Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for May 27, 2019

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100   *  
Beaver Valley 2 100      
Calvert Cliffs 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Calvert Cliffs 2 100   HIGH SYSTEM VOLTAGE ACTION *  
FitzPatrick 100      
Ginna 100      
Hope Creek 1 100      
Indian Point 2 100      
Indian Point 3 100      
Limerick 1 100      
Limerick 2 38   RECIRC PUMP TRIP *  
Millstone 2 100      
Millstone 3 100      
Nine Mile Point 1 100      
Nine Mile Point 2 100      
Peach Bottom 2 100      
Peach Bottom 3 100      
Pilgrim 1 40   REDUCED POWER DUE TO MAIN CONDENSER PARAMETERS *  
Salem 1 0 04/12/2019 REFUELING OUTAGE    
Salem 2 100      
Seabrook 1 100      
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100      

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100      
Browns Ferry 2 91   HOLDING POWER FOR EXTENDED UPRATE TESTING    
Browns Ferry 3 100      
Brunswick 1 100      
Brunswick 2 100      
Catawba 1 100      
Catawba 2 100      
Farley 1 100   *  
Farley 2 100   *  
Harris 1 100      
Hatch 1 100   *  
Hatch 2 100   *  
McGuire 1 100      
McGuire 2 100      
North Anna 1 100      
North Anna 2 100      
Oconee 1 100      
Oconee 2 100      
Oconee 3 100      
Robinson 2 100      
Saint Lucie 1 0 04/25/2019 SEE EN#54027    
Saint Lucie 2 100      
Sequoyah 1 100      
Sequoyah 2 100      
Summer 100      
Surry 1 100      
Surry 2 100      
Turkey Point 3 100      
Turkey Point 4 100      
Vogtle 1 100      
Vogtle 2 100      
Watts Bar 1 100      
Watts Bar 2 100      

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100      
Braidwood 2 100   *  
Byron 1 100      
Byron 2 100      
Clinton 98   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 100   HIGH SYSTEM VOLTAGE ACTION *  
D.C. Cook 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Davis-Besse 100   HIGH SYSTEM VOLTAGE ACTION *  
Dresden 2 100      
Dresden 3 100      
Duane Arnold 100      
Fermi 2 100      
LaSalle 1 100      
LaSalle 2 100      
Monticello 100      
Palisades 100      
Perry 1 100      
Point Beach 1 100      
Point Beach 2 100      
Prairie Island 1 100      
Prairie Island 2 100      
Quad Cities 1 100      
Quad Cities 2 100      

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100      
Arkansas Nuclear 2 0 05/26/2019 SEE EN #54091 * 1
Callaway 100      
Columbia Generating Station 0 05/11/2019 REFUELING OUTAGE    
Comanche Peak 1 7   INCREASING POWER *  
Comanche Peak 2 100      
Cooper 100      
Diablo Canyon 1 100      
Diablo Canyon 2 100      
Grand Gulf 1 94   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Palo Verde 1 100      
Palo Verde 2 100      
Palo Verde 3 100      
River Bend Station 1 90   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
South Texas 1 100      
South Texas 2 100      
Waterford 3 0 05/16/2019 SEE EN #54068 *  
Wolf Creek 1 98   SEE EN #54087    