Skip to main content

Power Reactor Status Report for October 10, 2012

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 0 2012-09-23 REFUELING OUTAGE
Calvert Cliffs 1 100 HIGH SYSTEM VOLTAGE
Calvert Cliffs 2 100 HIGH SYSTEM VOLTAGE
FitzPatrick 0 2012-09-16 REFUELING OUTAGE RV REASSEMBLY ONGOING
Ginna 100
Hope Creek 1 100
Indian Point 2 100 138 KV FEEDER RESTRICTIONS
Indian Point 3 100 138 kV FEEDER RESTRICTIONS
Limerick 1 100
Limerick 2 100
Millstone 2 0 2012-10-06 REFUELING OUTAGE
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 0 2012-09-09 LOADING FUEL
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 100
Salem 2 100
Seabrook 1 0 2012-09-14 REFUELING OUTAGE
Susquehanna 1 75 TURBINE BLADE ISSUES- HIGH SYSTEM VOLTAGE ACTION
Susquehanna 2 75 TURBINE BLADE ISSUES- HIGH SYSTEM VOLTAGE ACTION
Three Mile Island 1 100 HIGH SYSTEM VOLTAGE ACTION
Vermont Yankee 94 REDUCED POWER FOR ON-GOING LINE WORK *

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 69 INCREASING POWER *
Catawba 1 100
Catawba 2 100
Crystal River 3 0 2009-09-25 DEFUELED - CONTAINMENT TENSIONING ON HOLD
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 100
McGuire 2 0 2012-09-15 DEFUELED
North Anna 1 100
North Anna 2 0 2012-10-08 MAINTENANCE OUTAGE- UNIT OFF-LINE FOR RCP SEAL REPAIR
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 0 2012-08-05 DEFUELED
Sequoyah 1 100
Sequoyah 2 100
Summer 85 TESTING SECONDARY SAFETY VALVES *
Surry 1 100
Surry 2 100
Turkey Point 3 29 30% PWR HOLD FOR SECONDARY CHEMISTRY *
Turkey Point 4 100
Vogtle 1 0 2012-09-16 REPAIRING MSIV *
Vogtle 2 100
Watts Bar 1 0 2012-09-10 REFUELING OUTAGE

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 100
Braidwood 2 100
Byron 1 85 INCREASING POWER *
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 100 HIGH VOLTAGE ACTION *
D.C. Cook 2 100 HIGH VOLTAGE ACTION *
Davis-Besse 100 HIGH VOLTAGE ACTION *
Dresden 2 100
Dresden 3 94 COASTDOWN TO REFUELING OUTAGE
Duane Arnold 0 2012-10-05 REFUELING OUTAGE
Fermi 2 68 POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 100
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 2012-09-13 REFUELING OUTAGE
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 0 2012-10-06 REFUELING OUTAGE
Cooper 92 COASTDOWN TO REFUELING OUTAGE
Diablo Canyon 1 100
Diablo Canyon 2 100
Fort Calhoun 0 2011-04-09 DEFUELED
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 0 2012-10-05 REFUELING OUTAGE
Palo Verde 3 100
River Bend 1 100
San Onofre 2 0 2012-01-09 REFUELING OUTAGE
San Onofre 3 0 2012-01-31 DEFUELED, FORCED OUTAGE - S/G REPAIR -
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.