renewal |
Pages 16133 – 16134 [FR DOC # 2018–07698] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS): Meeting of the ACRS Subcommittee on NuScale; Notice of Meeting |
Pages 16131 – 16131 [FR DOC # 2018–07689] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards; Notice of Meeting |
Pages 16131 – 16132 [FR DOC # 2018–07704] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS): Meeting of the ACRS Subcommittee on APR1400; Notice of Meeting |
Pages 16132 – 16133 [FR DOC # 2018–07688] |
PDF | TEXT | DETAILS |
12 April 2018
Notices |
Sunshine Act Meetings |
Pages 15879 – 15879 [FR DOC # 2018–07685] |
PDF | TEXT | DETAILS |
11 April 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Voluntary Reporting of Planned New Reactor Applications |
Pages 15644 – 15645 [FR DOC # 2018–07456] |
PDF | TEXT | DETAILS |
10 April 2018
Notices |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 15412 – 15420 [FR DOC # 2018–06668] |
PDF | TEXT | DETAILS |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Standards for Protection Against Radiation |
Pages 15411 – 15412 [FR DOC # 2018–07257] |
PDF | TEXT | DETAILS |
Information Collection: General Domestic Licenses for Byproduct Material |
Pages 15421 – 15422 [FR DOC # 2018–07259] |
PDF | TEXT | DETAILS |
Information Collection: 10 CFR Part 140, Financial Protection Requirements and Indemnity Agreements |
Pages 15422 – 15423 [FR DOC # 2018–07258] |
PDF | TEXT | DETAILS |
License Amendment Applications: |
Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant; Independent Spent Fuel Storage Installation; Correct Inspection Intervals Acceptance Criteria |
Pages 15420 – 15421 [FR DOC # 2018–07304] |
PDF | TEXT | DETAILS |
09 April 2018
Notices |
Sunshine Act Meetings |
Pages 15179 – 15179 [FR DOC # 2018–07372] |
PDF | TEXT | DETAILS |
Guidance: |
Guidance for Developing Principal Design Criteria for Non-Light Water Reactors |
Pages 15178 – 15179 [FR DOC # 2018–07214 |
PDF | TEXT | DETAILS |
Evaluating Deviations and Reporting Defects and Noncompliance |
Pages 15179 – 15180 [FR DOC # 2018–07118] |
PDF | TEXT | DETAILS |
06 April 2018
Notices |
Sunshine Act Meeting Notice |
Pages 14898 – 14898 [FR DOC # 2018–07246] |
PDF | TEXT | DETAILS |
Environmental Impact Statements; Availability, etc.: |
Holtec International HI-STORE Consolidated Interim Storage Facility Project |
Pages 14897 – 14898 [FR DOC # 2018–07006] |
PDF | TEXT | DETAILS |
Exemptions: |
Omaha Public Power District; Fort Calhoun Station, Unit No. 1 |
Pages 14893 – 14897 [FR DOC # 2018–07034] |
PDF | TEXT | DETAILS |
Omaha Public Power District; Fort Calhoun Station, Unit No. 1 |
Pages 14898 – 14901 [FR DOC # 2018–07033] |
PDF | TEXT | DETAILS |
05 April 2018
|
No NRC notices published. |
04 April 2018
Notices |
Confirmatory Orders: |
In the Matter of Entergy Nuclear Operations, Inc. and Entergy Operations, Inc.; Arkansas Nuclear One, Grand Gulf Nuclear Station, Indian Point Energy Center, Palisades Nuclear Plant, Pilgrim Nuclear Power Station, River Bend Station, and Waterford Steam Electric Station, Unit 3 |
Pages 14520 – 14524 [FR DOC # 2018–06819] |
PDF | TEXT | DETAILS |
License Amendment; Applications: |
Pacific Gas and Electric Company; Diablo Canyon Power Plant, Units 1 and 2 |
Pages 14524 – 14524 [FR DOC # 2018–06781] |
PDF | TEXT | DETAILS |
03 April 2018
Notices |
Sunshine Act Meeting Notice |
Pages 14298 – 14298 [FR DOC # 2018–06853] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Reliability and Probabilistic Risk Assessment; Notice of Meeting |
Pages 14297 – 14298 [FR DOC # 2018–06708] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Radiation Protection and Nuclear Materials; Notice of Meeting |
Pages 14298 – 14299 [FR DOC # 2018–06709] |
PDF | TEXT | DETAILS |
