The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for December 4, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Beaver Valley 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| FitzPatrick | 100 | * | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | HIGH VOLTAGE SYSTEM WARNING | * | ||
| Indian Point 2 | 100 | 138 KV FEEDER (LINE 33332) OOS | |||
| Indian Point 3 | 100 | 138 KV FEEDER (LINE 33332LM) OOS | |||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 37 | INCREASING POWER AND MONITORING TURBINE VIBRATION | * | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 74 | INCREASING POWER VOLTAGE REGULATOR TESTING | * | ||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Susquehanna 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 17 | TURBINE TESTING | * | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 0 | 11/24/2012 | REFUELING OUTAGE | ||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONT. TENSIONING ON HOLD | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | * | |||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 45 | GOVERNOR VALVE ISSUES | * | ||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 84 | HOLDING POWER - HTR DRAIN PUMP MAINTENANCE S/G SODIUM ISSUES | * | ||
| Sequoyah 1 | 100 | GRID YELLOW FOR SCHEDULED SWYD MAINTENANCE | |||
| Sequoyah 2 | 0 | 10/14/2012 | DEFUELED GRID YELLOW FOR SCHEDULED SWYD MAINTENANCE | ||
| Summer | 0 | 10/12/2012 | EXITING REFUELING OUTAGE | ||
| Surry 1 | 100 | ||||
| Surry 2 | 38 | RESCALING NUCLEAR INSTRUMENTATION | * | ||
| Turkey Point 3 | 99 | INCREASING POWER | * | ||
| Turkey Point 4 | 0 | 11/04/2012 | DEFUELED - REFUELING OUTAGE | ||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 1 | STARTUP IN PROGRESS | * | ||
| Duane Arnold | 0 | 12/01/2012 | GENERATOR FIELD GROUND ISSUE | * | |
| Fermi 2 | 0 | 11/07/2012 | FORCED OUTAGE - SEE EN #48487 | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 93 | INCREASING POWER | * | ||
| Prairie Island 1 | 0 | 10/22/2012 | DEFUELED - REFUELING OUTAGE | ||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 90 | HOLD - CONDENSER AIR INLEAKAGE | |||
| Diablo Canyon 1 | 50 | CONDENSER TUBE CLEANING | |||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/09/2011 | DEFUELED - REFUELING OUTAGE | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
| San Onofre 3 | 0 | 01/31/2012 | DEFUELED - FORCED OUTAGE - S/G REPAIR | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 10/17/2012 | DEFUELED - REFUELING OUTAGE | ||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026