The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for November 1, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 0 | 09/23/2012 | PREPARING FOR START-UP | * | |
| Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE ALERT IN EFFECT | |||
| Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ALERT IN EFFECT | |||
| FitzPatrick | 100 | ||||
| Ginna | 0 | 10/21/2012 | REFUELING OUTAGE | ||
| Hope Creek 1 | 100 | HIGH SYSTEM VOLTAGE ALERT IN EFFECT | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 0 | 10/29/2012 | FORCED OUTAGE - MAKING PREPARATIONS FOR STARTUP | ||
| Limerick 1 | 100 | ||||
| Limerick 2 | 96 | POWER REDUCED DUE TO XENON BUILD-IN | * | ||
| Millstone 2 | 0 | 10/06/2012 | DEFUELED | ||
| Millstone 3 | 95 | INCREASING POWER | * | ||
| Nine Mile Point 1 | 0 | 10/29/2012 | FORCED OUTAGE - REACTOR TRIP ON LOAD REJECT - SEE EN #48453 | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 0 | 10/21/2012 | REFUELING OUTAGE | * | |
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 0 | 10/29/2012 | FORCED OUTAGE - REACTOR TRIP ON LOSS OF CONDENSER VACUUM - SEE EN #48457 | ||
| Salem 2 | 0 | 10/14/2012 | DEFUELED | ||
| Seabrook 1 | 58 | INCREASING POWER TO 100% | * | ||
| Susquehanna 1 | 0 | 10/20/2012 | TURBINE BLADE INSPECTION - HIGH SYSTEM VOLTAGE ACTION - MINIMUM GENERATION ALERT | ||
| Susquehanna 2 | 71 | HOLDING POWER - HIGH SYSTEM VOLTAGE ACTION - MINIMUM GENERATION ALERT | |||
| Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Vermont Yankee | 100 | MINIMUM GENERATION ALERT |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 10/19/2012 | REFUELING OUTAGE | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONT.TENSIONING ON HOLD | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 09/15/2012 | REFUELING OUTAGE | ||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 10/26/2012 | REFUELING OUTAGE | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 0 | 08/05/2012 | REFUELING OUTAGE, 240 LBS IN RCS | ||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 0 | 10/14/2012 | DEFUELED | ||
| Summer | 0 | 10/12/2012 | DEFUELED | ||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 10/31/2012 | REFUELING OUTAGE | * | |
| Turkey Point 3 | 88 | HOLDING POWER FOR EPU TESTING | |||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 73 | 5 HOUR HOLD BEFORE RESUMING POWER ASCENSION | * |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 0 | 10/15/2012 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 55 | FEED PUMP DAMAGE | * | ||
| D.C. Cook 2 | 100 | * | |||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Duane Arnold | 0 | 10/05/2012 | REFUELING OUTAGE | ||
| Fermi 2 | 68 | POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 99 | REDUCED POWER FOR PLANNED MAINTENANCE | * | ||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 0 | 10/31/2012 | REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS | * | |
| Prairie Island 1 | 0 | 10/22/2012 | REFUELING OUTAGE - UE DECLARED DUE TO SECURITY CONDITION - SEE EVENT #48464 | * | |
| Prairie Island 2 | 100 | UE DECLARED DUE TO SECURITY CONDITION - SEE EVENT #48464 | * | ||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 0 | 10/06/2012 | REFUELING OUTAGE - PREPARING FOR STARTUP | * | |
| Cooper | 0 | 10/13/2012 | REFUELING OUTAGE | ||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/09/2011 | DEFUELED | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | RESTRICTIONS ON GRID VOLTAGE | |||
| Palo Verde 2 | 0 | 10/05/2012 | RESTRICTIONS ON GRID VOLTAGE | ||
| Palo Verde 3 | 1 | STARTUP IN PROGRESS - RESTRICTIONS ON GRID VOLTAGE | * | ||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
| San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR - DEFUELED | ||
| South Texas 1 | 0 | 10/20/2012 | REFUELING OUTAGE | ||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 10/17/2012 | DEFUELED | ||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026