02 April 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Requests to Non-Agreement States for Information |
Pages 14064 – 14065 [FR DOC # 2018–06594] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting |
Pages 14063 – 14064 [FR DOC # 2018–06644] |
PDF | TEXT | DETAILS |
 |
30 March 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Physical Protection of Plants and Materials |
Pages 13801 – 13802 [FR DOC # 2018–06495] |
PDF | TEXT | DETAILS |
Environmental Impact Statements; Availability, etc.: |
Holtec International HI-STORE Consolidated Interim Storage Facility Project |
Pages 13802 – 13804 [FR DOC # 2018–06398] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Resolution of Auxiliary Building Wall Thickness and Description Inconsistencies |
Pages 13799 – 13801 [FR DOC # 2018–06393] |
PDF | TEXT | DETAILS |
License Amendment; Applications: |
Vogtle Electric Generating Plant, Units 3 and 4: Tier 1 and Tier 2* Editorial and Consistency Changes |
Pages 13796 – 13799 [FR DOC # 2018–06387] |
PDF | TEXT | DETAILS |
29 March 2018
Notices |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Testing Inspections, Tests, Analyses, and Acceptance Criteria Consolidation |
Pages 13527 – 13528 [FR DOC # 2018–06386] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Reactor Vessel Head Vent Capacity |
Pages 13528 – 13530 [FR DOC # 2018–06261] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Raceway and Cable Routing |
Pages 13530 – 13531 [FR DOC # 2018–06374] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; PXS/ADS Line Resistance Changes |
Pages 13531 – 13532 [FR DOC # 2018–06383] |
PDF | TEXT | DETAILS |
28 March 2018
|
No NRC notices published. |
27 March 2018
Notices |
Sunshine Act Meeting Notice |
Pages 13156 – 13156 [FR DOC # 2018–06249] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 13146 – 13156 [FR DOC # 2018–05905] |
PDF | TEXT | DETAILS |
26 March 2018
|
No NRC notices published. |
23 March 2018
Notices |
Meetings: |
Advisory Committee on Reactor Safeguards; Notice of Meeting |
Pages 12823 – 12824 [FR DOC # 2018–05945] |
PDF | TEXT | DETAILS |
22 March 2018
Proposed Rules |
|
Requirements for the Indefinite Storage of Spent Nuclear Fuel |
Pages 12504 – 12505 [FR DOC # 2018–05776] |
PDF | TEXT | DETAILS |
Notices |
License Transfers: |
In the Matter of Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1 |
Pages 12616 – 12617 [FR DOC # 2018–05873] |
PDF | TEXT | DETAILS |
21 March 2018
Notices |
License Amendment; Applications: |
Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station; Revision to License Condition 2.C.(5) Regarding BWRVIP-18 |
Pages 12413 – 12414 [FR DOC # 2018–05690] |
PDF | TEXT | DETAILS |
20 March 2018
Notices |
Sunshine Act Meeting Notice |
Pages 12205 – 12206 [FR DOC # 2018–05768] |
PDF | TEXT | DETAILS |
License Amendment; Applications: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4 |
Pages 12206 – 12206 [FR DOC # 2018–05568] |
PDF | TEXT | DETAILS |
19 March 2018
Notices |
License Applications: |
Holtec International's HI-STORE Consolidated Interim Storage Facility for Interim Storage of Spent Nuclear Fuel |
Pages 12034 – 12036 [FR DOC # 2018–05438] |
PDF | TEXT | DETAILS |
University of Massachusetts at Lowell; University of Massachusetts at Lowell Research Reactor |
Pages 12036 – 12041 [FR DOC # 2018–05446] |
PDF | TEXT | DETAILS |
16 March 2018
|
No NRC notices published. |
15 March 2018
|
No NRC notices published. |
14 March 2018
Proposed Rules |
Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems |
Pages 11154 – 11155 [FR DOC # 2018–04958] |
PDF | TEXT | DETAILS |
13 March 2018
Notices |
Withdrawal of Regulatory Issue Summary 2012-10, "NRC Staff Position on Applying Surveillance Requirements 3.0.2 and 3.0.3 to Administrative Controls Program Tests" |
