Power Reactor Status Report for June 19, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | MINIMUM GENERATION ALERT | |||
Beaver Valley 2 | 100 | MINIMUM GENERATION ALERT | |||
Calvert Cliffs 1 | 100 | MINIMUM GENERATION ALERT - HIGH SYSTEM VOLTAGE ACTION | * | ||
Calvert Cliffs 2 | 100 | MINIMUM GENERATION ALERT - HIGH SYSTEM VOLTAGE ACTION | * | ||
FitzPatrick | 95 | REDUCING POWER TO 50% FOR MAIN CONDENSER TUBE LEAK REPAIRS | * | ||
Ginna | 100 | ||||
Hope Creek 1 | 100 | MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL - HIGH SYSTEM VOLTAGE ACTION - HOT WEATHER WARNING FOR 6/19 | * | ||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 85 | INCREASING POWER AFTER EXTENDED POWER UPRATE TESTING | |||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 85 | POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT - SWITCHYARD MAINTENANCE ON-GOING UNTIL APPROX. 06/25 | |||
Susquehanna 1 | 30 | ENTERING FORCED OUTAGE TO CORRECT 1 GPM DRYWELL LEAKAGE - BREAKER OPEN AT 0600 EDT - MINIMUM GENERATION ALERT | * | ||
Susquehanna 2 | 100 | MINIMUM GENERATION ALERT | * | ||
Three Mile Island 1 | 100 | MINIMUM GENERATION ALERT - HIGH SYSTEM VOLTAGE ACTION | * | ||
Vermont Yankee | 36 | REDUCED POWER TO REPLACE MOTOR ON "A" RECIRC PUMP MG SET | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | * | |||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 94 | REDUCING POWER IN PREPARATION OF ROD IMPROVEMENT AT 0900 EDT | * | ||
Brunswick 2 | 99 | REDUCED POWER DUE TO PLANT COMPUTER ISSUES | * | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONTAINMENT TENSIONING ON HOLD | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | HOT WEATHER ALERT ON 6/19 | * | ||
Surry 2 | 100 | HOT WEATHER ALERT ON 6/19 | * | ||
Turkey Point 3 | 0 | 02/26/2012 | CORE RELOADED | * | |
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | HOT WEATHER ALERT | * | ||
Braidwood 2 | 100 | HOT WEATHER ALERT | * | ||
Byron 1 | 100 | HOT WEATHER ALERT | |||
Byron 2 | 100 | HOT WEATHER ALERT | |||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | |||
D.C. Cook 2 | 100 | HIGH SYSTEM VOLTAGE ACTION MINIMUM GENERATION ALERT | |||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | HOT WEATHER ALERT | |||
Dresden 3 | 100 | HOT WEATHER ALERT | |||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | HOT WEATHER ALERT | |||
La Salle 2 | 100 | HOT WEATHER ALERT | |||
Monticello | 100 | ||||
Palisades | 0 | 06/12/2012 | FORCED OUTAGE | ||
Perry 1 | 23 | HOLDING POWER FOR APRM TESTING | * | ||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | * | |||
Prairie Island 1 | 44 | REDUCED POWER FOR PLANNED MAINTENANCE | * | ||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | HOT WEATHER ALERT | |||
Quad Cities 2 | 100 | HOT WEATHER ALERT |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 85 | REDUCED POWER FOR ECONOMIC DISPATCH | |||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 71 | INCREASING POWER | * | ||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
Grand Gulf 1 | 15 | TURBINE OFFLINE TO REPAIR 1ST STAGE PRESSURE SENSE LINE LEAK | * | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 87 | HOLDING POWER TO TROUBLESHOOT BEARING ISSUE WITH 'B' RX FEEDPUMP | |||
San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021