Power Reactor Status Report for June 17, 2022

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 6/16/2022 EN 55943;
* 1
Beaver Valley 2 100
*
Calvert Cliffs 1 100 Hot Weather Alert
*
Calvert Cliffs 2 100 Hot Weather Alert
*
FitzPatrick 100
Ginna 100
Hope Creek 1 100
*
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100

Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100 Power Supply Alert
Browns Ferry 2 100 Power Supply Alert
Browns Ferry 3 100 Power Supply Alert
Brunswick 1 95 Reduced Power For Maintenance
*
Brunswick 2 100
Catawba 1 100 Grid is Yellow
Catawba 2 100 Grid is Yellow
Farley 1 100 Conservative Operations System Warning
Farley 2 100 Conservative Operations System Warning
Harris 1 100
*
Hatch 1 100 Conservative Operations System Warning
Hatch 2 100 Conservative Operations System Warning
McGuire 1 100 Grid is Yellow
McGuire 2 100 Grid is Yellow
North Anna 1 100 Hot Weather Alert
*
North Anna 2 100 Hot Weather Alert
*
Oconee 1 100 Grid is Yellow
Oconee 2 100 Grid is Yellow
Oconee 3 100 Grid is Yellow
Robinson 2 100
Saint Lucie 1 99 Holding power due to condensate pump design margin issue.
Saint Lucie 2 100
Sequoyah 1 100 Power Supply Alert
Sequoyah 2 100 Power Supply Alert
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100 Conservative Operations System Warning
Vogtle 2 100 Conservative Operations System Warning
Watts Bar 1 100 Power Supply Alert; Conservative Operations Alert
Watts Bar 2 0 3/2/2022 Refueling Outage;
Power Supply Alert; Conservative Operations Alert

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100 *
Byron 2 100
*
Clinton 100 *
D.C. Cook 1 100
D.C. Cook 2 100
Davis-Besse 100

Dresden 2 100
*
Dresden 3 100
*
Fermi 2 100
*
LaSalle 1 100
LaSalle 2 100
Monticello 100 *
Palisades 0 5/20/2022 Permanent Shutdown
Perry 1 90 Reduced Power for Outside Ambient Conditions *
Point Beach 1 100
*
Point Beach 2 100 *
Prairie Island 1 100
*
Prairie Island 2 100
*
Quad Cities 1 100
*
Quad Cities 2 100
*

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100 *
Arkansas Nuclear 2 100 Conservative Operations Alert
Callaway 100
Columbia Generating Station 40 Reduced Power for Economic Dispatch *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 97 Core Management *
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
*
Palo Verde 1 100
Palo Verde 2 100

Palo Verde 3 100

River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 0 4/2/2022 Refueling Outage
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Friday, July 15, 2022