The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for May 7, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 0 | 04/08/2012 | EXITING REFUELING OUTAGE HIGH SYSTEM VOLTAGE ALERT | * | |
| Beaver Valley 2 | 100 | HIGH SYSTEM VOLTAGE ALERT | * | ||
| Calvert Cliffs 1 | 100 | HIGH SYSTEM VOLTAGE ALERT | |||
| Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ALERT | |||
| FitzPatrick | 100 | MAY BE REQUESTED TO LOWER POWER FOR HIGH GRID VOLTAGE | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 0 | 04/13/2012 | REFUELING OUTAGE HIGH SYSTEM VOLTAGE ACTION | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 0 | 04/08/2012 | REFUELING OUTAGE | ||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 70 | ROD PATTERN ADJUSTMENT PLANNED LOAD DROP FOR WATERBOX INSPECTION AND FAILED TURBINE CONTROL VALVE INVESTIGATION | * | ||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 18 | HOLDING IN ORDER TO SYNCH TO GRID | * | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 85 | POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT | |||
| Susquehanna 1 | 0 | 03/31/2012 | REFUELING OUTAGE HIGH VOLTAGE SYSTEM ACTION | ||
| Susquehanna 2 | 100 | HIGH VOLTAGE SYSTEM ACTION | |||
| Three Mile Island 1 | 100 | HIGH VOLTAGE SYSTEM ACTION | |||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 0 | 04/07/2012 | REFUELING OUTAGE | ||
| Brunswick 1 | 100 | * | |||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONTAINMENT TENSIONING ON HOLD | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 0 | 04/20/2012 | DEFUELED | ||
| Hatch 1 | 100 | ||||
| Hatch 2 | 0 | 05/04/2012 | FORCED OUTAGE | * | |
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 98 | INCREASING POWER | |||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 0 | 04/13/2012 | DEFUELED | * | |
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 29 | SECONDARY CHEMISTRY HOLD | * | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 0 | 05/05/2012 | REFUELING OUTAGE | * | |
| Surry 2 | 100 | ||||
| Turkey Point 3 | 0 | 02/26/2012 | DEFUELED | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 0 | 04/15/2012 | DEFUELED | ||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | SLIGHTLY REDUCED POWER FOR FEED FLOW INSTRUMENTATION INVESTIGATION | * | ||
| Byron 2 | 100 | SLIGHTLY REDUCED POWER FOR FEED FLOW INSTRUMENTATION INVESTIGATION | |||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| D.C. Cook 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | |||
| Davis-Besse | 0 | 05/05/2012 | REFUELING OUTAGE | * | |
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 99 | CONTROL ROD SEQUENCE EXCHANGE | |||
| Fermi 2 | 35 | INCREASING POWER | * | ||
| Kewaunee | 0 | 04/05/2012 | REFUELING OUTAGE HEATING UP | * | |
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 0 | 04/08/2012 | REFUELING OUTAGE | ||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 0 | 02/21/2012 | REFUELING OUTAGE | ||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 85 | LOAD FOLLOWING EXCESS HYDRO POWER | |||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 0 | 04/22/2012 | DEFUELED - CORE OFFLOADED | ||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
| Grand Gulf 1 | 0 | 02/19/2012 | REFUELING OUTAGE | ||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 0 | 05/03/2012 | SHUTDOWN FOR #3 TURBINE CONTROL VALVE CLOSURE REPAIR | ||
| San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
| San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026