Power Reactor Status Report for February 25, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 84 | WATER BOX CLEANING | |||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 89 | COASTDOWN TO REFUELING OUTAGE | * | ||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | COASTDOWN TO REFUELING OUTAGE | |||
| Millstone 2 | 100 | 0600 EST ON 02/24/07 SCHEDULED 383 LINE - 345KV OUTAGE. | |||
| Millstone 3 | 100 | 0600 EST ON 02/24/07 SCHEDULED 383 LINE - 345KV OUTAGE. | |||
| Nine Mile Point 1 | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 91 | COASTDOWN TO REFUELING OUTAGE | |||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 75 | ROD SEQUENCE EXCHANGE | * | ||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | CORE LOADED CAVITY FLOODED 500 KV (MADISON) LINE OOS | ||
| Browns Ferry 2 | 0 | 02/20/2007 | REFUELING OUTAGE 500 KV (MADISON) LINE OOS | ||
| Browns Ferry 3 | 100 | 500 KV (MADISON) LINE OOS | |||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 75 | HOLDING POWER FOR PLANNED MAINTENANCE | * | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 0 | 02/05/2007 | REFUELING OUTAGE | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | * | |||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 90 | TURBINE VALVE TESTING IN PROGRESS. 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. | * | ||
| Dresden 3 | 85 | HOLDING POWER FOR WELD REPAIR OF RFP "A" . 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. | * | ||
| Duane Arnold | 0 | 02/04/2007 | REFUELING OUTAGE. 4 OF 6 POWER LINES DOWN DUE TO ICING. HAVE 2 161 KV LINES FEEDING THE EAST BUS AND THE WEST BUS. | * | |
| Fermi 2 | 100 | EDG # 11 IS OSS FOR PLANNED MAINTENANCE. STILL HAVE EDGs #12, # 13, & # 14 FULLY OPERABLE IF NEEDED. ONLY NEED TWO TO SUPPORT VITAL BUSSES. | * | ||
| Kewaunee | 100 | FEED FLOW MEASURING INSTRUMENT CALIBRATION ISSUE | |||
| La Salle 1 | 100 | ||||
| La Salle 2 | 87 | COASTDOWN TO REFUELING OUTAGE. | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | * | |||
| Point Beach 1 | 95 | INCREASING POWER AFTER COMPLETING PLANNED TESTING | * | ||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
| Prairie Island 2 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
| Quad Cities 1 | 85 | REDUCED POWER FOR SCRAM TIME TESTING AND ROD SHUFFLE | * | ||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 0 | 02/24/2007 | REFUELING OUTAGE | * | |
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 02/19/2007 | SEE EN #43173 | ||
| Palo Verde 3 | 99 | * | |||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | * | |||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021