The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 6, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 0 09/14/2008 REFUELING OUTAGE    
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 97   HOLDING POWER DUE TO CONTROL VALVE LIMITATION FOR TURBINE    
Peach Bottom 2 0 09/14/2008 REFUELING OUTAGE *  
Peach Bottom 3 100        
Pilgrim 1 100   LOCAL ISO MAY REQUEST STATION TO REDUCE POWER TO 500MW ELECTRICAL NET AS A CONTINGENCY WITHIN 25 MIN. DUE TO WORK ON GRID    
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 98   COASTDOWN TO REFUELING OUTAGE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   ONE COOLING TOWER TRANSFORMER OOS - 161KV TRINITY LINE OOS    
Browns Ferry 2 0 10/04/2008 REACTOR SCRAM DUE TO MAIN GENERATOR REVERSE POWER SIGNAL (SEE EN#44540). ONE COOLING TOWER TRANSFORMER OOS - 161KV TRINITY LINE OOS    
Browns Ferry 3 100   ONE COOLING TOWER TRANSFORMER OOS - 161KV TRINITY LINE OOS    
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 94   COASTDOWN TO REFUELING OUTAGE *  
Harris 1 100        
Hatch 1 89   INCREASING FOLLOWING ROD PATTERN ADJUSTMENTS *  
Hatch 2 100        
McGuire 1 0 09/20/2008 REFUELING OUTAGE - DEFUELED    
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 09/13/2008 REFUELING OUTAGE    
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 09/25/2008 REFUELING OUTAGE    
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 0 09/14/2008 REFUELING OUTAGE - LOADING CORE *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 0 10/05/2008 REFUELING OUTAGE *  
Clinton 97   100% ELECTRICAL CAPABILITY. *  
D.C. Cook 1 0 09/20/2008 SEE EN #44507.    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 92   COASTDOWN TO REFUELING OUTAGE    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100     *  
Perry 1 100        
Point Beach 1 0 10/04/2008 REFUELING OUTAGE    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 09/19/2008 DEFUELED    
Quad Cities 1 98   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 0 09/27/2008 REFUELING OUTAGE - DEFUELED    
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 0 09/21/2008 REFUELING OUTAGE    
Palo Verde 1 0 10/04/2008 REFUELING OUTAGE    
Palo Verde 2 100        
Palo Verde 3 100     *  
River Bend 1 100        
San Onofre 2 99   100% ELECTRICAL CAPABILITY *  
San Onofre 3 75   REDUCED POWER DUE TO LP EXTRACTION STEAM VALVE BELLOWS LEAK AND CONDENSER TUBE LEAK.    
South Texas 1 100        
South Texas 2 0 10/04/2008 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021