Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for October 03, 2025

subscribe to page updates

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 0
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 86
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 0
Farley 1 0
Farley 2 100
Harris 1 95
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 0
North Anna 2 100
Oconee 1 100
Oconee 2 98
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 0
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power
Braidwood 1 87
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 0
D.C. Cook 1 100
D.C. Cook 2 0
Davis-Besse 100
Dresden 2 94
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 0
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power
Arkansas Nuclear 1 70
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 94
Wolf Creek 1 0
Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated October 03, 2025