Pages 10911 – 10911 [FR DOC # 2018–04986] |
PDF | TEXT | DETAILS |
Exemption and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Pipe Rupture Hazard and Flooding Analysis |
Pages 10927 – 10928 [FR DOC # 2018–04987] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 10911 – 10927 [FR DOC # 2018–04827] |
PDF | TEXT | DETAILS |
12 March 2018
Notices |
Sunshine Act Meetings |
Pages 10754 – 10755 [FR DOC # 2018–04980] |
PDF | TEXT | DETAILS |
Guidance: |
Qualification of Safety-Related Lead Storage Batteries for Nuclear Power Plants |
Pages 10755 – 10755 [FR DOC # 2018–04828] |
PDF | TEXT | DETAILS |
License Terminations: |
Rapiscan Laboratories, Incorporated Sunnyvale, CA |
Pages 10756 – 10757 [FR DOC # 2018–04947] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Notice of Meeting of the ACRS Subcommittee on NuScale |
Pages 10757 – 10757 [FR DOC # 2018–04837] |
PDF | TEXT | DETAILS |
09 March 2018
Proposed Rules |
Draft Regulatory Issue: |
Clarification of the Requirements for Reactor Pressure Vessel Upper Head Bare Metal Visual Examinations |
Pages 10407 – 10407 [FR DOC # 2018–04350] |
PDF | TEXT | DETAILS |
08 March 2018
Notices |
Sunshine Act Meeting Notice |
Pages 9879 – 9879 [FR DOC # 2018–04722] |
PDF | TEXT | DETAILS |
License Applications; Amendments: |
Rio Algom, LLC; Ambrosia Lake Facility, McKinley County, New Mexico Source Materials License SUA–1473 |
Pages 9874 – 9876 [FR DOC # 2018–04673] |
PDF | TEXT | DETAILS |
License Transfers; Applications: |
Virgil C. Summer Nuclear Station, Unit 1, 2, and 3, and Independent Spent Fuel Storage Installation; Consideration of Approval of Transfer of License |
Pages 9876 – 9879 [FR DOC # 2018–04674] |
PDF | TEXT | DETAILS |
07 March 2018
Notices |
Charter Renewals: |
Advisory Committee on the Medical Uses of Isotopes Renewal Notice |
Pages 9760 – 9761 [FR DOC # 2018–04610] |
PDF | TEXT | DETAILS |
06 March 2018
Notices |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 9553 – 9559 [FR DOC # 2018–03235] |
PDF | TEXT | DETAILS |
Exemptions: |
FirstEnergy Nuclear Operating Company; Beaver Valley Power Station; Unit Nos. 1 and 2; Use of Optimized ZIRLO™ |
Pages 9550 – 9552 [FR DOC # 2018–04549] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards; Notice of Meeting, Revised |
Pages 9559 – 9560 [FR DOC # 2018–04471] |
PDF | TEXT | DETAILS |
05 March 2018
Notices |
Sunshine Act Meeting Notice |
Pages 9343 – 9344 [FR DOC # 2018–04561 |
PDF | TEXT | DETAILS |
Aluminum High Energy Arc Fault (HEAF) Particle Size Characterization |
Pages 9344 – 9345 [FR DOC # 2018–04341] |
PDF | TEXT | DETAILS |
02 March 2018
|
No NRC notices published. |
01 March 2018
Notices |
License Applications; Amendments: |
PSEG Nuclear, LLC; Exelon Generation Company, LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Rod Position Indicators |
Pages 8904 – 8907 [FR DOC # 2018–04182] |
PDF | TEXT | DETAILS |
 |
28 February 2018
|
No NRC notices published. |
27 February 2018
Notices |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 8509 – 8523 [FR DOC # 2018–03727] |
PDF | TEXT | DETAILS |
26 February 2018
Notices |
Environmental Assessments; Availability, etc.: |
National Institutes of Health |
Pages 8302 – 8303 [FR DOC # 2018–03789] |
PDF | TEXT | DETAILS |
23 February 2018
Notices |
Sunshine Act Meeting Notice |
Pages 8117 – 8117 [FR DOC # 2018–03827] |
PDF | TEXT | DETAILS |
22 February 2018
Notices |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Metallurgy and Reactor Fuels; Notice of Meeting |
Pages 7788 – 7789 [FR DOC # 2018–03560] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting |
Pages 7789 – 7789 [FR DOC # 2018–03588] |
PDF | TEXT | DETAILS |
21 February 2018
Notices |
Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2 |
