Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 0 04/15/2018 REFUELING OUTAGE *  
Beaver Valley 2 100        
Calvert Cliffs 1 100   MINIMUM GENERATION ADVISORY HIGH SYSTEM VOLTAGE ACTION *  
Calvert Cliffs 2 100   MINIMUM GENERATION ADVISORY HIGH SYSTEM VOLTAGE ACTION *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 0 04/13/2018 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Indian Point 2 0 03/18/2018 REFUELING OUTAGE    
Indian Point 3 100   ONE 138 kV FEEDER OOS TWO 138 kV FEEDERS RESTRICTED *  
Limerick 1 0 03/25/2018 REFUELING OUTAGE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 94   COASTDOWN TO REFUELING OUTAGE    
Oyster Creek 100        
Peach Bottom 2 100   150 MVAR RESTRICTION FOR TURBINE VIBRATION    
Peach Bottom 3 100     *  
Pilgrim 1 0 03/06/2018 MAINTENANCE OUTAGE - MAIN XFMR ASSESSMENT *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100   ONE CONTINGENCY AWAY FROM DOWNPOWER (CONDITION WILL CONTINUE TO ~ MAY 1)    
Susquehanna 1 0 03/30/2018 REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION *  
Susquehanna 2 100   HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   OUTGOING LIMIT DUE TO 500 kV OOS *  
Browns Ferry 2 100   OUTGOING LIMIT DUE TO 500 kV OOS    
Browns Ferry 3 86   OUTGOING LIMIT DUE TO 500 kV OOS POWER TESTING IN PROGRESS *  
Brunswick 1 92   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 48   HOLDING POWER FOR VALVE EVALUATION *  
Farley 1 0 04/08/2018 REFUELING OUTAGE *  
Farley 2 100        
Harris 1 0 04/06/2018 REFUELING OUTAGE *  
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 03/10/2018 REFUELING OUTAGE    
North Anna 2 100        
Oconee 1 82   INCREASING POWER *  
Oconee 2 100        
Oconee 3 88   COASTDOWN TO REFUELING OUTAGE *  
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 0 04/06/2018 REFUELING OUTAGE    
Sequoyah 2 100        
Summer 100        
Surry 1 91   COASTDOWN TO REFUELING OUTAGE    
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 23   INCREASING POWER *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 04/08/2018 REFUELING OUTAGE    
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   COASTDOWN TO REFUELING OUTAGE    
D.C. Cook 1 100        
D.C. Cook 2 0 02/28/2018 REFUELING OUTAGE    
Davis-Besse 100   MINIMUM GENERATION ADVISORY    
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 04/14/2018 AUTOMATIC REACTOR SCRAM - SEE EN#53336 * 1
LaSalle 1 100        
LaSalle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 03/23/2018 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 83   INCREASING POWER *  
Diablo Canyon 2 100        
Grand Gulf 1 0 04/06/2018 REFUELING OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/06/2018 REFUELING OUTAGE    
River Bend 1 100        
South Texas 1 100        
South Texas 2 0 03/24/2018 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 0 03/30/2018 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours