Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 0 | 04/14/2008 | REFUELING OUTAGE | ||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Hope Creek 1 | 100 | 500 KV LINE #5021 OOS | |||
| Indian Point 2 | 8 | HOLDING POWER TO RESOLVE RELAY ISSUE - GENERATOR OFFLINE | * | ||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 0 | 04/05/2008 | DEFUELED | ||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 81 | STARTUP TESTING IN PROGRESS | * | ||
| Oyster Creek | 92 | HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES | |||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | 500 KV LINE OOS FOR MAINTENANCE | |||
| Salem 2 | 0 | 03/11/2008 | DEFUELED - 500 KV LINE OOS FOR MAINTENANCE | ||
| Seabrook 1 | 0 | 03/31/2008 | 345 KV (BUS 2) OOS - EXPECT RETURN TO SERVICE ON 4/20 | * | |
| Susquehanna 1 | 72 | HOLDING POWER FOR TESTING | * | ||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | MINIMUM GENERATION ALERT FROM PJM - NO IMPACT ON PLANT | * | ||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 69 | REDUCED POWER FOR SCRAM TIME TESTING AND SCHEDULED MAINTENANCE | * | ||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 0 | 03/18/2008 | REFUELING OUTAGE | ||
| Brunswick 1 | 0 | 03/14/2008 | REFUELING OUTAGE | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 97 | INCREASING POWER AT 1%/4-HOURS | * | ||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 95 | HOLDING POWER FOR TESTING | * | ||
| North Anna 1 | 100 | PLAN TO REMOVE "A" RESERVE STATION TRANSFORMER FROM SERVICE IN THE NEXT 72 HOURS | * | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 04/11/2008 | REFUELING OUTAGE - DEFUELING IN PROGRESS | * | |
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Summer | 100 | * | |||
| Surry 1 | 0 | 04/16/2008 | MAINTENANCE OUTAGE - FEEDWATER HEATER REPAIRS COMPLETED | * | |
| Surry 2 | 96 | COASTDOWN TO REFUELING | * | ||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 0 | 03/30/2008 | DEFUELED | ||
| Vogtle 1 | 0 | 03/15/2008 | REFUELING OUTAGE | ||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY. | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 92 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Byron 1 | 95 | HOLDING POWER FOR PRECONDITIONING | * | ||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 0 | 03/25/2008 | REFUELING OUTAGE | * | |
| D.C. Cook 2 | 100 | * | |||
| Davis-Besse | 100 | ||||
| Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 98 | TESTING HP CONTROL VALVES | * | ||
| Kewaunee | 0 | 03/28/2008 | DEFUELED | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | * | |||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/22 | * | ||
| Point Beach 2 | 0 | 04/05/2008 | DEFUELED - TRANSFORMERS 2X03 & 2X04 OOS - GRID VOLTAGE IS EXPECTED TO DIP WHEN KEWAUNEE ENERGIZES NEW TRANSFORMER ON 04/22 | * | |
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 27 | HOLDING FOR FLUX MAPPING | * | ||
| Cooper | 0 | 04/11/2008 | REFUELING OUTAGE | ||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/19/2008 | COMMENCING REFUELING OUTAGE | * | |
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 03/28/2008 | DEFUELED | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | ||||
| San Onofre 3 | 0 | 04/16/2008 | PLANNED SHUTDOWN IN ORDER TO CONSERVE FUEL FOR SUMMER LOADS - WILL MAINTAIN UNIT IN MODE 3 (HOT STANDBY) | ||
| South Texas 1 | 0 | 03/29/2008 | REFUELING OUTAGE | ||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 03/17/2008 | REFUELING OUTAGE |