Power Reactor Status Report for December 7, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | 138 KV FEEDER (LINE 33332) OOS | |||
Indian Point 3 | 100 | 138 KV FEEDER (LINE 33332LM) OOS | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 98 | HOLDING FOR TURBINE BYPASS VALVE MAINTENANCE | * | ||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 99 | ||||
Susquehanna 2 | 99 | ||||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 89 | INCREASING POWER | * | ||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 0 | 11/24/2012 | REFUELING OUTAGE | ||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONT. TENSIONING ON HOLD | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | * | |||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 91 | HOLDING POWER AT 92% FOR TESTING | * | ||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 0 | 10/14/2012 | DEFUELED | ||
Summer | 2 | PLANT STARTUP IN PROGRESS | * | ||
Surry 1 | 100 | ||||
Surry 2 | 100 | * | |||
Turkey Point 3 | 95 | REDUCED POWER FOR CONTROL VALVE TUNING | * | ||
Turkey Point 4 | 0 | 11/04/2012 | DEFUELED - REFUELING OUTAGE | ||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 66 | INCREASING POWER | * | ||
Duane Arnold | 0 | 12/01/2012 | STARTUP IN PROGRESS | * | |
Fermi 2 | 0 | 11/07/2012 | FORCED OUTAGE - SEE EN #48487 | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 99 | * | |||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 0 | 10/22/2012 | CORE RE-LOAD COMPLETED | * | |
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 85 | REDUCED FOR ROD ADJUSTMENT | * | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | DEFUELED - REFUELING OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
San Onofre 3 | 0 | 01/31/2012 | DEFUELED - FORCED OUTAGE - S/G REPAIR | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 0 | 10/17/2012 | DEFUELED - REFUELING OUTAGE | ||
Wolf Creek 1 | 100 |