Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for July 01, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100 *
Calvert Cliffs 2 100 *
FitzPatrick 100
Ginna 100
Hope Creek 1 30 Increasing Power *
Indian Point 2 0 2020-04-30 Reactor defueled for permanent shutdown
Indian Point 3 0 2021-05-01 Reactor defueled for permanent shutdown
Limerick 1 100
Limerick 2 100
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 99 Reduced Power For Testing *
Seabrook 1 100
Susquehanna 1 100 *
Susquehanna 2 100 *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100 *
Browns Ferry 2 100 *
Browns Ferry 3 100 *
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 99 100% Electrical Capability
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 0 2021-07-01 Shutdown For Planned Maintenance to replace temperature detectors *
Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100 *
North Anna 2 100 *
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100 *
Sequoyah 2 100 *
Summer 100
Surry 1 100 *
Surry 2 100 *
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100 *
Watts Bar 2 90 Limited to 90 percent power until Steam Generator replaced *

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 99 100% Electrical Capability; Capacity Advisory Alert
D.C. Cook 1 100
D.C. Cook 2 0 2021-06-23 See EN 55322
Davis-Besse 100
Dresden 2 100
Dresden 3 100
Fermi 2 100
LaSalle 1 100
LaSalle 2 100
Monticello 100
Palisades 100
Perry 1 100 *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 2020-12-25 See EN# 55049
Columbia Generating Station 100 *
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 100
River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.