Power Reactor Status Report for February 27, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 82 | REDUCED POWER FOR SCHEDULED MAINTENANCE | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 0 | 02/22/2008 | REFUELING OUTAGE | ||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | SWITCHYARD WORK ON LINE 310 | |||
Millstone 3 | 100 | SWITCHYARD WORK ON LINE 310 | |||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 92 | TURBINE VALVE ISSUES AND FW HEATER OOS | * | ||
Peach Bottom 2 | 100 | #3 STARTUP SOURCE WILL BE OOS THRU 3/1/08. | |||
Peach Bottom 3 | 100 | #3 STARTUP SOURCE WILL BE OOS THRU 3/1/08. | |||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Seabrook 1 | 100 | * | |||
Susquehanna 1 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | 500 KV UNION LINE OOS | |||
Browns Ferry 2 | 100 | 500 KV UNION LINE OOS | |||
Browns Ferry 3 | 100 | 500 KV UNION LINE OOS | |||
Brunswick 1 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 0 | 02/03/2008 | REFUELING OUTAGE | ||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 0 | 02/26/2008 | TRIP SEE EN #44009 | * | 1 |
Turkey Point 4 | 0 | 02/26/2008 | TRIP SEE EN #44009; STARTUP PREPS IN PROGRESS | * | 1 |
Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY TG VOLTAGE REGULATOR IN MANUAL | |||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 0 | 02/10/2008 | DEFUELED |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY. | |||
Fermi 2 | 100 | 120KV SHOAL LINE (1 0F 3) OOS FROM 0700 2/27 THRU 1600 2/28 - BROWNSTOWN-WAYNE 2 LINE (1 OF 3) OOS THRU 3/7 | * | ||
Kewaunee | 100 | ||||
La Salle 1 | 0 | 02/03/2008 | REFUELING OUTAGE - ANTICIPATED MODE CHANGE ON 2/27 | * | |
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | FRONT BUS WILL BE OOS FOR MAINTENANCE ON 3/3 | * | ||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 0 | 02/12/2008 | DEFUELED | ||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL OUTPUT | |||
Quad Cities 2 | 91 | COASTDOWN TO REFUELING OUTAGE | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | * | |||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 97 | COASTDOWN TO REFUELING OUTAGE | |||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 0 | 02/03/2008 | DEFUELED | ||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 1 | PERFORMING PLANT STARTUP AFTER MAINTENANCE OUTAGE - HOLDING POWER TO RESOLVE SEVERAL STARTUP PROBLEMS | * | ||
Palo Verde 1 | 100 | MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1 | |||
Palo Verde 2 | 100 | MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1 | |||
Palo Verde 3 | 100 | MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1 | |||
River Bend 1 | 0 | 01/06/2008 | REFUELING OUTAGE | ||
San Onofre 2 | 99 | * | |||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021