Pages 7500 – 7503 [FR DOC # 2018–03456] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Future Plant Designs; Notice of Meeting |
Pages 7503 – 7504 [FR DOC # 2018–03447] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on APR1400; Notice of Meeting |
Pages 7504 – 7504 [FR DOC # 2018–03446] |
PDF | TEXT | DETAILS |
20 February 2018
Notices |
Draft Flood Penetration Seal Performance at Nuclear Power Plants; Literature Review (Task 1.1) and Test Methodology (Task 1.2) |
Pages 7239 – 7241 [FR DOC # 2018–03340] |
PDF | TEXT | DETAILS |
16 February 2018
Notices |
Meetings: |
Advisory Committee on Reactor Safeguards; Notice of Meeting |
Pages 7083 – 7084 [FR DOC # 2018–03264] |
PDF | TEXT | DETAILS |
15 February 2018
Notices |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Addition of In-Containment Refueling Water Storage Tank (IRWST); Lower Narrow Range Level Instrumentation |
Pages 6887 – 6888 [FR DOC # 2018–03169] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Emergency Planning ITAAC Revisions |
Pages 6888 – 6890 [FR DOC # 2018–03168] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Addition of Steam Generator System (SGS) Thermal Relief Valves |
Pages 6890 – 6891 [FR DOC # 2018–03167] |
PDF | TEXT | DETAILS |
14 February 2018
Proposed Rules |
Disposal of Greater-than-Class C and Transuranic Waste: |
Greater-Than-Class C and Transuranic Waste |
Pages 6475 – 6477 [FR DOC # 2018–03085] |
PDF | TEXT | DETAILS |
Notices |
Very Low-Level Radioactive Waste Scoping Study |
Pages 6619 – 6621 [FR DOC # 2018–03083] |
PDF | TEXT | DETAILS |
License Amendment Applications: |
Florida Power and Light Company; St. Lucie Plant, Unit Nos. 1 and 2 |
Pages 6621 – 6624 [FR DOC # 2018–03003] |
PDF | TEXT | DETAILS |
13 February 2018
Notices |
Determinations of Successful Completions of Inspections, Tests, and Analyses: |
Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria |
Pages 6217 – 6218 [FR DOC # 2018–02872] |
PDF | TEXT | DETAILS |
Exemptions: |
Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Independent Spent Fuel Storage Installation |
Pages 6244 – 6247 [FR DOC # 2018–02930] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 6218 – 6242 [FR DOC # 2018–02636] |
PDF | TEXT | DETAILS |
Guidance: |
Fire Protection for Nuclear Power Plants |
Pages 6243 – 6244 [FR DOC # 2018–02870] |
PDF | TEXT | DETAILS |
License Renewals: |
Virginia Electric and Power Company, Old Dominion Electric Cooperative, North Anna Power Station Independent Spent Fuel Storage Installation |
Pages 6242 – 6243 [FR DOC # 2018–02904] |
PDF | TEXT | DETAILS |
12 February 2018
Notices |
Qualification and Training of Personnel for Nuclear Power Plants |
Pages 6053 – 6054 [FR DOC # 2018–02816] |
PDF | TEXT | DETAILS |
Sunshine Act Meeting Notice |
Pages 6054 – 6055 [FR DOC # 2018–02934] |
PDF | TEXT | DETAILS |
09 February 2018
|
No NRC notices published. |
08 February 2018
|
No NRC notices published. |
07 February 2018
Proposed Rules |
Regulatory Improvements for Power Reactors Transitioning to Decommissioning |
Pages 5373 – 5374 [FR DOC # 2018–02402] |
PDF | TEXT | DETAILS |
Notices |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Station, Units 3 and 4; Addition of a Residual Heat Removal Suction Relief Valve for Low-Temperature Overpressure Protection |
Pages 5465 – 5467 [FR DOC # 2018–02473] |
PDF | TEXT | DETAILS |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Shield Building Roof Changes |
Pages 5467 – 5468 [FR DOC # 2018–02472] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on the Medical Uses of Isotopes; Meeting Notice |
Pages 5465 – 5465 [FR DOC # 2018–02375] |
PDF | TEXT | DETAILS |
06 February 2018
Notices |
Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information |
