Power Reactor Status Report for October 6, 2017
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | 150 MVAR RESTRICTION FOR TURBINE VIBRATION | |||
Peach Bottom 3 | 84 | COASTDOWN TO REFUELING OUTAGE | |||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 0 | 09/18/2017 | REFUELING OUTAGE | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 09/23/2017 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | * | |
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 09/09/2017 | REFUELING OUTAGE | ||
Oconee 1 | 100 | ||||
Oconee 2 | 97 | COASTDOWN TO REFUELING OUTAGE | * | ||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 0 | 10/01/2017 | MAINTENANCE OUTAGE | ||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 10/03/2017 | REFUELING OUTAGE | ||
Vogtle 1 | 100 | ||||
Vogtle 2 | 97 | INCREASING POWER TO 100% | * | ||
Watts Bar 1 | 100 | ||||
Watts Bar 2 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 0 | 10/01/2017 | REFUELING OUTAGE | ||
Clinton | 98 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 0 | 09/12/2017 | REFUELING OUTAGE | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 87 | COASTDOWN TO REFUELING OUTAGE | |||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | ||||
LaSalle 1 | 100 | ||||
LaSalle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 87 | COASTDOWN TO REFUELING OUTAGE - 358 kV LINE #111 AND 345 kV LINE #6832 OOS | * | ||
Point Beach 2 | 100 | 358 kV LINE #111 AND 345 kV LINE #6832 OOS | |||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 95 | COASTDOWN TO REFUELING OUTAGE | |||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 94 | COASTDOWN TO REFUELING OUTAGE | |||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Grand Gulf 1 | 58 | WILL INCREASE POWER SHORTLY TO 75% FOLLOWING TROUBLESHOOT OF DIGITAL FEED CONTROL SYSTEM | * | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 99 | FLOW LIMITED | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |