Power Reactor Status Report for May 3, 2014
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 0 | 04/18/2014 | DEFUELED | ||
Calvert Cliffs 1 | 4 | INCREASING POWER | * | ||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 0 | 04/27/2014 | REFUELING OUTAGE | ||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | * | |||
Indian Point 3 | 100 | * | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | * | |||
Millstone 2 | 0 | 04/05/2014 | DEFUELED | ||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | * | |||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 0 | 04/12/2014 | REFUELING OUTAGE | * | |
Seabrook 1 | 100 | ||||
Susquehanna 1 | 0 | 04/12/2014 | REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION | * | |
Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 04/14/2014 | DEFUELED | ||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 81 | COASTDOWN TO REFUELING OUTAGE | |||
Summer | 0 | 04/04/2014 | DEFUELED | ||
Surry 1 | 100 | ||||
Surry 2 | 0 | 04/20/2014 | DEFUELED | ||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 30 | INCREASING POWER | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 0 | 05/02/2014 | REFUELING OUTAGE | * | |
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 98 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 01/31/2014 | REFUELING OUTAGE | ||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 98 | HOLDING POWER FOR POWER UPRATE TESTING | |||
La Salle 1 | 100 | ||||
La Salle 2 | 0 | 04/27/2014 | MAINTENANCE OUTAGE | ||
Monticello | 89 | ENGINEERING HOLD FOR EPU TESTING | |||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | * | |||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 0 | 03/31/2014 | REFUELING OUTAGE |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 72 | HOLDING POWER | |||
Arkansas Nuclear 2 | 0 | 04/27/2014 | AUTOMATIC REACTOR TRIP DUE TO AUXILIARY TRIP ON CORE PROTECTION CALCULATOR - SEE EN #50063 | ||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 85 | INCREASING POWER AFTER ROD PATTERN ADJUSTMENT | * | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 0 | 04/04/2014 | PERFORMING LOW POWER PHYSICS TESTING | * | |
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
South Texas 1 | 0 | 03/15/2014 | REFUELING OUTAGE | ||
South Texas 2 | 100 | ||||
Waterford 3 | 0 | 04/12/2014 | REFUELING OUTAGE | * | |
Wolf Creek 1 | 0 | 03/07/2014 | MAINTENANCE OUTAGE |