Pages 5277 – 5284 [FR DOC # 2018–01706] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS) Meeting of the ACRS Subcommittee on AP1000; Notice of Meeting |
Pages 5277 – 5277 [FR DOC # 2018–02312] |
PDF | TEXT | DETAILS |
05 February 2018
Notices |
Sunshine Act Meeting Notice |
Pages 5146 – 5146 [FR DOC # 2018–02274] |
PDF | TEXT | DETAILS |
02 February 2018
Notices |
Environmental Assessments; Availability, etc.: |
North Anna Power Station Independent Spent Fuel Storage Installation |
Pages 4932 – 4934 [FR DOC # 2018–02111] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards; Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting |
Pages 4934 – 4934 [FR DOC # 2018–02068] |
PDF | TEXT | DETAILS |
Requests for Nominations: |
Advisory Committee on the Medical Uses of Isotopes; Call for Nominations |
Pages 4931 – 4932 [FR DOC # 2018–02072] |
PDF | TEXT | DETAILS |
01 February 2018
|
No NRC notices published. |
 |
31 January 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: Domestic Licensing of Production and Utilization Facilities |
Pages 4522 – 4523 [FR DOC # 2018–01875] |
PDF | TEXT | DETAILS |
Guidance: |
An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis |
Pages 4520 – 4521 [FR DOC # 2018–01901] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards; Notice of Meeting-Revised |
Pages 4521 – 4522 [FR DOC # 2018–01815] |
PDF | TEXT | DETAILS |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Future Plant Designs; Notice of Meeting |
Pages 4523 – 4523 [FR DOC # 2018–01839] |
PDF | TEXT | DETAILS |
30 January 2018
Notices |
Exemptions: |
Arizona Public Service Company Palo Verde Nuclear Generating Station, Units 1, 2, and 3 |
Pages 4288 – 4289 [FR DOC # 2018–01799] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 4289 – 4296 [FR DOC # 2018–01469] |
PDF | TEXT | DETAILS |
License Amendment Applications: |
Florida Power & Light Company; Turkey Point Nuclear Generating Unit No. 3 |
Pages 4285 – 4288 [FR DOC # 2018–01636] |
PDF | TEXT | DETAILS |
29 January 2018
Notices |
Agency Information Collection Activities; Proposals, Submissions, and Approvals: |
Information Collection: 10 CFR Part 100 "Reactor Site Criteria" |
Pages 4076 – 4077 [FR DOC # 2018–01543] |
PDF | TEXT | DETAILS |
Director's Decisions: |
In the Matter of All Operating Reactor Licensees |
Pages 4077 – 4078 [FR DOC # 2018–01514] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Strata Energy, Inc.; Ross Uranium In Situ Recovery Facility; Source and Byproduct Materials License |
Pages 4079 – 4080 [FR DOC # 2018–01522] |
PDF | TEXT | DETAILS |
Exemptions and Combined Licenses; Amendments: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Containment Air Filtration Exhaust Rooms West Walls Removal |
Pages 4078 – 4079 [FR DOC # 2018–01520] |
PDF | TEXT | DETAILS |
26 January 2018
Notices |
Sunshine Act Meeting Notice |
Pages 3776 – 3777 [FR DOC # 2018–01663] |
PDF | TEXT | DETAILS |
25 January 2018
Proposed Rules |
Revision of Fee Schedules; Fee Recovery for Fiscal Year 2018 |
Pages 3407 – 3433 [FR DOC # 2018–01065] |
PDF | TEXT | DETAILS |
24 January 2018
Rules and Regulations |
List of Approved Spent Fuel Storage Casks: |
List of Approved Spent Fuel Storage Casks: TN Americas LLC, Standardized NUHOMS® Horizontal Modular Storage System, Certificate of Compliance No. 1004, Renewal of Initial Certificate and Amendment Nos. 1 Through 11 and 13, Revision 1, and 14; Corrections |
Pages 3261 – 3263 [FR DOC # 2018–01278] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Correction |
Pages 3368 – 3369 [FR DOC # 2018–01241] |
PDF | TEXT | DETAILS |
23 January 2018
Notices |
Sunshine Act Meeting Notice |
Pages 3190 – 3191 [FR DOC # 2018–01260] |
PDF | TEXT | DETAILS |
Environmental Assessments; Availability, etc.: |
Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation |
