The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for May 01, 2018
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 0 | 04/15/2018 | REFUELING OUTAGE | ||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | * | |||
| Calvert Cliffs 2 | 100 | * | |||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 0 | 04/13/2018 | REFUELING OUTAGE | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | TWO CONTINGENCIES AWAY FROM A DOWNPOWER | * | ||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 0 | 04/15/2018 | REFUELING OUTAGE | ||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | 150 MVAR RESTRICTION FOR TURBINE VIBRATION | |||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 0 | 04/27/2018 | PLANNED SHUTDOWN DUE TO FEED REG VALVE ISSUES | ||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | TWO CONTINGENCIES AWAY FROM DOWNPOWER (CONDITION WILL CONTINUE TO ~ MAY 1) | |||
| Susquehanna 1 | 0 | 03/30/2018 | REFUELING OUTAGE | * | |
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 85 | HOLDING POWER FOLLOWING TESTING | |||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Farley 1 | 0 | 04/08/2018 | REFUELING OUTAGE | * | |
| Farley 2 | 100 | ||||
| Harris 1 | 0 | 04/06/2018 | REFUELING OUTAGE | ||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 0 | 04/20/2018 | REFUELING OUTAGE | ||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 0 | 04/06/2018 | REFUELING OUTAGE | ||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 0 | 04/20/2018 | REFUELING OUTAGE | ||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 | ||||
| Watts Bar 2 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 12 | SEE EN #53371 | * | 1 | |
| Braidwood 2 | 99 | INCREASING POWER | * | ||
| Byron 1 | 97 | DOWNPOWER DUE TO ADVANCED NUCLEAR DISPATCH | * | ||
| Byron 2 | 96 | DOWNPOWER DUE TO ADVANCED NUCLEAR DISPATCH | * | ||
| Clinton | 0 | 04/29/2018 | REFUELING OUTAGE | * | |
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 0 | 02/28/2018 | REFUELING OUTAGE | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| Dresden 3 | 100 | MINIMUM GENERATION ALERT | * | ||
| Duane Arnold | 100 | ||||
| Fermi 2 | 0 | 04/14/2018 | FORCED OUTAGE - DISASSEMBLING REACTOR FOR MAINTENANCE | ||
| LaSalle 1 | 100 | ||||
| LaSalle 2 | 65 | DOWNPOWER FOR ECONOMIC DISPATCH | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 99 | LOAD FOLLOWING MINIMUM GENERATION ALERT | * | ||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 0 | 03/23/2018 | REFUELING OUTAGE | * | |
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | * | |||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Grand Gulf 1 | 0 | 04/06/2018 | REFUELING OUTAGE | ||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 0 | 04/06/2018 | REFUELING OUTAGE | ||
| River Bend 1 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 03/30/2018 | REFUELING OUTAGE |
Page Last Reviewed/Updated Thursday, August 27, 2026
Page Last Reviewed/Updated Thursday, August 27, 2026