Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for April 10, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 68 Coastdown To Refueling Outage - Reduced Power for Trevi Testing High System Voltage Action *
Beaver Valley 2 100 High System Voltage Action *
Calvert Cliffs 1 97 Grid dispatcher request High System Voltage Action *
Calvert Cliffs 2 100 High System Voltage Action *
FitzPatrick 100
Ginna 100
Hope Creek 1 77 Coastdown To Refueling Outage
Indian Point 2 0 2020-04-30 Reactor defueled for permanent shutdown
Indian Point 3 85 Coastdown To Refueling Outage *
Limerick 1 100 High System Voltage Action *
Limerick 2 81 Coastdown To Refueling Outage High System Voltage Action *
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 1 Startup in Progress *
Nine Mile Point 2 100
Peach Bottom 2 100
Peach Bottom 3 100
Salem 1 100
Salem 2 100
Seabrook 1 100
Susquehanna 1 100 High System Voltage Action *
Susquehanna 2 0 2021-03-22 Refueling Outage High System Voltage Action *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 0 2021-02-26 Refueling Outage
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 97 Reduced Power For Rod Pattern Adjustment *
Catawba 1 100
Catawba 2 0 2021-03-28 Refueling Outage *
Farley 1 0 2021-03-22 Refueling Outage
Farley 2 100
Harris 1 99 Coastdown To Refueling Outage *
Hatch 1 100
Hatch 2 19 Troubleshooting Generator Temperature Issues *
McGuire 1 100
McGuire 2 100
North Anna 1 0 2021-03-14 Refueling Outage
North Anna 2 100
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 0 2021-04-10 Planned Maintenance Outage *
Saint Lucie 2 100
Sequoyah 1 0 2021-04-10 Refueling Outage *
Sequoyah 2 100
Summer 100
Surry 1 97 Reduced Power For Unplanned Maintenance Until Outage
Surry 2 100
Turkey Point 3 100
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100
Watts Bar 2 90 Max Power until Steam Generator Replacement.

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 0 2021-04-05 Refueling Outage *
Braidwood 2 100
Byron 1 100 High System Voltage Action *
Byron 2 100 High System Voltage Action *
Clinton 98 Full Electrical Output
D.C. Cook 1 100 High System Voltage Action *
D.C. Cook 2 100 High System Voltage Action *
Davis-Besse 100 High System Voltage Action *
Dresden 2 100 High System Voltage Action *
Dresden 3 100 High System Voltage Action *
Fermi 2 100
LaSalle 1 100 High System Voltage Action *
LaSalle 2 0 2021-02-22 Refueling Outage, High System Voltage Action *
Monticello 82 Coastdown To Refueling Outage *
Palisades 100
Perry 1 85 Holding Power *
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 0 2021-04-10 Refueling Outage *
Arkansas Nuclear 2 100
Callaway 0 2020-12-25 See EN# 55049
Columbia Generating Station 93 Coastdown To Refueling Outage
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 100
Diablo Canyon 2 0 2021-02-04 Forced Outage and Refueling Outage *
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100
Palo Verde 3 0 2021-04-10 Refueling Outage *
River Bend Station 1 86 Flow Limited, Severe Weather Alert *
South Texas 1 100
South Texas 2 0 2021-03-20 Refueling Outage
Waterford 3 99 Holding Power
Wolf Creek 1 0 2021-03-25 Refueling Outage

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.