Pages 3192 – 3193 [FR DOC # 2018–01176] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on the Medical Uses of Isotopes; Meeting Notice |
Pages 3191 – 3192 [FR DOC # 2018–01139] |
PDF | TEXT | DETAILS |
22 January 2018
|
No NRC notices published. |
19 January 2018
Notices |
Meetings: |
Advisory Committee on Reactor Safeguards; Notice of Meeting |
Pages 2822 – 2823 [FR DOC # 2018–00933] |
PDF | TEXT | DETAILS |
18 January 2018
Rules and Regulations |
Incorporation by Reference of American Society of Mechanical Engineers Codes and Code Cases; Correction |
Pages 2525 – 2526 [FR DOC # 2018–00708] |
PDF | TEXT | DETAILS |
Notices |
Exemptions: |
Southern California Edison Company; San Onofre Nuclear Generating Station, Units 1, 2, and 3 |
Pages 2680 – 2685 [FR DOC # 2018–00715 |
PDF | TEXT | DETAILS |
License Renewals: |
Massachusetts Institute of Technology, Cambridge, Massachusetts; License Renewal; Issuance |
Pages 2685 – 2685 [FR DOC # 2018–00800] |
PDF | TEXT | DETAILS |
Requests for Nominations: |
Request for Applications; Qualified Candidates for the Advisory Committee on Reactor Safeguards |
Pages 2679 – 2680 [FR DOC # 2018–00770 |
PDF | TEXT | DETAILS |
17 January 2018
Rules and Regulations |
Approval of American Society of Mechanical Engineers' Code Cases |
Pages 2331 – 2354 [FR DOC # 2018–00112] |
PDF | TEXT | DETAILS |
16 January 2018
Notices |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 2224 – 2234 [FR DOC # 2018–00386] |
PDF | TEXT | DETAILS |
12 January 2018
Proposed Rules |
Regulatory Agenda: |
Unified Agenda of Federal Regulatory and Deregulatory Actions |
Pages 2018 – 2020 [FR DOC # 2017–28246] |
PDF | TEXT | DETAILS |
Rules and Regulations |
Adjustment of Civil Penalties for Inflation for Fiscal Year 2018 |
Pages 1515 – 1517 [FR DOC # 2018–00368 |
PDF | TEXT | DETAILS |
Notices |
Sunshine Act Meeting Notice |
Pages 1635 – 1636 [FR DOC # 2018–00629] |
PDF | TEXT | DETAILS |
Meetings: |
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on APR1400; Notice of Meeting |
Pages 1636 – 1636 [FR DOC # 2018–00424] |
PDF | TEXT | DETAILS |
11 January 2018
Notices |
Exemptions: |
Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3 |
Pages 1383 – 1388 [FR DOC # 2018–00318] |
PDF | TEXT | DETAILS |
10 January 2018
Notices |
Exemptions: |
American Centrifuge Lead Cascade Facility; American Centrifuge Operating, LLC |
Pages 1276 – 1278 [FR DOC # 2018–00255] |
PDF | TEXT | DETAILS |
Meetings: |
Licensing Support Network Advisory Review Panel: Revised Meeting Notice |
Pages 1274 – 1276 [FR DOC # 2018–00226] |
PDF | TEXT | DETAILS |
09 January 2018
|
No NRC notices published. |
08 January 2018
Notices |
Exemptions and Combined License Amendments: |
Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Slab Thickness Changes between Column Lines I to J-1 and 2 to 4 at Elevation 153'–0" |
Pages 838 – 839 [FR DOC # 2018–00055 |
PDF | TEXT | DETAILS |
05 January 2018
Notices |
Sunshine Act Meeting Notice |
Pages 689 – 690 [FR DOC # 2018–00116] |
PDF | TEXT | DETAILS |
04 January 2018
|
No NRC notices published. |
03 January 2018
Notices |
License Applications; Amendments: |
Department of Health and Human Services, Food and Drug Administration, Winchester Engineering and Analytical Center |
Pages 401 – 404 [FR DOC # 2017–28331] |
PDF | TEXT | DETAILS |
02 January 2018
Notices |
License Transfer Applications: |
Sunshine Act Meeting Notice |
Pages 160 – 161 [FR DOC # 2017–28396] |
PDF | TEXT | DETAILS |
Facility Operating and Combined Licenses: |
Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations |
Pages 161 – 175 [FR DOC # 2017–27930] |
PDF | TEXT | DETAILS |
Guidance: |
Yttrium-90 Microsphere Brachytherapy Sources and Devices TheraSphere® and SIR-Spheres® |
Pages 159 – 160 [FR DOC # 2017–28271] |
PDF | TEXT | DETAILS |
 |