Power Reactor Status Report for March 10, 2017

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 97   PRE-OUTAGE TESTING *  
Indian Point 3 100   138 kV FEEDER 96951 OOS    
Limerick 1 100        
Limerick 2 98   COASTDOWN TO REFUELING OUTAGE    
Millstone 2 100        
Millstone 3 93   HEATER DRAIN PUMP MAINTENANCE *  
Nine Mile Point 1 76   COASTDOWN TO REFUELING OUTAGE *  
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   LIMITED TO 25 MVAR DUE TO TURBINE VIBRATION    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 0 03/03/2017 REFUELING OUTAGE    
Three Mile Island 1 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 0 02/24/2017 REFUELING OUTAGE    
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 84   COASTDOWN TO REFUELING OUTAGE    
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 97   SRV LEAKAGE    
Hatch 2 100        
McGuire 1 100        
McGuire 2 46   HOLD FOR WATER PROCESSING *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 02/24/2017 REFUELING OUTAGE    
Saint Lucie 1 100        
Saint Lucie 2 0 02/19/2017 REFUELING OUTAGE *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        
Watts Bar 2 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 02/26/2017 REFUELING OUTAGE    
Byron 2 100        
Clinton 87   100% ELECTRICAL CAPABILITY REDUCED POWER FOR ROD PATTERN ADJUSTMENT AND VALVE TESTING *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 99        
LaSalle 1 100        
LaSalle 2 57   PLANT STARTUP IN PROGRESS *  
Monticello 99        
Palisades 100        
Perry 1 0 03/04/2017 REFUELING OUTAGE    
Point Beach 1 100        
Point Beach 2 96   COASTDOWN TO REFUELING OUTAGE *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 82   COASTDOWN TO REFUELING OUTAGE *  
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 49   TROUBLESHOOTING FEEDWATER HEATER TUBE LEAK    
Callaway 90   CONDENSATE PUMP TRIP - REDUCED POWER FOR SECONDARY PLANT CONSIDERATIONS    
Columbia Generating Station 99   COASTDOWN TO REFUELING OUTAGE    
Comanche Peak 1 100     *  
Comanche Peak 2 100     *  
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Grand Gulf 1 100     *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 11   PLANT STARTUP IN PROGRESS *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021