The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 25, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 84   WATER BOX CLEANING    
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 89   COASTDOWN TO REFUELING OUTAGE *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100   COASTDOWN TO REFUELING OUTAGE    
Millstone 2 100   0600 EST ON 02/24/07 SCHEDULED 383 LINE - 345KV OUTAGE.    
Millstone 3 100   0600 EST ON 02/24/07 SCHEDULED 383 LINE - 345KV OUTAGE.    
Nine Mile Point 1 90   COASTDOWN TO REFUELING OUTAGE *  
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 91   COASTDOWN TO REFUELING OUTAGE    
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 75   ROD SEQUENCE EXCHANGE *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 CORE LOADED CAVITY FLOODED 500 KV (MADISON) LINE OOS    
Browns Ferry 2 0 02/20/2007 REFUELING OUTAGE 500 KV (MADISON) LINE OOS    
Browns Ferry 3 100   500 KV (MADISON) LINE OOS    
Brunswick 1 100        
Brunswick 2 99   COASTDOWN TO REFUELING OUTAGE    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 75   HOLDING POWER FOR PLANNED MAINTENANCE *  
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 0 02/05/2007 REFUELING OUTAGE    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100     *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY    
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 90   TURBINE VALVE TESTING IN PROGRESS. 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. *  
Dresden 3 85   HOLDING POWER FOR WELD REPAIR OF RFP "A" . 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. *  
Duane Arnold 0 02/04/2007 REFUELING OUTAGE. 4 OF 6 POWER LINES DOWN DUE TO ICING. HAVE 2 161 KV LINES FEEDING THE EAST BUS AND THE WEST BUS. *  
Fermi 2 100   EDG # 11 IS OSS FOR PLANNED MAINTENANCE. STILL HAVE EDGs #12, # 13, & # 14 FULLY OPERABLE IF NEEDED. ONLY NEED TWO TO SUPPORT VITAL BUSSES. *  
Kewaunee 100   FEED FLOW MEASURING INSTRUMENT CALIBRATION ISSUE    
La Salle 1 100        
La Salle 2 87   COASTDOWN TO REFUELING OUTAGE. *  
Monticello 100        
Palisades 100        
Perry 1 100     *  
Point Beach 1 95   INCREASING POWER AFTER COMPLETING PLANNED TESTING *  
Point Beach 2 100        
Prairie Island 1 100   345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY    
Prairie Island 2 100   345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY    
Quad Cities 1 85   REDUCED POWER FOR SCRAM TIME TESTING AND ROD SHUFFLE *  
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 0 02/24/2007 REFUELING OUTAGE *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 98   COASTDOWN TO REFUELING OUTAGE    
Palo Verde 1 100        
Palo Verde 2 0 02/19/2007 SEE EN #43173    
Palo Verde 3 99     *  
River Bend 1 100        
San Onofre 2 100     *  
San Onofre 3 100        
South Texas 1 100        
South Texas 2 94   COASTDOWN TO REFUELING OUTAGE *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours