Power Reactor Status Report for March 31, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 0 | 02/05/2012 | REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION | * | |
| Calvert Cliffs 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 99 | COASTDOWN TO REFUELING OUTAGE - HIGH SYSTEM VOLTAGE ACTION | * | ||
| Indian Point 2 | 6 | HOLDING POWER FOR TURBINE TESTING - ANTICIPATE GENERATOR ONLINE AT 0700 EDT | * | ||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 85 | HOLDING POWER BASED ON GENERATOR STATOR COOLING DELTA T LIMIT. | * | ||
| Susquehanna 1 | 1 | ENTERING REFUELING OUTAGE - SHUTDOWN IN PROGRESS - REACTOR CRITICAL IN THE INTERMEDIATE RANGE NI - HIGH SYSTEM VOLTAGE ACTION | * | ||
| Susquehanna 2 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| Three Mile Island 1 | 100 | HIGH SYSTEM VOLTAGE ACTION | * | ||
| Vermont Yankee | 99 | INCREASING POWER TO 100% | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 95 | COASTDOWN TO REFUELING OUTAGE | |||
| Brunswick 1 | 0 | 02/23/2012 | REFUELING OUTAGE | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 0 | 03/10/2012 | LOADING FUEL | ||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONTAINMENT TENSIONING ON HOLD | ||
| Farley 1 | 79 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 03/10/2012 | REFUELING OUTAGE | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Robinson 2 | 5 | STARTUP IN PROGRESS - GENERATOR OFFLINE | * | ||
| Saint Lucie 1 | 0 | 03/30/2012 | MANUAL RX TRIP DUE TO AN UNCONTROLLED COOLDOWN - SEE EN #47793 | * | 1 |
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 1 | REACTOR CRITICAL IN THE INTERMEDIATE RANGE NI - HOLDING POWER FOR PHYSICS TESTING | * | ||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 0 | 02/26/2012 | DEFUELED | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | FEEDFLOW INSTRUMENT LIMITED | |||
| Byron 2 | 100 | FEED WATER FLOW INVESTIGATION | |||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | HIGH SYSTEM VOLTAGE ALERT IN EFFECT | |||
| D.C. Cook 2 | 0 | 03/21/2012 | REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 0 | 03/25/2012 | REFUELING OUTAGE | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 60 | COOLING TOWER REPLACEMENT | |||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 0 | 02/21/2012 | DEFUELED | ||
| Quad Cities 1 | 100 | MONITORING TURBINE VIBRATION | * | ||
| Quad Cities 2 | 0 | REFUELING OUTAGE |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 85 | ECONOMIC DISPATCH | * | ||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | MORRO BAY MIDWAY #1 230 KV LINE OOS FOR MAINTENANCE | |||
| Diablo Canyon 2 | 93 | WORK ON REHEATER STEAM SUPPLY VALVES MORRO BAY MIDWAY #1 230 KV LINE OOS FOR MAINTENANCE | * | ||
| Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | ||
| Grand Gulf 1 | 0 | 02/19/2012 | REFUELING OUTAGE | ||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 0 | 03/16/2012 | DEFUELED | ||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | ||
| San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE | ||
| South Texas 1 | 75 | INCREASING POWER | * | ||
| South Texas 2 | 0 | 11/28/2011 | MAINTENANCE OUTAGE | ||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |