Power Reactor Status Report for November 16, 2006
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 89 | RESCALING OVER TEMP DELTA T INSTRUMENTS | * | ||
Calvert Cliffs 1 | 100 | TRANSFORMER P-1300-2 OOS | * | ||
Calvert Cliffs 2 | 0 | 11/15/2006 | RX TRIP SEE EN 42995 TRANSFORMER P-13000-2 OOS | * | 1 |
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 0 | 11/15/2006 | RX TRIP SEE EN 42993 STARTUP IN PROGRESS | * | 1 |
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 0 | 10/06/2006 | STARTUP PREPARATIONS IN PROGRESS | * | |
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | * | |||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 54 | DOWNPOWER PERFORM PLANNED OUTAGE OF 345 KV LINE #381 AND WATERBOX CLEANING | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
Browns Ferry 2 | 100 | 2 (500 KV) OF 7 OFFSITE LINES OOS. | |||
Browns Ferry 3 | 100 | 2 (500 KV) OF 7 OFFSITE LINES OOS. | |||
Brunswick 1 | 100 | TORNADO WATCH | * | ||
Brunswick 2 | 0 | 11/01/2006 | SCRAM - SEE EN #42986 TORNADO WATCH | * | |
Catawba 1 | 0 | 11/10/2006 | REFUELING OUTAGE | ||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | * | |||
North Anna 1 | 0 | 11/12/2006 | PLANNED MID-CYCLE OUTAGE FOR PZR MANWAY REPAIR | * | |
North Anna 2 | 0 | 11/15/2006 | RX TRIP SEE EN 42996 | * | 1 |
Oconee 1 | 0 | 10/06/2006 | REFUELING OUTAGE | * | |
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 92 | COASTDOWN TO REFUELING OUTAGE | * | ||
Summer | 0 | 10/13/2006 | REFUELING OUTAGE | ||
Surry 1 | 100 | TORNADO WATCH | * | ||
Surry 2 | 0 | 10/07/2006 | STARTUP PREPARATIONS IN PROGRESS TORNADO WATCH | * | |
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 10/30/2006 | DEFUELED | ||
Vogtle 1 | 100 | * | |||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 0 | 09/10/2006 | REFUELING OUTAGE |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | U1 TRANSFORMER OUTAGE | * | ||
Byron 2 | 100 | * | |||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 60 | INCREASING POWER | * | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 85 | 83% ELECTRICAL CAPABILITY - HOLDING POWER DUE TO DAMAGED FEEDWATER HEATER | |||
Dresden 3 | 0 | 11/03/2006 | REFUELING OUTAGE | ||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 98 | INCREASING POWER | * | ||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 0 | 10/15/2006 | ROD TESTING | * | |
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 11/14/2006 | REFUELING OUTAGE | * | |
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 85 | INCREASING POWER | * | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 0 | 10/20/2006 | REFUELING OUTAGE | * | |
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 0 | 09/09/2006 | REFUELING OUTAGE | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 69 | PHYSICS TESTING | * | ||
Palo Verde 3 | 100 | ||||
River Bend 1 | 74 | PLANNED WATER BOX AND REACTOR WATER CLEANUP OUTAGE | |||
San Onofre 2 | 99 | STEAM GENERATOR TUBE PLUGGING LIMITATION | |||
San Onofre 3 | 0 | 10/16/2006 | DEFUELED | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |