Power Reactor Status Report for March 29, 2025

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 99 Steam Generator Limitations
Calvert Cliffs 1 100
Calvert Cliffs 2 60
Holding Power for Auto Voltage Regulator Testing
*
FitzPatrick 100
Ginna 100
Hope Creek 1 100
Limerick 1 100
Limerick 2 93 Coastdown to Refueling Outage
*
Millstone 2 100
Millstone 3 100


Nine Mile Point 1 0 3/17/2025
Refueling Outage
Nine Mile Point 2 92
Reduced Power for Maintenance
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 94 Coastdown to Refueling Outage
*
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 *
Susquehanna 2 0 3/24/2025
Refueling Outage

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 3/5/2025
Refueling Outage
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 8
Performing Startup
*
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 0 3/16/2025
Refueling Outage
Harris 1 100
Hatch 1 100
Hatch 2 0 3/27/2025
Maintenance Outage
McGuire 1 87 Coastdown to Refueling Outage
McGuire 2 100
North Anna 1 100
North Anna 2 0 3/2/2025
Refueling Outage
*
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 0 7/31/2024
Extended Outage
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 0 3/1/2025
Refueling Outage
*
Vogtle 1 100
Vogtle 2 0 3/6/2025
Refueling Outage
*
Vogtle 3 100
Vogtle 4 0 3/24/2025
Maintenance Outage
Watts Bar 1 0 1/17/2025
Forced Outage
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 94 Coastdown to Refueling Outage
*
Clinton 99
100% Electrical Capability
D.C. Cook 1 0 3/22/2025
Refueling Outage
D.C. Cook 2 100
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 95 Coastdown to Refueling Outage;

Power Increased Following Rod Power Adjustment
*
Perry 1 0 3/17/2025
Refueling Outage
Point Beach 1 0 3/22/2025
Refueling Outage
Point Beach 2 100

Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 0 3/10/2025
Refueling Outage
*
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 70
Reduced Power for Isolation of Waterbox
Callaway 0 3/29/2025
Refueling Outage
*
Columbia Generating Station 87 Coastdown to Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100

Diablo Canyon 2 100
Grand Gulf 1 76
Reduced Power for Rod Pattern Adjustment
*
Palo Verde 1 0 3/28/2025
Refueling Outage
*
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 0 2/11/2025
Refueling Outage
South Texas 1 100
South Texas 2 100
Waterford 3 94 Transformer Limitation
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.