Power Reactor Status Report for April 10, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 68 Coastdown To Refueling Outage - Reduced Power for Trevi Testing
High System Voltage Action
*
Beaver Valley 2 100 High System Voltage Action
*
Calvert Cliffs 1 97 Grid dispatcher request
High System Voltage Action
*
Calvert Cliffs 2 100 High System Voltage Action
*
FitzPatrick 100

Ginna 100
Hope Creek 1 77 Coastdown To Refueling Outage
Indian Point 2 0 4/30/2020 Reactor defueled for permanent shutdown
Indian Point 3 85 Coastdown To Refueling Outage *
Limerick 1 100 High System Voltage Action
*
Limerick 2 81 Coastdown To Refueling Outage
High System Voltage Action
*
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 1 Startup in Progress *
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 High System Voltage Action
*
Susquehanna 2 0 3/22/2021 Refueling Outage
High System Voltage Action
*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 2/26/2021 Refueling Outage
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 97 Reduced Power For Rod Pattern Adjustment
*
Catawba 1 100
Catawba 2 0 3/28/2021 Refueling Outage
*
Farley 1 0 3/22/2021 Refueling Outage
Farley 2 100
Harris 1 99 Coastdown To Refueling Outage
*
Hatch 1 100
Hatch 2 19 Troubleshooting Generator Temperature Issues *
McGuire 1 100
McGuire 2 100
North Anna 1 0 3/14/2021 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 4/10/2021 Planned Maintenance Outage
*
Saint Lucie 2 100
Sequoyah 1 0 4/10/2021 Refueling Outage
*
Sequoyah 2 100
Summer 100
Surry 1 97 Reduced Power For Unplanned Maintenance Until Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 90 Max Power until Steam Generator Replacement.

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 4/5/2021 Refueling Outage

*
Braidwood 2 100
Byron 1 100 High System Voltage Action
*
Byron 2 100 High System Voltage Action
*
Clinton 98 Full Electrical Output
D.C. Cook 1 100

High System Voltage Action
*
D.C. Cook 2 100
High System Voltage Action
*
Davis-Besse 100
High System Voltage Action
*
Dresden 2 100 High System Voltage Action
*
Dresden 3 100
High System Voltage Action
*
Fermi 2 100
LaSalle 1 100 High System Voltage Action
*
LaSalle 2 0 2/22/2021 Refueling Outage,
High System Voltage Action
*
Monticello 82 Coastdown To Refueling Outage *
Palisades 100
Perry 1 85 Holding Power
*
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100

Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 4/10/2021
Refueling Outage
*
Arkansas Nuclear 2 100
Callaway 0 12/25/2020 See EN# 55049
Columbia Generating Station 93 Coastdown To Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2/4/2021 Forced Outage and Refueling Outage
*
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 4/10/2021 Refueling Outage
*
River Bend Station 1 86 Flow Limited,
Severe Weather Alert
*
South Texas 1 100
South Texas 2 0 3/20/2021 Refueling Outage
Waterford 3 99 Holding Power

Wolf Creek 1 0 3/25/2021
Refueling Outage

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, May 10, 2021