Power Reactor Status Report for April 4, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 98   COASTDOWN TO REFUELING OUTAGE *  
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 96   COASTDOWN TO REFUELING OUTAGE    
Indian Point 2 0 04/03/2009 MANUAL RX TRIP. SEE EN# 44967 * 1
Indian Point 3 0 03/10/2009 REFUELING OUTAGE    
Limerick 1 100        
Limerick 2 0 03/22/2009 REFUELING OUTAGE    
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 0 03/20/2009 REFUELING OUTAGE    
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 97     *  
Pilgrim 1 98   COASTDOWN TO REFUELING OUTAGE *  
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 88   COASTDOWN TO REFUELING OUTAGE *  
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   ONE 500 KV LINE (UNION) OOS    
Browns Ferry 2 100   ONE 500 KV LINE (UNION) OOS    
Browns Ferry 3 75   ONE 500 KV LINE (UNION) OOS REDUCED POWER FOR SCHEDULED MAINTENANCE *  
Brunswick 1 100        
Brunswick 2 0 02/27/2009 REFUELING OUTAGE    
Catawba 1 100        
Catawba 2 0 03/06/2009 DEFUELED    
Crystal River 3 100        
Farley 1 0 04/02/2009 REFUELING OUTAGE    
Farley 2 92   ENGINEERING HOLD *  
Harris 1 97   COASTDOWN TO REFUELING OUTAGE    
Hatch 1 87   REDUCED POWER FOR ROD PATTERN ADJUSTMENT *  
Hatch 2 0 02/08/2009 REFUELING OUTAGE    
McGuire 1 100        
McGuire 2 100        
North Anna 1 96   ENGINEERING HOLD *  
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 2   TURBINE OFFLINE FOR SCHEDULED MAINTENANCE OUTAGE *  
Saint Lucie 1 100        
Saint Lucie 2 70   INCREASING POWER *  
Sequoyah 1 0 03/26/2009 REFUELING OUTAGE    
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 0 03/15/2009 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 0 03/29/2009 REFUELING OUTAGE    
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 03/02/2009 SEE EN #44507.    
D.C. Cook 2 0 03/24/2009 REFUELING OUTAGE DEFUELED *  
Davis-Besse 70   COMMENCING MID-CYCLE OUTAGE *  
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 0 04/02/2009 STARTUP IN PROGRESS *  
Fermi 2 0 03/27/2009 REFUELING OUTAGE. THE 120KV FERMI-SHOAL LINE IS OOS FOR MAINTENANCE    
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 0 03/14/2009 REFUELING OUTAGE    
Palisades 0 03/22/2009 REFUELING OUTAGE    
Perry 1 0 02/22/2009 FUEL MOVEMENT IN PROGRESS    
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 98   100% ELECTRICAL CAPABILITY *  
Quad Cities 2 96   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 98   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/03/2009 REFUELING OUTAGE *  
River Bend 1 100        
San Onofre 2 98   S/G PRESSURE LIMITATION    
San Onofre 3 95   TURBINE STOP VALVE MAINTENANCE *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021