Skip to main content

Power Reactor Status Report for March 29, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 100
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 98 COASTDOWN TO REFUELING OUTAGE
Indian Point 2 100
Indian Point 3 0 2009-03-10 DEFUELED
Limerick 1 100
Limerick 2 0 2009-03-22 REFUELING OUTAGE
Millstone 2 100
Millstone 3 100
Nine Mile Point 1 0 2009-03-20 REFUELING OUTAGE
Nine Mile Point 2 100
Oyster Creek 100
Peach Bottom 2 100
Peach Bottom 3 100
Pilgrim 1 100
Salem 1 28 DUE TO SECONDARY CHEMISTRY IN STEAM GENERATORS. CURRENTLY SAMPLING. WHEN IN LIMITS WILL CONTINUE WITH POWER ASCENSION. *
Salem 2 100
Seabrook 1 100
Susquehanna 1 94 100% ELECTRICAL CAPABILITY
Susquehanna 2 91 COASTDOWN TO REFUELING OUTAGE
Three Mile Island 1 100
Vermont Yankee 100

Region 2

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100 *
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 0 2009-02-27 REFUELING OUTAGE
Catawba 1 100
Catawba 2 0 2009-03-06 DEFUELED
Crystal River 3 100
Farley 1 94 COASTDOWN TO REFUELING OUTAGE *
Farley 2 0 2009-03-22 SODIUM LEVELS ARE HIGH IN SECONDARY WATER
Harris 1 100
Hatch 1 100
Hatch 2 0 2009-02-08 REFUELING OUTAGE
McGuire 1 100
McGuire 2 100
North Anna 1 0 2009-03-07 REFUELING OUTAGE
North Anna 2 100
Oconee 1 100
Oconee 2 90 INCREASING POWER *
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100 *
Sequoyah 1 0 2009-03-26 REFUELING OUTAGE *
Sequoyah 2 5 INCREASING POWER *
Summer 100
Surry 1 100
Surry 2 100
Turkey Point 3 0 2009-03-15 DEFUELED
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 100

Region 3

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Braidwood 1 98 COASTDOWN TO REFUELING OUTAGE *
Braidwood 2 100
Byron 1 100
Byron 2 100
Clinton 97 100% ELECTRICAL CAPABILITY
D.C. Cook 1 0 2009-03-02 SEE EN #44507.
D.C. Cook 2 0 2009-03-24 REFUELING OUTAGE
Davis-Besse 100
Dresden 2 98 100% ELECTRICAL CAPABILITY *
Dresden 3 99 100% ELECTRICAL CAPABILITY
Duane Arnold 100
Fermi 2 0 2009-03-27 REACTOR SCRAM DUE TO HIGH TURBINE VIBRATION SEE EN #44942 REFUELING OUTAGE *
Kewaunee 100
La Salle 1 100
La Salle 2 100
Monticello 0 2009-03-14 REFUELING OUTAGE
Palisades 0 2009-03-22 REFUELING OUTAGE
Perry 1 0 2009-02-22 DEFUELED
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 97 100% ELECTRICAL CAPABILITY
Quad Cities 2 96 100% ELECTRICAL CAPABILITY

Region 4

Unit Power Down Reason or Comment Change in Report (*) Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100
Diablo Canyon 1 50 MAIN FEEDWATER PUMP MAINTENANCE *
Diablo Canyon 2 100
Fort Calhoun 100
Grand Gulf 1 90 ROD SEQUENCE EXCHANGE *
Palo Verde 1 12 TURBINE OFFLINE FOR STATOR COOLING WATER REPAIRS
Palo Verde 2 100
Palo Verde 3 100
River Bend 1 100
San Onofre 2 98 S/G PRESSURE LIMITATION *
San Onofre 3 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 80 LOSS OF ONE 345KV LINE. *

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.